Legislation Details

File #: 260965    Version: 0 Name:
Type: Bill Status: IN COMMITTEE
File created: 11/12/2026 In control: Committee on Finance
On agenda: Final action:
Title: Approving the amendment of the Fiscal Year 2027 Capital Budget providing for expenditures for the capital purposes of the Philadelphia Gas Works (including the supplying of funds in connection therewith) subject to certain constraints and conditions and acknowledging the receipt of the Revised Forecast of Capital Budgets for Fiscal Years 2028 through 2032, as amended.
Sponsors: Council President Johnson, Councilmember Gilmore Richardson
Indexes: CAPITAL BUDGET, PHILADELPHIA GAS WORKS

 

Title

Approving the amendment of the Fiscal Year 2027 Capital Budget providing for expenditures for the capital purposes of the Philadelphia Gas Works (including the supplying of funds in connection therewith) subject to certain constraints and conditions and acknowledging the receipt of the Revised Forecast of Capital Budgets for Fiscal Years 2028 through 2032, as amended.

 

Body

WHEREAS, Section IV.2.b of the Agreement Between the City of Philadelphia and the Philadelphia Facilities Management Corporation for the Management and Operation of the Philadelphia Gas Works (“Management Agreement”) requires the Philadelphia Facilities Management Corporation (“PFMC”) to prepare annually for the Philadelphia Gas Works (“PGW”) a proposed capital budget for the ensuing year and a forecast for the six (6) years comprising the ensuing budget year and the five (5) years next following; and

WHEREAS, Section IV.2.b of the Management Agreement also requires that the proposed capital budget and forecast be submitted to the Director of Finance and the Philadelphia Gas Commission (“Gas Commission”) for their review and for submission of said budget and forecast, together with their recommendations thereon, to the Council of the City of Philadelphia (“City Council”) for its approval; and

WHEREAS, Section IV.2.b of the Management Agreement further requires that the proposed capital budget and forecast include a showing of the amounts needed and how the funds required are to be supplied as between funds generated within the business through charges to customers or otherwise and funds to be obtained through capital loans (“Financing Plan”); and

WHEREAS, Section IV.2.c of the Management Agreement requires that all PGW expenditures be made pursuant to approved budgets; and

WHEREAS, PGW filed with the Gas Commission on January 2, 2026 a proposed Fiscal Year (“FY”) 2027 Capital Budget of Three Hundred Ninety Million Five Hundred Sixty-One Thousand Dollars ($390,561,000) (“FY 2027 Capital Budget” or “Budget”) and a Five Year Forecast of Capital Budgets (FY 2028 - FY 2032) (“Forecast”); and

WHEREAS, the Gas Commission’s review of the Budget in its FY 2027 Budgets/Oversight Proceeding culminated in deliberations taken at a public meeting held on May 12, 2026, at which the Gas Commission endorsed a proposed FY 2027 Capital Budget in an amount not to exceed Two Hundred Eight Million Ten Thousand Dollars ($208,010,000) including a revised Financing Plan and revised Forecast with related constraints and conditions related thereto; and

WHEREAS, on June 23, 2026, the Mayor approved Bill No. 260511, wherein City Council approved the foregoing FY2027 Compliance Capital Budget; and

WHEREAS, on July 17, 2026, PGW filed a request to amend its FY 2027 Capital Budget by a total of Thirteen Million Five Hundred Fifty-Two Thousand Dollars ($13,532,000), followed by a July 30, 2026 request to extend the lifespans of eight projects by one year, two of which require City Council approval; and

WHEREAS, the Gas Commission’s review of the consolidated FY 2027 Capital Budget Amendment Requests culminated in deliberations taken at its public meeting held on October 13, 2026, and whereupon the Gas Commission endorsed reauthorizations and amendments to the FY 2027 Capital Budget adding a total of Thirteen Million Five Hundred Thirty-Two Thousand Dollars ($13,532,000), thereby increasing the total Budget to an amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000) with related constraints and conditions; and

WHEREAS, on October 22, 2026, PGW filed with the Gas Commission an Amended FY 2027 Compliance Capital Budget in the amount of Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000), a revised Financing Plan and a revised Forecast; and

WHEREAS, City Council seeks to provide for evolving capital needs and related expenditures of PGW by incorporating the Gas Commission-endorsed amendments to the FY 2027 Capital Budget reflected in Exhibit 1 hereto; now, therefore,

THE COUNCIL OF THE CITY OF PHILADELPHIA ORDAINS:

 

SECTION 1.                     Approval and Acknowledgment

 

Pursuant to the provisions of Section IV.2.b and IV.2.c of the Management Agreement, the Council:

 

A.                     does hereby approve the Amended FY 2027 Capital Budget for PGW in a total amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000) as reflected in the Amended Compliance Capital Budget and associated revised Financing Plan, subject to the provisions of Sections 4-7 of this Ordinance; and

B.                     does hereby acknowledge receipt of PGW’s Revised Forecast of Capital Budgets for FY 2028 - FY 2032.

SECTION 2.                     Spending Authorization

 

The amounts shown in the approved Amended Compliance Budget are hereby authorized for the purposes shown and shall be available for expenditure as of FY 2027, defined as September 1, 2026 through August 31, 2027, in an aggregate amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty- Two Thousand Dollars ($221,542,000) as reflected in the Amended Compliance Budget and subject to the provisions of Sections 4-7 of this Ordinance. The Amended Compliance Budget (including the revised Financing Plan) is attached as Exhibit 1.

 

SECTION 3.                     Reauthorized Line Items

 

A.                     The following line item from the FY 2023 Capital Budget, as reauthorized by amendment to the FY 2025 and FY 2026 Capital Budgets is hereby reauthorized, with the amended amount consisting of unspent funds carried over from FY 2023, FY 2025, and FY 2026 authorizations into the FY 2027 Capital Budget:

1.                     Replace Porter Street Fueling Station (#73-01-2-08) ($1,797,000).

 

B.                     The following line item from the FY 2024 Capital Budget is hereby reauthorized, with the amended amount consisting of unspent funds carried over from FY 2024 and FY 2026 authorizations:

 

1. Replace LNG Switchgear (#53-02-2-03) ($9,025,000).

 

SECTION 4.                     Constraints and Conditions - Capital Program Protocols

 

During the lifespan of the line items in the approved Amended Compliance Budget, as a condition of approval, PGW shall adhere to the “Capital Program Protocols” (“Protocols”) adopted by the Gas Commission on May 12, 2026. Said Protocols are incorporated herein by reference.

SECTION 5.                     Constraints and Conditions - Line Item Transfer Exclusions

 

Except as necessitated by Emergency Circumstances as set forth in the Protocols at Part 1 - Subpart I.3, no line item referenced herein shall be available as a source of spending authority in transfer transactions.

SECTION 6.                     Constraints and Conditions - Line Item Lifespan Spending authority for these line items shall expire as of August 31, 2027.

SECTION 7.                     Constraints and Conditions - Line Item Spending Authorization

 

A.                     The total combined spending for the following line item from the FY 2023 Capital Budget, as amended by the FY 2025 and FY 2026 Capital Budgets shall not exceed the spending authorization for the project as approved by the aforementioned amendments:

1.                     Replace Porter Street Fueling Station (#73-01-2-08) ($1,797,000).

 

B.                     The total combined spending for the following line item from the FY 2024 Capital Budget shall not exceed the spending authorization for the project as approved in the FY 2024 Capital Budget, as amended by the FY 2026 Capital Budget:

 

1.                     Replace LNG Switchgear (#53-02-2-03) ($9,025,000).

 

SECTION 10. Exhibit

 

Exhibit 1 referenced in this Ordinance and incorporated herein shall be kept on file by the Chief Clerk of City Council and shall be available to the public for inspection, reading, or copying at reasonable times.

 

 

 

 

 

 

 

Exhibit 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHILADELPHIA                     GAS                     WORKS

 

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

AND

FORECAST FISCAL 2028 - 2032 WITH

FISCAL 2027 FINANCING PLAN

 

 

 

 

OCTOBER 13, 2026

 

 

 

 

 

PHILADELPHIA  GAS  WORKS

AMENDED COMPLIANCE

CAPITAL  BUDGET

FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032

 

 2027

 2028- 2032

 

 

CAPITAL BUDGET

FORECAST

TOTAL 6 YEARS

GAS PROCESSING

 

 

 

ADDITIONS

1,675,000

130,000

1,805,000

REPLACEMENTS

  5,156,000

   278,891,000

  284,047,000

TOTAL

  6,831,000

   279,021,000

  285,852,000

 

 

 

 

 

 

 

 

PHILADELPHIA  GAS  WORKS

AMENDED COMPLIANCE

CAPITAL  BUDGET

FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032

 

 2027

 2028- 2032

 

 

CAPITAL BUDGET

FORECAST

TOTAL 6 YEARS

OTHER DEPARTMENTS

 

 

 

ADDITIONS

2,939,000

13,411,000

16,350,000

REPLACEMENTS

  17,438,000

  14,000,000

  31,438,000

TOTAL

  20,377,000

  27,411,000

  47,788,000

 

 

 

 

 

 

 

 

* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD

GROWTH

 

2027                     2026

BUDGET vs                     COMPL BUDGET

 

2027 BUD vs 2027 FORECAST

 

2026 COMPL                     2027

BUDGET                     FORECAST

AMOUNT                                          PERCENT                                          AMOUNT                                          PERCENT DIFFERENCE                     DIFFERENCE                     DIFFERENCE                     DIFFERENCE

226,000

14,350,000

35,000

177,408,000

1,449,000

(9,194,000)

641.2%

-64.1%

1,640,000

(172,252,000)

4685.7%

-97.1%

TOTAL GAS PROCESSING

14,576,000

177,443,000

6,831,000

(7,745,000)

-53.1%

(170,612,000)

-96.2%

DISTRIBUTION

 

ADDITIONS

15,531,000

15,874,000

15,480,000

(51,000)

-0.3%

(394,000)

-2.5%

REPLACEMENTS

130,702,000

134,167,000

145,202,000

14,500,000

11.1%

11,035,000

8.2%

 GROSS TOTAL DISTRIBUTION LESS: SALVAGE LESS: CONTRIBUTIONS* LESS: REIMBURSEMENT**

 146,233,000    (5,497,000)

 150,041,000    (5,613,000)

 160,682,000    (8,478,000)

 14,449,000    (2,981,000)

 9.9% N/A N/A 54.2%

 10,641,000    (2,865,000)

 7.1% N/A N/A 51.0%

 NET TOTAL DISTRIBUTION  FIELD SERVICES

 140,736,000

 144,428,000

 152,204,000

 11,468,000

 8.1%

 7,776,000

 5.4%

ADDITIONS

2,598,000

2,641,000

2,906,000

308,000

11.9%

265,000

10.0%

REPLACEMENTS

6,101,000

14,046,000

17,600,000

11,499,000

188.5%

3,554,000

25.3%

 GROSS TOTAL FIELD SERVICES LESS: SALVAGE LESS: CONTRIBUTIONS*

 8,699,000

 16,687,000

 20,506,000

 11,807,000

 135.7% N/A N/A

 3,819,000

 22.9% N/A N/A

 NET TOTAL FIELD SERVICES

 8,699,000

 16,687,000

 20,506,000

 11,807,000

 135.7%

 3,819,000

 22.9%

 

 

 

 

 

 

2027

2026

 

 

 

 

 

 

BUDGET vs

COMPL BUDGET

2027 BUD vs 2027 FORECAST

 

 2026 COMPL

 2027

2027 AMENDED COMPL

 AMOUNT

 PERCENT

 AMOUNT

 PERCENT

DEPARTMENT

BUDGET

FORECAST

BUDGET

DIFFERENCE

DIFFERENCE

DIFFERENCE

DIFFERENCE

FLEET OPERATIONS

 

 

 

 

 

 

 

ADDITIONS

137,000

-

326,000

189,000.00

138.0%

326,000.00

N/A

REPLACEMENTS

10,234,000

12,951,000

12,820,000

2,586,000

25.3%

(131,000)

-1.0%

GROSS TOTAL FLEET

 

 

 

 

 

 

 

OPERATIONS

10,371,000

12,951,000

13,146,000

2,775,000

26.8%

195,000

1.5%

LESS: SALVAGE

 

 

 

 

N/A

 

N/A

 NET TOTAL TRANSPORTATION

 10,371,000

 12,951,000

 13,146,000

 2,775,000

 26.8%

 195,000

 1.5%

 OTHER

 

 

 

 

 

 

 

ADDITIONS

3,831,000

440,000

2,939,000

(892,000)

-23.3%

2,499,000

568.0%

REPLACEMENTS

31,502,000

1,012,000

17,438,000

(14,064,000)

-44.6%

16,426,000

1623.1%

 TOTAL OTHER

 35,333,000

 1,452,000

 20,377,000

 (14,956,000)

 -42.3%

 18,925,000

 1303.4%

 TOTAL

 

 

 

 

 

 

 

ADDITIONS

22,323,000

18,990,000

23,326,000

1,003,000

4.5%

4,336,000

22.8%

REPLACEMENTS

192,889,000

339,584,000

198,216,000

5,327,000

2.8%

(141,368,000)

-41.6%

 GROSS TOTAL

 215,212,000

 358,574,000

 221,542,000

 6,330,000

 2.9%

 (137,032,000)

 -38.2%

LESS: SALVAGE

 

 

 

 

N/A

 

N/A

LESS: REIMBURSEMENT**

(5,497,000)

(5,613,000)

(8,478,000)

(2,981,000)

54.2%

(2,865,000)

51.0%

LESS: CONTRIBUTIONS*

 

 

 

 

N/A

 

N/A

 NET TOTAL

 209,715,000

 352,961,000

 213,064,000

 3,349,000

 1.6%

 (139,897,000)

 -39.6%

 

 

* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

 

 

PHILADELPHIA GAS WORKS

AMENDED COMPLIANCE

SUMMARY ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

 

EXPENDED 4,564,000

6,970,000                     48,632,000

 

1,112,000                     -                     10,848,000                     -                     11,960,000

 

-                     -                     1,706,000                     -                     1,706,000

 

-                     -                     -                     -                     -

 

TOTAL

  23,326,000

 

  23,326,000

 

  198,216,000

 

  193,536,000

 

  221,542,000

 

  216,862,000

 

 

GAS PROCESSING DEPARTMENT

AMENDED COMPLIANCE

SUMMARY

 

 

 

53-0

 

 

 

1,652,000                     3,065,000                     -                     4,717,000

 

 

-                     -                     -                     -

 

 

23,000                     314,000                     -                     337,000

 

 

 

TOTAL GAS PROCESSING                                           1,675,000                      5,156,000                      -                                           6,831,000

 

GAS PROCESSING DEPARTMENT

AMENDED COMPLIANCE

BUDGET/FORECAST COMPARISON

 

2027                     2026

BUDGET vs COMPL BUDGET

2027 BUD vs 2027 FORECAST

 

 

CATEGORY

 

53-01   NATURAL GAS                     ADDITIONS MEASUREMENT

AND                     REPLACEMENTS CONTROL

FACILITIES

TOTAL

 

 

 

53-02

 

SUPPLEMENTAL

GAS                     ADDITIONS

FACILITIES                     REPLACEMENTS

 

TOTAL

(7,059,000)

-59.9% (171,516,000)

-97.3%

 

53-03   BUILDING AND                     ADDITIONS                     -

GROUNDS                     REPLACEMENTS                                           -

 

TOTAL                     -

 

N/A N/A

 

N/A

 

-                     N/A

0                     N/A

 

0                     N/A

 

53-04   MISC CAPITAL                                          ADDITIONS REQUIREMENTS                     REPLACEMENTS

 

TOTAL

 

(11,000)

                      (24,000)

 

(35,000)

 

-32.4%

-7.1%

 

-9.4%

 

(12,000)

(32,000)

 

(44,000)

 

-34.3%

-9.2%

 

-11.5%

 

REAUTHORIZATION

 

 

ADDITIONS                     -

REPLACEMENTS                                           -

 

TOTAL                     -

 

 

N/A N/A

 

N/A

 

 

-                     N/A

-                     N/A

 

-                     N/A

 

TOTAL GAS PROCESSING

(7,745,000)

-53.1% (170,612,000)

-96.2%

                                                                                                         

 

GAS PROCESSING DEPARTMENT

LISTING BY PRIORITY

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

 

P  

CATEGORY

                      PRIORITY 1                     

AMOUNT                     BUDGET YR                     YEAR 1                     YEAR 2                     YEAR 3

 

1                     GP-1                     53-01-2-03                     360,000                     360,000                     1,057,000                     -

 

270,000                     270,000                     1,112,000                     -

 

208,000                     208,000                     782,000                     -

 

1

GP-2

53-02-2-02

GATE 5 MODIFICATIONS - RICHMOND

1,867,000

360,000

360,000

1,147,000

-

 

1

GP-4

53-04-1-01

MISCELLANEOUS CAPITAL ADDITIONS

23,000

5,000

18,000

-

-

 

1

GP-4

53-04-2-01

MISCELLANEOUS CAPITAL REPLACEMENTS

314,000

60,000

254,000

-

-

 

PRIORITY 2

 

-                     -                     -                     -

 

2024 REAUTHORIZATION

REPLACE LNG SWITCHGEAR - RICHMOND*                     -                     -                     -                     -                     -

 

2025 REAUTHORIZATION

REPLACE NATURAL GAS DRIVEN POSITIONERS AND ACTUATORS*                     -                     -                     -                     -                     -

 

REPLACE MCC 1,2,3 - RICHMOND*                     -                     -                     -                     -                     -

 

UPGRADE H-1 HEATER CONTROLS - RICHMOND*                     -                     -                     -                     -                     -

 

BOILOFF GAS COMPRESSORS REPLACEMENTS - PASSYUNK*                     -                     -                     -                     -                     -

 

TOTAL GAS PROCESSING DEPARTMENT:

  6,831,000

1,263,000

1,470,000

4,098,000 -

*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS

 

 

 

 

GAS PROCESSING DEPARTMENT

 

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

P

AMOUNT

GP-1

NATURAL GAS MEASUREMENT AND CONTROL FACILITIES

 

1

53-01-2-03

NEW HEATER, GENERATOR AND STATION MODIFICATIONS

1,777,000

 

 

TOTAL GP-1

1,777,000

 

GP-2

SUPPLEMENTAL GAS FACILITIES

 

1

53-02-1-01

INSTALL NEW ODORANT SYSTEM AT PENROSE

1,652,000

 

1

53-02-2-01

UPGRADE PA SYSTEM - RICHMOND

1,198,000

 

1

53-02-2-02

GATE 5 MODIFICATIONS - RICHMOND

1,867,000

 

2

53-02-2-22

REPLACE LIQUEFIER - RICHMOND

-

 

 

TOTAL GP-2

4,717,000

 

GP-4

MISCELLANEOUS CAPITAL REQUIREMENTS

 

1

53-04-1-01

MISCELLANEOUS CAPITAL ADDITIONS

23,000

 

1

53-04-2-01

MISCELLANEOUS CAPITAL REPLACEMENTS

314,000

 

337,000

 

2024 REAUTHORIZATION

REPLACE LNG SWITCHGEAR - RICHMOND*                     -

 

2025 REAUTHORIZATION

REPLACE NATURAL GAS DRIVEN POSITIONERS AND ACTUATORS*                     -

 

2

53-02-2-07

REPLACE MCC 1,2,3 - RICHMOND*

-

 

1

53-02-2-08

UPGRADE H-1 HEATER CONTROLS - RICHMOND*

-

 

2

53-03-1-01

BOILOFF GAS COMPRESSORS REPLACEMENTS - PASSYUNK*

-

 

TOTAL REAUTHORIZATION

 

 

TOTAL GAS PROCESSING DEPARTMENT

6,831,000

 

*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS

 

 

PHILADELPHIA  GAS WORKS

AMENDED COMPLIANCE

GAS PROCESSING DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

TOTAL ENCUMBERED

6,831,000

 

 

 

 

 

-                     -                     -                     -

 

-                     -                     -                     -                     -

 

TOTAL

  1,675,000

 

  1,675,000

 

  5,156,000

 

  5,156,000

 

  6,831,000

 

  6,831,000

 

DISTRIBUTION DEPARTMENT AMENDED COMPLIANCE SUMMARY

 

CATEGORY                     ADDITIONS

 

REPLACEMENTS GROSS TOTAL

REIMBURSEM

ENT**

 

NET TOTAL

 

52-20                     GAS MAINS - HIGH PRESSURE (WITH ASSOCIATED VALVES AND REGULATORS)

 

52-21                     GAS MAINS - LOW AND INTERMEDIATE PRESSURE - 8 INCH AND SMALLER

 

52-22                     GAS MAINS - LOW AND INTERMEDIATE PRESSURE - 12 INCH AND LARGER

 

52-23                     CUST MTR & REG INSTALL, PRESSURE  REGULATION & CORROSION CONTROL FACILITIES

 

52-24                     SERVICES

 

52-25                     CONDITIONED RESERVED

 

52-29 OTHER DISTRIBUTION FACILITIES

 

 

TOTAL DISTRIBUTION

 

 

* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

 

DISTRIBUTION DEPARTMENT

AMENDED COMPLIANCE

BUDGET/FORECAST COMPARISON

 

2027                     2026

BUDGET vs COMPL BUDGET

2027 BUD vs 2027 FORECAST

 

 

CATEGORY

$                     %                     $                     %

DIFF.                     DIFF.                     DIFF.                     DIFF.

 

52-20                     GAS MAINS - HIGH                                          ADDITIONS PRESSURE (WITH                     REPLACEMENTS ASSOCIATED VALVES

AND REGULATORS)                     TOTAL

 

52-21                     GAS MAINS - LOW                                          ADDITIONS AND INTERMEDIATE                     REPLACEMENTS PRESSURE - 8 INCH

AND SMALLER                     TOTAL

 

52-22                     GAS MAINS - LOW                                          ADDITIONS AND INTERMEDIATE                     REPLACEMENTS PRESSURE - 12 INCH

AND LARGER                     TOTAL

 

52-23                     CUST MTR & REG INST,                                          ADDITIONS PRESSURE REGULA-                     REPLACEMENTS TION AND CORROSION

CONTROL FACILITIES                     TOTAL

 

52-24                     SERVICES                                          ADDITIONS REPLACEMENTS

 

TOTAL

 

52-25

CONDITIONED FUNDING RESERVED

 

52-29  OTHER DISTRIBUTION                                          ADDITIONS FACILITIES                     REPLACEMENTS

 

TOTAL GROSS TOTAL DISTRIBUTION DEPARTMENT

52-99

COST OF REMOVAL AND ABANDONMENT

 

LESS:

SALVAGE

 

LESS:

CONTRIBUTIONS*

 

LESS:

REIMBURSEMENT**

 

NET TOTAL DISTRIBUTION

6.8%

-12.9%

 

2.4%

 

-1.5%

9.2%

 

8.9%

 

1.6%

87.9%

 

82.2%

 

17.9%

11.4%

 

12.5%

 

-3.0%

8.5%

 

5.3%

 

9.9%

 

3.3%

0.5%

 

1.0%

 

9.9%

 

N/A N/A N/A 54.2%

 

8.1%

136,000

(128,000)

 

8,000

 

(90,000)

6,094,000

 

6,004,000

 

(2,000)

3,132,000

 

3,130,000

 

48,000

133,000

 

181,000

 

(489,000)

1,513,000

 

1,024,000

 

310,000

 

3,000.00

(19,000)

 

(16,000)

 

10,641,000

 

-

-

- (2,865,000)

 

7,776,000

4.6%

-14.8%

 

0.2%

 

-3.7%

6.2%

 

6.0%

 

-0.8%

83.9%

 

78.3%

 

15.3%

9.0%

 

10.1%

 

-5.1%

6.2%

 

3.0%

 

7.1%

 

1.1%

-1.7%

 

-1.1%

 

7.1%

 

N/A N/A N/A 51.0%

 

5.4%

                                          

 

 

* DISTRIBUTION DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

 

                     

 

4

52-20-1-01

MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND

3,122,000

15,984

 

 

COMMERCIAL CUSTOMERS

 

 

 

3

52-20-2-01

ENFORCED RELOCATIONS CAUSED BY CITY AND STATE WORK

736,000

1,444

 

 

52-20-2-97

 

 

 

 

 

D-21

 

4

52-21-1-01

MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING

2,353,000

7,280

 

 

RESIDENTIAL, COMMERCIAL, AND MAJOR ACCOUNT CUSTOMERS

 

 

 

3

52-21-2-01

ENFORCED RELOCATIONS CAUSED BY CITY, STATE /UNFORSEEN

5,656,000

18,258

 

 

CONDITIONS

 

 

 

1

52-21-2-02

PRUDENT MAIN REPLACEMENTS

26,378,000

92,791

 

1

52-21-2-03

LONG TERM INFRASTRUCTURE PLAN - DSIC

42,551,000

1

52-21-2-04

NG DIST INFRASTRUCTURE SAFETY AND MODERNIZATION

29,593,000

 

GROSS TOTAL D-21                     106,531,000

52-21-2-97                     LESS: REIMBURSEMENT**                     (2,932,000)

 

NET TOTAL D-21                     

  103,599,000

AMOUNT

FEET UNITS

 

D-22

 

4

52-22-1-01

MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL

262,000

818

 

 

CUSTOMERS

 

 

 

3

52-22-2-01

ENFORCED RELOCATIONS CAUSED BY CITY, STATE WORK

703,000

1,791

 

 

AND UNFORESEEN CONDITIONS

 

 

 

3

52-22-2-02

MAIN FOR MAJOR ENFORCED RELOCATION CAUSED BY CITY/STATE

6,162,000

 

GROSS TOTAL D-22                                          7,127,000 LESS: REIMBURSEMENT**                     (5,546,000)

 

NET TOTAL D-22                     

  1,581,000

 

 

 

 

D-23

 

4

52-23-1-01

INSTALL OF METERS/REGULATORS FOR NEW CUSTOMERS

362,000

 

1

52-23-2-01

EMERGENCY SHUTDOWN VALVES OUT OF COMPLI WITH DOT 192

476,000

2

52-23-2-02

REPL OF WORN DAMAGED PRESSURE REGULATING/CORROSION

1,140,000

 

 

CONTROL FACILITIES

 

 

 

GROSS TOTAL D-23

1,978,000

 

 

LESS: REIMBURSEMENT**

 

 

 

LESS: POTENTIAL CUSTOMER CONTRIBUTIONS*  

 

 

NET TOTAL D-23

  1,978,000

AMOUNT

FEET UNITS

 

D-24

SERVICES

 

4

52-24-1-01

INSTALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH,

6,488,000

1,413

 

 

INTERMEDIATE AND LOW PRESSURE

 

 

 

4

52-24-1-02

INSTALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH,

2,609,000

168

 

 

INTERMEDIATE AND LOW PRESSURE

 

 

 

1

52-24-2-01

RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT

24,596,000

7,845

 

 

REASONS, AS A RESULT OF PGW'S MAIN REPL PROG, CUSTOMER

 

 

 

 

COMPLAINTS OR CITY AND STATE WORK

 

 

 

1

52-24-2-02

RENEWAL OF 2" AND LARGER SERVICES

1,415,000

116

 

GROSS TOTAL D-24

35,108,000

LESS: REIMBURSEMENT**

 

 

NET TOTAL D-24

  35,108,000

 

D-25

CONDITIONED FUNDING

 

1 52-25-2-01

CONDITIONED FUNDING RESERVED

4,680,000

 

NET TOTAL D-25

  4,680,000

 

 

D-29

OTHER DISTRIBUTION FACILITIES

 

2

52-29-1-01

ADDITIONAL TOOLS AND WORK EQUIPMENT

284,000

 

2

52-29-2-01

REPLACEMENT OF UNUSABLE WORK EQUIPMENT

1,116,000

 

NET TOTAL D-29

  1,400,000

 

 DISTRIBUTION DEPARTMENT

 

 

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

 

P

AMOUNT

FEET UNITS

GROSS TOTAL DISTRIBUTION DEPARTMENT

160,682,000

 

 

 

 

52-98-2-98

 

 

 

 

*** DISTRIBUTION DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

DISTRIBUTION DEPARTMENT

AMENDED COMPLIANCE

DISTRIBUTION COMPRESSED CATEGORIES

 

 

 

2026 COMPL

2027

2027 AMENDED COMPL

CATEGORIES

BUDGET

FORECAST

BUDGET

MAIN ADDITIONS

5,570,000

5,693,000

5,737,000

MAIN REPLACEMENTS

99,910,000

102,681,000

111,779,000

SERVICE ADDITIONS

9,379,000

9,586,000

9,097,000

SERVICE REPLACEMENTS

23,971,000

24,498,000

26,011,000

METER/REGULATOR/CORROSION

1,758,000

1,797,000

1,978,000

TOOLS

1,386,000

1,416,000

1,400,000

CONDITIONED FUNDING RESERVE

4,259,000

4,370,000

4,680,000

GROSS TOTAL DISTRIBUTION

146,233,000

150,041,000

160,682,000

 

 

 

 

1 D-2

 

1

D-21

52-21-2-03

LONG TERM INFRASTRUCTURE PLAN - DSIC

42,551,000

29,173,000

13,378,000

-

-

1

D-21

52-21-2-04

NG DIST INFRASTRUCTURE SAFETY AND MODERNIZATION

29,593,000

18,217,000

5,688,000

3,982,000

1,706,000

 

1

D-23

52-23-2-01

EMERGENCY SHUTDOWN VALVES OUT OF COMPLI WITH DOT 192

476,000

171,000

305,000

-

-

 

1

D-24

52-24-2-02

RENEWAL OF 2" AND LARGER SERVICES

1,415,000

116

908,000

507,000

-

-

 

1

D-24

52-24-2-01

RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT

24,596,000

7,845

23,926,000

670,000

-

-

 

 

 

PRIORITY 2

  2

  D-29

  52-29-1-01

  ADDITIONAL TOOLS AND WORK EQUIPMENT

  284,000

  237,000

  47,000

  -

  -

 

2

D-29

52-29-2-01

REPLACEMENT OF UNUSABLE WORK EQUIPMENT

1,116,000

567,000

549,000

-

-

 

-                     -

 

 P

 

 CATEGORY

 

 AMOUNT

FEET  UNITS

 BUDGET YR

 YEAR 1

 YEAR 2

 YEAR 3

 

 

PRIORITY  3

 

 

 

 

 

 

3

D-20

52-20-2-01

ENFORCED RELOCATIONS CAUSED BY CITY AND STATE WORK

736,000

1,444

224,000

512,000

-

-

 

3

D-21

52-21-2-01

ENFORCED RELOCATIONS CAUSED BY CITY, STATE /UNFORSEEN

5,656,000

18,258

5,537,000

119,000

-

-

 

3

D-22

52-22-2-01

ENFORCED RELOCATIONS CAUSED BY CITY, STATE WORK

703,000

1,791

239,000

464,000

-

-

 

2,511,000

 

 

 

PRIORITY 4

MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND

3,122,000

15,984

1,556,000

1,566,000

- -

MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING

2,353,000

7,280

1,261,000

1,092,000

- -

STALL OF METERS/REGULATORS FOR NEW CUSTOMERS

362,000

-

208,000

154,000

- -

MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL

262,000

818

152,000

110,000

- -

STALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH,

6,488,000

1,413

5,062,000

1,426,000

- -

STALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH,

2,609,000

168

2,313,000

296,000

- -

 

 

TOTAL DISTRIBUTION  DEPARTMENT:      160,682,000                     114,036,000                     36,278,000                     3,982,000                     1,706,000

 

PHILADELPHIA  GAS WORKS

AMENDED COMPLIANCE

DISTRIBUTION DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

 

 

EXPENDED 4,036,000

4,691,000                     -                     31,587,000                     -                     36,278,000

 

-                     -                     3,982,000                     -                     3,982,000

 

-                     -                     1,706,000                     -                     1,706,000

 

-                     -                     -                     -                     -

 

TOTAL

  15,480,000

 

  15,480,000

 

  145,202,000

 

  140,522,000

 

  160,682,000

 

  156,002,000

 

 

FIELD SERVICES DEPARTMENT

AMENDED COMPLIANCE

SUMMARY

 

 

ADDITIONS

50-3                     2,780,000

 

46,000                     147,000                     193,000

 

 

80,000                     547,000                     627,000

 

 

-                     154,000                     154,000

 

GROSS TOTAL FIELD SERVICES                     2,906,000                     17,600,000                     20,506,000

 

 

                                                                                                                                    NET TOTAL FIELD SERVICES                                           2,906,000                         17,600,000                         20,506,000

 

 

* FIELD SERVICES DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

 

FIELD SERVICES DEPARTMENT

AMENDED COMPLIANCE

BUDGET/FORECAST COMPARISON

 

 

 

 

CATEGORY

 

50-30 METERS                                          ADDITIONS REPLACEMENTS

 

TOTAL

 

SERVICE

50-32                     REGULATORS                     ADDITIONS AND

INSTALLATIONS REPLACEMENTS

 

TOTAL

 

 

50-33                     TELEMETERING                     ADDITIONS AND

INSTALLATIONS REPLACEMENTS

TOTAL ADDITIONS

REPLACEMENTS

 

TOTAL

 

SERVICE

50-35                     SECTION                                          ADDITIONS EQUIPMENT                     REPLACEMENTS

 

TOTAL

 

AUTOMATIC

50-36                     METER                     ADDITIONS

READING                     REPLACEMENTS TOTAL

GROSS TOTAL FIELD SERVICES

LESS: SALVAGE

LESS: CONTRIBUTIONS*

 

NET TOTAL FIELD SERVICES

                                                                                    

 

 

 

 

* FIELD SERVICES DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

 

 

 

 

AMOUNT

 

 

4

50-30-1-01

PURCHASE AND INSTALLATION OF METERS TO PROVIDE FOR

2,780,000

 

 

NEW CUSTOMERS

 

 

5

50-30-2-01

PURCHASE METERS TO SUPPORT METER TESTING

16,752,000

 

TOTAL C-30

  19,532,000

 

 

C-32

SERVICE REGULATORS

 

4

50-32-1-01

PURCHASE AND INSTALLATION OF SERVICE REGULATORS

46,000

 

2

50-32-2-01

PURCHASE VARIOUS SIZE SERVICE REGULATORS AS REPLACEMENTS

147,000

 

TOTAL C-32

  193,000

 

 

C-33

COMMERCIAL & INDUSTRIAL TELEMETERING SYSTEMS

 

4

50-33-1-01

NON-RESIDENTIAL ENDPOINT ADDITIONS

80,000

 

2

50-33-2-01

NON-RESIDENTIAL ENDPOINT REPLACEMENTS

547,000

 

TOTAL C-33

  627,000

 

 

C-34

METER SHOP EQUIPMENT

 

 

2

50-34-2-01

REPL OBSOLETE SHOP EQUIP, HAND-HELD TOOLS/ SW PACKAGE FOR AMR

154,000

 

TOTAL C-34

  154,000

 

 

 

50-98-2-98

 

 

NET TOTAL FIELD SERVICES DEPARTMENT

  20,506,000

 

 

FIELD SERVICES DEPARTMENT

LISTING BY PRIORITY

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

 

AMOUNT   BUDGET YR                     YEAR 1                     YEAR 2                     YEAR 3

                      PRIORITY 2                     

PURCHASE VARIOUS SIZE SERVICE REGULATORS AS REPLACEMENTS                     147,000                     147,000                     -                     -                     -

 

2

C-33

50-33-2-01

NON-RESIDENTIAL ENDPOINT REPLACEMENTS

547,000

55,000

492,000

-

-

 

2

C-34

50-34-2-01

REPL OBSOLETE SHOP EQUIP, HAND-HELD TOOLS/ SW PACKAGE FOR AMR

154,000

139,000

15,000

-

-

 

 

 

  PRIORITY 4

 

 

 

 

 

4

C-30

50-30-1-01

PURCHASE AND INSTALLATION OF METERS TO PROVIDE FOR NEW CUSTOMERS

2,780,000

2,780,000

-

-

-

 

4

C-32

50-32-1-01

PURCHASE AND INSTALLATION OF SERVICE REGULATORS

46,000

46,000

-

-

-

 

4

C-33

50-33-1-01

NON-RESIDENTIAL ENDPOINT ADDITIONS

80,000

24,000

56,000

-

-

 

PRIORITY 5

 5

 C-30

 50-30-2-01

 PURCHASE METERS TO SUPPORT METER TESTING

 16,752,000

 11,269,000

 5,483,000

 -

 -

 

TOTAL FIELD SERVICES DEPARTMENT:

    20,506,000       14,460,000  6,046,000  -   -

 

 

 

PHILADELPHIA  GAS WORKS

AMENDED COMPLIANCE

FIELD SERVICES DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

 

 

TOTAL ENCUMBERED

20,506,000

 

56,000                     -                     5,990,000                     -                     6,046,000

 

-                     -                     -                     -                     -

 

-                     -                     -                     -                     -

 

-                     -                     -                     -                     -

 

TOTAL

  2,906,000

 

  2,906,000

 

  17,600,000

 

  17,600,000

 

  20,506,000

 

  20,506,000

 

FLEET OPERATIONS DEPARTMENT

AMENDED COMPLIANCE

BUDGET/FORECAST COMPARISON

 

2027                     2026

BUDGET vs COMPL BUDGET

2027 BUD vs 2027 FORECAST

 

 

CATEGORY

$                                          %                                          $                     % DIFFERENCE                     DIFF.                     DIFFERENCE DIFF.

 

73-01-1-02                     MOBILE EQUIPMENT ADDITIONS

 

73-01-1-03                     VEHICLE ADDITIONS

 

73-01-1-01 SHOP EQUIPMENT ADDITIONS

 

73-01-2-02                     MOBILE EQUIPMENT REPLACEMENTS

 

73-01-2-03                     VEHICLE REPLACEMENTS (2-YEAR)

 

73-01-2-04                     VEHICLE REPLACEMENTS (3-YEAR)

 

GROSS TOTAL FLEET OPERATIONS LESS: SALVAGE

NET TOTAL FLEET OPERATIONS

326,000

 

(39,000)

 

(98,000)

 

397,000

 

(2,715,000)

 

4,904,000

 

2,775,000

 

 

2,775,000

N/A

 

-100.0%

 

-100.0%

 

24.6%

 

-31.5%

N/A 26.8%

N/A 26.8%

326,000.00

 

-

 

- (107,000)

(4,928,000)

 

4,904,000

 

195,000

 

 

195,000

N/A N/A N/A

-5.1%

 

-45.5%

N/A 1.5%

N/A 1.5%

 

FLEET OPERATIONS DEPARTMENT

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

P                     AMOUNT

 

1

73-01-1-02

MOBILE EQUIPMENT ADDITIONS

326,000

 

2

73-01-2-02

MOBILE EQUIPMENT REPLACEMENTS

2,010,000

 

2

73-01-2-03

VEHICLE REPLACEMENTS (2-YEAR)

5,906,000

 

273-01-2-04VEHICLE REPLACEMENTS (3-YEAR)4,904,000

 

 

 

 

GROSS TOTAL FLEET OPERATIONS

13,146,000

 

NET TOTAL FLEET OPERATIONS  

13,146,000

 

FLEET OPERATIONS DEPARTMENT

LISTING BY PRIORITY

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

AMOUNT   BUDGET YR                     YEAR 1                     YEAR 2                     YEAR 3

                      PRIORITY 1                     

 

1                     326,000                     -                     -                     -

 

PRIORITY 2

 

2                     2,010,000                     -                     -                     -

 

2                     982,000                     -                     -

 

2                     000                     -

 

000                     -

 

 

 

 

PHILADELPHIA  GAS WORKS

AMENDED COMPLIANCE

FLEET OPERATIONS DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

 

 

TOTAL ENCUMBERED

13,146,000

 

 

 

 

 

-                     -                     -                     -                     -

 

-                     -                     -                     -                     -

 

TOTAL

  326,000

 

  326,000

 

  12,820,000

 

  12,820,000

 

  13,146,000

 

  13,146,000

 

-

FACILITIES

AMENDED COMPLIANCE

 

 

BUDGET/FORECAST

COMPARISON

 

 

 

 

 

 

 

 

2027

2026

2027 BUD vs 2027  FORECAST

 

 

 

 

BUDGET vs

COMPL BUDGET

 

 

  2026 COMPL

  2027

2027 AMENDED COMPL

  $

  %

  $

  %

CATEGORY

 

BUDGET

FORECAST

BUDGET

DIFF.

DIFF.

DIFF.

DIFF.

72-01-1-01

MISCELLANEOUS CAPITAL ADDITIONS

84,000

85,000

107,000

23,000

27.4%

22,000

25.9%

 72-01-1-02

MISCELLANEOUS CAPITAL ADDITIONS - GAS

 

 

 

 

 

 

 

 

PROCESSING

5,000

5,000

6,000

1,000

20.0%

1,000

20.0%

 72-01-2-01

MISCELLANEOUS CAPITAL

 

 

 

 

 

 

 

 

REPLACEMENTS/STRUCTURAL REPAIRS

368,000

375,000

289,000

(79,000)

-21.5%

(86,000)

-22.9%

 72-01-2-02

MISCELLANEOUS CAPITAL REPLACEMENTS - GAS

 

 

 

 

 

 

 

 

PROCESSING

20,000

20,000

20,000

-

0.0%

-

0.0%

 72-01-2-03

MISC CAPITAL REPL - STRUCTURAL REPAIRS - GAS

 

 

 

 

 

 

 

 

PROCESSING

12,000

12,000

13,000

1,000

8.3%

1,000

8.3%

72-01-2-04

REPLACE CARPETS

50,000

50,000

50,000

-

0.0%

-

0.0%

72-01-2-05

REPLACE MODULAR FURNITURE

50,000

50,000

50,000

-

0.0%

-

0.0%

 72-02-1-01

NOC OUTDOOR MATERIAL LAYDOWN YARD PAVING

 

 

 

 

 

 

 

 

 

-

-

410,000

410,000

N/A

410,000

N/A

 72-02-1-02

800 BUILDING CHILLER PLANT

 

 

 

 

 

 

 

 

SEQUENCING/OPTIMIZATION

-

-

340,000

340,000

N/A

340,000

N/A

72-01-2-08

SOUTH OPERATIONS CENTER (SOC)

-

-

13,532,000

13,532,000

N/A

13,532,000

 

 

2023 REAUTHORIZATION

 

 

 

 

 

 

 

72-01-2-08

REPLACE PORTER FUELING STATION*

-

-

-

-

N/A

-

 

 

2025 REAUTHORIZATION

 

 

 

-

 

 

 

72-01-2-06

800 BUILDING 1ST FLOOR RENOVATIONS PHASE 2*

-

-

-

-

N/A

-

N/A

 

 

 

 

 

 

 

 

N/A

72-01-2-05

800 BUILDING STAIR TOWER RENOVATION*

-

-

-

-

N/A

-

N/A

 

 

 

 

 

 

 

 

N/A

 

TOTAL FACILITIES

589,000

597,000

14,817,000

14,228,000

2415.6%

14,220,000

2381.9%

 

 

 

OTHER DEPARTMENTS

AMENDED COMPLIANCE

SUMMARY

 

CATEGORY                     ADDITIONS                     REPLACEMENTS                     TOTAL

 

 

TOTAL OTHER DEPARTMENTS                                           2,939,000                     17,438,000                      20,377,000

OTHER DEPARTMENTS

AMENDED COMPLIANCE

BUDGET/FORECAST COMPARISON

 

 

 

 

 

CATEGORY

 

FACILITIES                     ADDITIONS

REPLACEMENTS

 

 

TOTAL

 

 

INFORMATION SERVICES                                          ADDITIONS REPLACEMENTS

 

TOTAL

 

 

 

RISK MANAGEMENT &

ENVIRONMENTAL SERVICES                                          ADDITIONS REPLACEMENTS

 

TOTAL

 

TOTAL OTHER DEPARTMENTS

                                                                                                                              

 

 

 

 

AMOUNT

 

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

1

 

5

 

 

1

 

 

1                     72-01-2-06

 

1

 

TOTAL FACILITIES

  14,817,000

OTHER  DEPARTMENTS

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

P                     AMOUNT

INFORMATION SERVICES

 

2

 

2

 

2

 

5

 

1

 

1

 

5

 

1

 

 

TOTAL INFORMATION SERVICES

  5,466,000

 

RISK MANAGEMENT & ENVIRONMENTAL SERVICES

 

5

 

 

TOTAL CHEMICAL SERVICES

  94,000

 

 

TOTAL OTHER DEPARTMENTS  

20,377,000

 

*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS

 

 

OTHER DEPARTMENTS

LISTING BY PRIORITY

FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET

 

AMOUNT                     BUDGET YR                     YEAR 1                     YEAR 2                     YEAR 3

                      PRIORITY 1                     

 

1

72-01-1-01

MISCELLANEOUS CAPITAL ADDITIONS

107,000

21,000

86,000.00

-

-

 

1

72-01-1-02

MISCELLANEOUS CAPITAL ADDITIONS - GAS PROCESSING

6,000

6,000

-

-

-

 

1

72-01-2-01

MISCELLANEOUS CAPITAL REPLACEMENTS/STRUCTURAL REPAIRS

289,000

58,000

231,000.00

-

-

 

1

72-01-2-02

MISCELLANEOUS CAPITAL REPLACEMENTS - GAS PROCESSING

20,000

4,000

16,000.00

-

-

 

1

72-01-2-03

MISC CAPITAL REPL - STRUCTURAL REPAIRS - GAS PROCESSING

13,000

3,000

10,000.00

-

-

 

 

1

 

1                     118,000                     -                     -                     -

 

                      PRIORITY 2                     

 

2

47-01-1-01

MISC ADDITIONS - SERVER, NETWORK AND HARDWARE

1,062,000

400,000

662,000

-

-

2

47-01-1-02

MISC ADDITIONS - SOFTWARE

100,000

25,000

75,000

-

-

2

47-01-1-03

ADDITIONS - SAN STORAGE

 

-

-

-

-

 

PRIORITY 5

 

5                     -                     -                     -                     -

 

5

 

5

 

5                     13,532,000                     -                     -                     -

 

 

 

2023 REAUTHORIZATION

 

 

 

 

 

1

72-01-2-08

REPLACE PORTER FUELING STATION*

-

-

-

-

-

 

 

2025 REAUTHORIZATION

 

 

 

 

 

1

72-01-2-06

800 BUILDING 1ST FLOOR RENOVATIONS PHASE 2*

-

-

-

-

-

1

72-01-2-05

800 BUILDING STAIR TOWER RENOVATION*

-

-

-

-

-

 

TOTAL OTHER DEPARTMENTS:

  20,377,000

17,033,000  3,344,000  -  -

*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS

 

 

 

 

 

PHILADELPHIA GAS WORKS

AMENDED COMPLIANCE

OTHER DEPARTMENTS ESTIMATE OF ENCUMBERANCE AND EXPENDITURE

 

 

 

 

TOTAL ENCUMBERED

20,377,000

 

1,935,000                     -                     1,409,000                     -                     3,344,000

 

-                     -                     -                     -                     -

 

-                     -                     -                     -                     -

 

-                     -                     -                     -                     -

 

TOTAL

  2,939,000

 

  2,939,000

 

  17,438,000

 

  17,438,000

 

  20,377,000

 

  20,377,000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIVE                     YEAR  FORECAST

PHILADELPHIA GAS WORKS

FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032

 

 

 

 

 

 

GAS P

 

 

 

 

 

 

 

 

 

 

DISTRIBUTION

 

 

 

 

 

 

ADDITIONS

15,480,000

15,821,000

16,169,000

16,525,000

16,887,000

17,259,000

REPLACEMENTS

145,202,000

146,739,000

148,903,000

119,505,000

121,170,000

122,871,000

 

GROSS TOTAL DISTRIBUTION

160,682,000

162,560,000

165,072,000

136,030,000

138,057,000

140,130,000

LESS: SALVAGE

 

 

 

 

 

 

LESS: CONTRIBUTIONS*

 

 

 

 

 

 

LESS: REIMBURSEMENT**

(8,478,000)

(8,665,000)

(8,856,000)

(9,051,000)

(9,251,000)

(9,454,000)

PHILADELPHIA GAS WORKS

FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032

 

 

 

AMENDED COMPLIANCE

 

 

 

 

 

 

2027

 

 

 

 

 

 

CAPITAL

  FORECAST

 

 

DEPARTMENT

BUDGET

2028

2029

2030

2031

2032

FIELD SERVICES

 

 

 

 

 

 

ADDITIONS

2,906,000

2,713,000

2,723,000

2,753,000

2,890,000

2,978,000

REPLACEMENTS

17,600,000

18,944,000

19,019,000

19,227,000

20,189,000

20,799,000

 

21,657,000                     21,742,000                     21,980,000                     23,079,000                     23,777,000

PHILADELPHIA GAS WORKS

FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

 

 

 

 

DEPARTMENT

GAS PROCESSING

ADDITIONS

REPLACEMENTS

 

TOTAL GAS PROCESSING

 

 

DISTRIBUTION

ADDITIONS

REPLACEMENTS

 

GROSS TOTAL DISTRIBUTION LESS: SALVAGE

LESS: CONTRIBUTIONS* LESS: REIMBURSEMENT**

 

NET TOTAL DISTRIBUTION

 

 

FIELD SERVICES

ADDITIONS REPLACEMENTS

 

GROSS TOTAL FIELD SERVICES

LESS: SALVAGE LESS: CONTRIBUTIONS*

 

NET TOTAL FIELD SERVICES

 

 

 

 

2027 - 2031

2028 - 2032

AMOUNT

PERCENT

DEPARTMENT

FORECAST

FORECAST

DIFFERENCE

DIFFERENCE

FLEET OPERATIONS

 

 

 

 

ADDITIONS

-

-

-

 

REPLACEMENTS

  52,018,000

  42,502,000

  (9,516,000)

-18.3%

GROSS TOTAL FLEET OPERATIONS

52,018,000

42,502,000

(9,516,000)

-18.3%

LESS: SALVAGE

 

 

 

 

NET TOTAL FLEET OPERATIONS

52,018,000

42,502,000

(9,516,000)

-18.3%

 OTHER

 

 

 

 

ADDITIONS

2,310,000

13,411,000

11,101,000

480.6%

REPLACEMENTS

  5,170,000

  14,000,000

  8,830,000

170.8%

TOTAL OTHER

7,480,000

27,411,000

19,931,000

266.5%

TOTAL

 

 

 

 

ADDITIONS

103,017,000

110,259,000

7,242,000

7.0%

REPLACEMENTS

   1,039,030,000

   1,092,759,000

  53,729,000

5.2%

GROSS TOTAL

1,142,047,000

1,203,018,000

60,971,000

5.3%

LESS: SALVAGE

-

-

-

 

LESS: REIMBURSEMENT**

(29,266,000)

(45,277,000)

(16,011,000)

54.7%

LESS: CONTRIBUTIONS*

  -

  -

  -

 

NET TOTAL

   1,112,781,000

1,157,741,000

44,960,000

4.0%

 

 

 

* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS

** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH

 

 

 

2028                     2029                     2030                     2031                     2032

 

 

 

 

 

 

 

 

181,992,000                     -                     -                     -

 

10,558,000                     -                     -                     -

 

2,500,000                     2,500,000                     -                     -

 

5,500,000                     5,500,000                     -                     -

 

-                     9,135,000                     9,135,000                     -

 

-                     1,577,000                     -                     -

 

-                     -                     -                     8,000,000

 

 

 

 

 

 

 

 

 

 

300,000                     -                     -                     -

 

-                     1,800,000                     -                     -

 

-                     -                     1,900,000                     -

 

-                     -                     -                     2,000,000

 

450,000                     -                     -                     -

 

-                     -                     -                     730,000

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

201,300,000                     35,375,000                     24,835,000                     10,730,000

 

 

 

2028                     2029                     2030                     2031                     2032

 

GP-3 BUILDING AND GROUNDS

 

2,000,000                     -                     -                     -

 

2,000,000                     -                     -                     -

 

 

GP-4 MISCELLANEOUS CAPITAL REQUIREMENTS

 

24,000                     25,000                     26,000                     27,000

 

321,000                     328,000                     335,000                     342,000

 

345,000                     353,000                     361,000                     369,000

 

 

2024 REAUTHORIZATION

REPLACE LNG SWITCHGEAR - RICHMOND*                     -                     -                     -                     -                     -                     -

 

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

-                     -                     -                     -

 

 

 

204,145,000                     35,728,000                     25,696,000                     13,075,000

 

 

D-20 HIGH PRESSURE MAINS

MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND                     2,922,000                     3,122,000                     3,191,000                     3,261,000                     3,333,000                     3,406,000                     3,481,000                     16,672,000 COMMERCIAL CUSTOMERS

 

752,000                     769,000                     786,000                     803,000                     821,000

 

3,943,000                     4,030,000                     4,119,000                     4,209,000                     4,302,000

 

 

 

 

3,943,000                     4,030,000                     4,119,000                     4,209,000                     4,302,000                     20,603,000

                                                                                                                                                   

 

D-21 8 INCH AND SMALLER I. P. AND L. P. MAIN

 

MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING                     2,390,000                     2,353,000                     2,405,000                     2,458,000                     2,512,000                     2,567,000 RESIDENTIAL, COMMERCIAL, AND MAJOR ACCOUNT CUSTOMERS

 

5,780,000                     5,907,000                     6,037,000                     6,170,000                     6,306,000                     30,200,000

 

D-22 12 INCH AND LARGER I. P. AND L. P. MAIN

MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL CUSTOMERS

258,000

262,000

268,000

274,000

280,000

286,000

292,000

1,400,000

 

 

 

 718,000

 734,000

 750,000

 767,000

 784,000

 3,753,000

 

 

 

6,298,000                     6,437,000                     6,579,000                     6,724,000                     6,872,000                     32,910,000

 

GROSS TOTAL D-22

3,911,000

7,127,000

7,284,000

7,445,000

7,609,000

7,777,000

7,948,000

38,063,000

                                                                                                                                                   

 

 

(5,668,000)                     (5,793,000)                     (5,921,000)                     (6,052,000)                     (6,185,000)                     (29,619,000)

 

1,616,000                     1,652,000                     1,688,000                     1,725,000                     1,763,000                     8,444,000

                                                                                                                                                   

 

D-23 CUSTOMER METERING & REGULATOR INSTALLATION, AND PRESSURE REGULATION & CORROSION CONTROL FACILITIES

NSTALL OF METERS/REGULATORS FOR NEW CUSTOMERS                     307,000                     362,000                     370,000                     378,000                     386,000                     394,000                     403,000                     1,931,000

 

486,000                     497,000                     508,000                     519,000                     530,000                     2,540,000

 

 

1,165,000                     1,191,000                     1,217,000                     1,244,000                     1,271,000                     6,088,000

 

 

GROSS TOTAL D-23                     1,758,000                     1,978,000                     2,021,000                     2,066,000                     2,111,000                     2,157,000                     2,204,000                     10,559,000

                                                                                                         

 

2,021,000                     2,066,000                     2,111,000                     2,157,000                     2,204,000                     10,559,000

                                                                                                                              

 

D-24 SERVICES

 

NSTALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH, NTERMEDIATE AND LOW PRESSURE

 

6,808,000

 

6,488,000

 

6,631,000

 

6,777,000

 

6,926,000

 

7,078,000

 

7,234,000

 

34,646,000

 NSTALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH,

 

 2,571,000

 

 2,609,000

 

 2,666,000

 

 2,725,000

 

 2,785,000

 

 2,846,000

 

 2,909,000

 

 13,931,000

NTERMEDIATE AND LOW PRESSURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT

 

22,821,000

 

24,596,000

 

25,137,000

 

25,690,000

 

26,255,000

 

26,833,000

 

27,423,000

 

131,338,000

REASONS, AS A RESULT OF PGW'S MAIN REPL PROG, CUSTOMER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPLAINTS OR CITY AND STATE WORK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 RENEWAL OF 2" AND LARGER SERVICES

 

 1,150,000

 

 1,415,000

 

 1,446,000

 

 1,478,000

 

 1,511,000

 

 1,544,000

 

 1,578,000

 

 7,557,000

 

 GROSS TOTAL D-24

 33,350,000

 

 35,108,000

 

 35,880,000

 

 36,670,000

 

 37,477,000

 

 38,301,000

 

 39,144,000

 

 187,472,000

 

 

 

 

 

 

 35,880,000

 

 36,670,000

 

 37,477,000

 

 38,301,000

 

 39,144,000

 

 187,472,000

 D-25 - CONDITIONED FUNDING CONDITIONED FUNDING RESERVED

 

   4,259,000

 

   4,680,000

 

   4,735,000

 

   4,808,000

 

   3,962,000

 

   4,021,000

 

   4,081,000

 

   21,607,000

 

TOTAL D-25

4,259,000

4,680,000

4,735,000

4,808,000

3,962,000

4,021,000

4,081,000

21,607,000

 

DISTRIBUTION DEPARTMENT

FORECAST - FISCAL  YEARS  2028  THROUGH 2032

 

 

2026 AMENDED COMPLIANCE BUDGET

 2027 AMENDED COMPLIANCE BUDGET

 

 

 

 

 

TOTAL

 

 

 

 

2028

2029

2030

2031

2032

FORECAST

 

 

D-29 OTHER DISTRIBUTION FACILITIES

 

 

 

 

 

 

 

 

2

52-29-1-01

ADDITIONAL TOOLS AND WORK EQUIPMENT

275,000

284,000

290,000

296,000

303,000

310,000

317,000

1,516,000

 2

 52-29-2-01

 REPLACEMENT OF UNUSABLE WORK EQUIPMENT

 1,111,000

 1,116,000

 1,141,000

 1,166,000

 1,192,000

 1,218,000

 1,245,000

 5,962,000

 

 52-XX-X-XX

 NON-RECURRING ITEMS

 

 

 

 

 

 

 

 

 

 

TOTAL D-29

1,386,000

1,400,000

1,431,000

1,462,000

1,495,000

1,528,000

1,562,000

7,478,000

 

 

 

52-98-2-98

 

 

 

 

 

 

TOTAL

FORECAST

 

C-30 METERS ADDITIONS AND INSTALLATIONS

 

 

2,577,000                     2,587,000                     2,615,000                     2,746,000                     2,829,000                     13,354,000

 

18,071,000                     18,141,000                     18,337,000                     19,258,000                     19,841,000                     93,648,000

 

20,648,000                     20,728,000                     20,952,000                     22,004,000                     22,670,000                     107,002,000

                                                                                                                              

 

 

C-32 SERVICES REGULATORS

 

ADDITIONS AND INSTALLATIONS                     98,000                     46,000                     53,000                     53,000                     54,000                     56,000                     58,000                     274,000

 

153,000                     153,000                     155,000                     163,000                     168,000                     792,000

 

206,000                     206,000                     209,000                     219,000                     226,000                     1,066,000

                                                                                                                              

 

 

C-33 TELEMETERING

 

ADDITIONS AND INSTALLATIONS                     126,000                     80,000                     83,000                     83,000                     84,000                     88,000                     91,000                     429,000

 

563,000                     565,000                     571,000                     600,000                     618,000                     2,917,000

 

646,000                     648,000                     655,000                     688,000                     709,000                     3,346,000

                                                                                                                              

                     

C-34  METER SHOP EQUIPMENT

 

 

 

 

 

 

 

 

C-35  SERVICE SECTION EQUIPMENT

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

                                                                                                                              

 

 

C-36 AUTOMATIC METER READING

 

ADDITIONS                     -                     -                     -                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

                                                                                                                              

 

 

1

50-99-2-99

C-99 COST OF REMOVAL

 

21,657,000                     21,742,000                     21,980,000                     23,079,000                     23,777,000                      112,235,000

50-98

50-94

21,657,000                     21,742,000                     21,980,000                     23,079,000                     23,777,000                     112,235,000

                                                                                                                              

 

ACQUIRE ASSETS

8,699,000

20,506,000 21,657,000 21,742,000 21,980,000 23,079,000 23,777,000 112,235,000

LEASE

 

 

 

FLEET OPERATIONS DEPARTMENT

FORECAST - FISCAL YEARS 2028 THROUGH 2032

 

 

 

2028                     2029                     2030                     2031                     2032

 

TOTAL FORECAST

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

1,925,000                     -                     1,525,000                     2,224,000                     528,000                     6,202,000

 

13,585,000                     7,956,000                     3,826,000                     3,545,000                     7,388,000                     36,300,000

 

-                     -                     -                     -                     -                     -

 

 

15,510,000                     7,956,000                     5,351,000                     5,769,000                     7,916,000                     42,502,000

 ACQUIRE ASSETS                                           10,371,000                                                                                                                                                   

 13,146,000 15,510,000 7,956,000 5,351,000 5,769,000 7,916,000 42,502,000

LEASE

 

                                                                                                                                                                                                                                       

 

 

 

 

OTHER  DEPARTMENTS

FORECAST - FISCAL  YEARS  2028  THROUGH 2032

 

 

 

 2026 AMENDED COMPLIANCE BUDGET

 2027 AMENDED COMPLIANCE BUDGET

 2028

 2029

 2030

 2031

 2032

 TOTAL FORECAST

 

 

FACILITIES

 

 

 

 

 

 

 

 

1

72-01-1-01

MISCELLANEOUS CAPITAL ADDITIONS

84,000

107,000

108,000

109,000

110,000

111,000

112,000

550,000

 

6,000                     6,000                     6,000                     6,000                     30,000

 

301,000                     307,000                     313,000                     319,000                     1,535,000

 

22,000                     23,000                     24,000                     25,000                     115,000

 

15,000                     16,000                     17,000                     18,000                     80,000

 

50,000                     50,000                     50,000                     50,000                     250,000

 

50,000                     50,000                     50,000                     50,000                     50,000                     250,000

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

100,000                     -                     -                     -                     -                     100,000

 

100,000                     -                     -                     -                     -                     100,000

 

367,000                     -                     -                     -                     -                     367,000

 

2023 REAUTHORIZATION

 

-                     -                     -                     -                     -                     -

 

-                     -                     -

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

1,111,000                     553,000                     562,000                     571,000                     580,000                     3,377,000

                                                               

 

INFORMATION SERVICES

MISC ADDITIONS - SERVER, NETWORK AND HARDWARE                     2,043,000                     1,062,000                     1,085,000                     1,109,000                     1,133,000                     1,158,000                     1,183,000                     5,668,000

 

102,000                     104,000                     106,000                     108,000                     110,000                     530,000

 

362,000                     370,000                     378,000                     386,000                     394,000                     1,890,000

 

210,000                     215,000                     220,000                     225,000                     230,000                     1,100,000

 

301,000                     308,000                     315,000                     322,000                     329,000                     1,575,000

 

511,000                     522,000                     533,000                     545,000                     557,000                     2,668,000

 

1,531,000                     1,565,000                     1,599,000                     1,634,000                     1,671,000                     8,000,000

 

121,000                     124,000                     127,000                     130,000                     133,000                     635,000

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

-                     -                     -                     -                     -                     -

 

4,411,000                     4,508,000                     4,607,000                     22,066,000

                                                               

 

CORPORATE PLANNING

HYDROGEN SERVICES AND MEASUREMENTS - RICHMOND                     -                     -                     984,000                     -                     -                     -                     -                     984,000

 

984,000                     -                     -                     -                     -                     984,000

 

1,968,000                     -                     -                     -                     -                     1,968,000

                                                               

 

RISK MANAGEMENT & ENVIRONMENTAL SERVICES

REPLACEMENT OF GAS CHROMATOGRAPHS                     -                     94,000

 

-                     -                     -                     -

 

-                     -                     -                     -

                                                               

 

 

7,302,000                     4,870,000                     4,973,000                     5,079,000                     5,187,000                     27,411,000

                                                               

PHILADELPHIA GAS WORKS CAPITAL FINANCING PLAN

 

 

As a result of the FY 2011 Operating Budget proceedings, a motion was approved that directed PGW to begin with its FY 2012 Capital Budget filing to include with each proposed Capital Budget and Capital Budget Amendment a proposed Capital Funding plan pursuant to Section IV.2.b of the Management Agreement.

 

In this section of the Management Agreement, funds required to be supplied must be identified between:

 

i.                     Funds generated within the business through charges to customers or otherwise; and

ii.                     Funds to be obtained through capital loans.

 

 

Capital Spending in FY 2027 (AMENDED COMPLIANCE)

 

•                     Spending from FY 2027 Program                     $ 154,564,000

•                     Spending Carryover from FY 2024, 2025, 2026                     $ 141,606,000

•                     Total FY 2027 Spending                     $ 296,170,000

•                     Projected Reimbursement                     $                     8,478,000

•                     Salvage                     $                     269,000

•                     Construction Contributions                     $                     1,846,000

•                     Net FY 2027 Capital Spending                     $ 285,577,000

 

Capital Funding Sources:

 

•                     Debt                     $ 142,788,500

•                     DSIC                     $                     42,551,000

•                     Federal Grant Revenue (PHMSA)                     $                     31,488,000

•                     Internally Generated Funds                     $                     68,749,500

•                     FY 2027 Capital Funding                     $ 285,577,000

 

The funding plan is based upon current financial projections and is subject to changes based upon PGW’s financial conditions at the time funds are required to support the FY 2027 Capital Program.

End