Legislation Details
|
File #:
|
260965
Version:
0
|
Name:
|
|
|
Type:
|
Bill
|
Status:
|
IN COMMITTEE
|
|
Title:
|
Approving the amendment of the Fiscal Year 2027 Capital Budget providing for expenditures for the capital purposes of the Philadelphia Gas Works (including the supplying of funds in connection therewith) subject to certain constraints and conditions and acknowledging the receipt of the Revised Forecast of Capital Budgets for Fiscal Years 2028 through 2032, as amended.
|
|
Indexes:
|
CAPITAL BUDGET, PHILADELPHIA GAS WORKS
|
Title
Approving the amendment of the Fiscal Year 2027 Capital Budget providing for expenditures for the capital purposes of the Philadelphia Gas Works (including the supplying of funds in connection therewith) subject to certain constraints and conditions and acknowledging the receipt of the Revised Forecast of Capital Budgets for Fiscal Years 2028 through 2032, as amended.
Body
WHEREAS, Section IV.2.b of the Agreement Between the City of Philadelphia and the Philadelphia Facilities Management Corporation for the Management and Operation of the Philadelphia Gas Works (“Management Agreement”) requires the Philadelphia Facilities Management Corporation (“PFMC”) to prepare annually for the Philadelphia Gas Works (“PGW”) a proposed capital budget for the ensuing year and a forecast for the six (6) years comprising the ensuing budget year and the five (5) years next following; and
WHEREAS, Section IV.2.b of the Management Agreement also requires that the proposed capital budget and forecast be submitted to the Director of Finance and the Philadelphia Gas Commission (“Gas Commission”) for their review and for submission of said budget and forecast, together with their recommendations thereon, to the Council of the City of Philadelphia (“City Council”) for its approval; and
WHEREAS, Section IV.2.b of the Management Agreement further requires that the proposed capital budget and forecast include a showing of the amounts needed and how the funds required are to be supplied as between funds generated within the business through charges to customers or otherwise and funds to be obtained through capital loans (“Financing Plan”); and
WHEREAS, Section IV.2.c of the Management Agreement requires that all PGW expenditures be made pursuant to approved budgets; and
WHEREAS, PGW filed with the Gas Commission on January 2, 2026 a proposed Fiscal Year (“FY”) 2027 Capital Budget of Three Hundred Ninety Million Five Hundred Sixty-One Thousand Dollars ($390,561,000) (“FY 2027 Capital Budget” or “Budget”) and a Five Year Forecast of Capital Budgets (FY 2028 - FY 2032) (“Forecast”); and
WHEREAS, the Gas Commission’s review of the Budget in its FY 2027 Budgets/Oversight Proceeding culminated in deliberations taken at a public meeting held on May 12, 2026, at which the Gas Commission endorsed a proposed FY 2027 Capital Budget in an amount not to exceed Two Hundred Eight Million Ten Thousand Dollars ($208,010,000) including a revised Financing Plan and revised Forecast with related constraints and conditions related thereto; and
WHEREAS, on June 23, 2026, the Mayor approved Bill No. 260511, wherein City Council approved the foregoing FY2027 Compliance Capital Budget; and
WHEREAS, on July 17, 2026, PGW filed a request to amend its FY 2027 Capital Budget by a total of Thirteen Million Five Hundred Fifty-Two Thousand Dollars ($13,532,000), followed by a July 30, 2026 request to extend the lifespans of eight projects by one year, two of which require City Council approval; and
WHEREAS, the Gas Commission’s review of the consolidated FY 2027 Capital Budget Amendment Requests culminated in deliberations taken at its public meeting held on October 13, 2026, and whereupon the Gas Commission endorsed reauthorizations and amendments to the FY 2027 Capital Budget adding a total of Thirteen Million Five Hundred Thirty-Two Thousand Dollars ($13,532,000), thereby increasing the total Budget to an amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000) with related constraints and conditions; and
WHEREAS, on October 22, 2026, PGW filed with the Gas Commission an Amended FY 2027 Compliance Capital Budget in the amount of Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000), a revised Financing Plan and a revised Forecast; and
WHEREAS, City Council seeks to provide for evolving capital needs and related expenditures of PGW by incorporating the Gas Commission-endorsed amendments to the FY 2027 Capital Budget reflected in Exhibit 1 hereto; now, therefore,
THE COUNCIL OF THE CITY OF PHILADELPHIA ORDAINS:
SECTION 1. Approval and Acknowledgment
Pursuant to the provisions of Section IV.2.b and IV.2.c of the Management Agreement, the Council:
A. does hereby approve the Amended FY 2027 Capital Budget for PGW in a total amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty-Two Thousand Dollars ($221,542,000) as reflected in the Amended Compliance Capital Budget and associated revised Financing Plan, subject to the provisions of Sections 4-7 of this Ordinance; and
B. does hereby acknowledge receipt of PGW’s Revised Forecast of Capital Budgets for FY 2028 - FY 2032.
SECTION 2. Spending Authorization
The amounts shown in the approved Amended Compliance Budget are hereby authorized for the purposes shown and shall be available for expenditure as of FY 2027, defined as September 1, 2026 through August 31, 2027, in an aggregate amount not to exceed Two Hundred Twenty-One Million Five Hundred Forty- Two Thousand Dollars ($221,542,000) as reflected in the Amended Compliance Budget and subject to the provisions of Sections 4-7 of this Ordinance. The Amended Compliance Budget (including the revised Financing Plan) is attached as Exhibit 1.
SECTION 3. Reauthorized Line Items
A. The following line item from the FY 2023 Capital Budget, as reauthorized by amendment to the FY 2025 and FY 2026 Capital Budgets is hereby reauthorized, with the amended amount consisting of unspent funds carried over from FY 2023, FY 2025, and FY 2026 authorizations into the FY 2027 Capital Budget:
1. Replace Porter Street Fueling Station (#73-01-2-08) ($1,797,000).
B. The following line item from the FY 2024 Capital Budget is hereby reauthorized, with the amended amount consisting of unspent funds carried over from FY 2024 and FY 2026 authorizations:
1. Replace LNG Switchgear (#53-02-2-03) ($9,025,000).
SECTION 4. Constraints and Conditions - Capital Program Protocols
During the lifespan of the line items in the approved Amended Compliance Budget, as a condition of approval, PGW shall adhere to the “Capital Program Protocols” (“Protocols”) adopted by the Gas Commission on May 12, 2026. Said Protocols are incorporated herein by reference.
SECTION 5. Constraints and Conditions - Line Item Transfer Exclusions
Except as necessitated by Emergency Circumstances as set forth in the Protocols at Part 1 - Subpart I.3, no line item referenced herein shall be available as a source of spending authority in transfer transactions.
SECTION 6. Constraints and Conditions - Line Item Lifespan Spending authority for these line items shall expire as of August 31, 2027.
SECTION 7. Constraints and Conditions - Line Item Spending Authorization
A. The total combined spending for the following line item from the FY 2023 Capital Budget, as amended by the FY 2025 and FY 2026 Capital Budgets shall not exceed the spending authorization for the project as approved by the aforementioned amendments:
1. Replace Porter Street Fueling Station (#73-01-2-08) ($1,797,000).
B. The total combined spending for the following line item from the FY 2024 Capital Budget shall not exceed the spending authorization for the project as approved in the FY 2024 Capital Budget, as amended by the FY 2026 Capital Budget:
1. Replace LNG Switchgear (#53-02-2-03) ($9,025,000).
SECTION 10. Exhibit
Exhibit 1 referenced in this Ordinance and incorporated herein shall be kept on file by the Chief Clerk of City Council and shall be available to the public for inspection, reading, or copying at reasonable times.
Exhibit 1
PHILADELPHIA GAS WORKS
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET
AND
FORECAST FISCAL 2028 - 2032 WITH
FISCAL 2027 FINANCING PLAN
OCTOBER 13, 2026

|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
CAPITAL BUDGET |
|
FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032 |
|
|
2027 |
2028- 2032 |
|
|
|
CAPITAL BUDGET |
FORECAST |
TOTAL 6 YEARS |
|
GAS PROCESSING |
|
|
|
|
ADDITIONS |
1,675,000 |
130,000 |
1,805,000 |
|
REPLACEMENTS |
5,156,000 |
278,891,000 |
284,047,000 |
|
TOTAL |
6,831,000 |
279,021,000 |
285,852,000 |
|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
CAPITAL BUDGET |
|
FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032 |
|
|
2027 |
2028- 2032 |
|
|
|
CAPITAL BUDGET |
FORECAST |
TOTAL 6 YEARS |
|
OTHER DEPARTMENTS |
|
|
|
|
ADDITIONS |
2,939,000 |
13,411,000 |
16,350,000 |
|
REPLACEMENTS |
17,438,000 |
14,000,000 |
31,438,000 |
|
TOTAL |
20,377,000 |
27,411,000 |
47,788,000 |
|
* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD |
|
GROWTH |
2027 2026
BUDGET vs COMPL BUDGET
2027 BUD vs 2027 FORECAST
2026 COMPL 2027
BUDGET FORECAST
AMOUNT PERCENT AMOUNT PERCENT DIFFERENCE DIFFERENCE DIFFERENCE DIFFERENCE
226,000
14,350,000
35,000
177,408,000
1,449,000
(9,194,000)
641.2%
-64.1%
1,640,000
(172,252,000)
4685.7%
-97.1%
TOTAL GAS PROCESSING
14,576,000
177,443,000
6,831,000
(7,745,000)
-53.1%
(170,612,000)
-96.2%
DISTRIBUTION
|
ADDITIONS |
15,531,000 |
15,874,000 |
15,480,000 |
(51,000) |
-0.3% |
(394,000) |
-2.5% |
|
REPLACEMENTS |
130,702,000 |
134,167,000 |
145,202,000 |
14,500,000 |
11.1% |
11,035,000 |
8.2% |
|
GROSS TOTAL DISTRIBUTION LESS: SALVAGE LESS: CONTRIBUTIONS* LESS: REIMBURSEMENT** |
146,233,000 (5,497,000) |
150,041,000 (5,613,000) |
160,682,000 (8,478,000) |
14,449,000 (2,981,000) |
9.9% N/A N/A 54.2% |
10,641,000 (2,865,000) |
7.1% N/A N/A 51.0% |
|
NET TOTAL DISTRIBUTION FIELD SERVICES |
140,736,000 |
144,428,000 |
152,204,000 |
11,468,000 |
8.1% |
7,776,000 |
5.4% |
|
ADDITIONS |
2,598,000 |
2,641,000 |
2,906,000 |
308,000 |
11.9% |
265,000 |
10.0% |
|
REPLACEMENTS |
6,101,000 |
14,046,000 |
17,600,000 |
11,499,000 |
188.5% |
3,554,000 |
25.3% |
|
GROSS TOTAL FIELD SERVICES LESS: SALVAGE LESS: CONTRIBUTIONS* |
8,699,000 |
16,687,000 |
20,506,000 |
11,807,000 |
135.7% N/A N/A |
3,819,000 |
22.9% N/A N/A |
|
NET TOTAL FIELD SERVICES |
8,699,000 |
16,687,000 |
20,506,000 |
11,807,000 |
135.7% |
3,819,000 |
22.9% |
|
|
|
|
|
2027 |
2026 |
|
|
|
|
|
|
|
BUDGET vs |
COMPL BUDGET |
2027 BUD vs 2027 FORECAST |
|
|
2026 COMPL |
2027 |
2027 AMENDED COMPL |
AMOUNT |
PERCENT |
AMOUNT |
PERCENT |
|
DEPARTMENT |
BUDGET |
FORECAST |
BUDGET |
DIFFERENCE |
DIFFERENCE |
DIFFERENCE |
DIFFERENCE |
|
FLEET OPERATIONS |
|
|
|
|
|
|
|
|
ADDITIONS |
137,000 |
- |
326,000 |
189,000.00 |
138.0% |
326,000.00 |
N/A |
|
REPLACEMENTS |
10,234,000 |
12,951,000 |
12,820,000 |
2,586,000 |
25.3% |
(131,000) |
-1.0% |
|
GROSS TOTAL FLEET |
|
|
|
|
|
|
|
|
OPERATIONS |
10,371,000 |
12,951,000 |
13,146,000 |
2,775,000 |
26.8% |
195,000 |
1.5% |
|
LESS: SALVAGE |
|
|
|
|
N/A |
|
N/A |
|
NET TOTAL TRANSPORTATION |
10,371,000 |
12,951,000 |
13,146,000 |
2,775,000 |
26.8% |
195,000 |
1.5% |
|
OTHER |
|
|
|
|
|
|
|
|
ADDITIONS |
3,831,000 |
440,000 |
2,939,000 |
(892,000) |
-23.3% |
2,499,000 |
568.0% |
|
REPLACEMENTS |
31,502,000 |
1,012,000 |
17,438,000 |
(14,064,000) |
-44.6% |
16,426,000 |
1623.1% |
|
TOTAL OTHER |
35,333,000 |
1,452,000 |
20,377,000 |
(14,956,000) |
-42.3% |
18,925,000 |
1303.4% |
|
TOTAL |
|
|
|
|
|
|
|
|
ADDITIONS |
22,323,000 |
18,990,000 |
23,326,000 |
1,003,000 |
4.5% |
4,336,000 |
22.8% |
|
REPLACEMENTS |
192,889,000 |
339,584,000 |
198,216,000 |
5,327,000 |
2.8% |
(141,368,000) |
-41.6% |
|
GROSS TOTAL |
215,212,000 |
358,574,000 |
221,542,000 |
6,330,000 |
2.9% |
(137,032,000) |
-38.2% |
|
LESS: SALVAGE |
|
|
|
|
N/A |
|
N/A |
|
LESS: REIMBURSEMENT** |
(5,497,000) |
(5,613,000) |
(8,478,000) |
(2,981,000) |
54.2% |
(2,865,000) |
51.0% |
|
LESS: CONTRIBUTIONS* |
|
|
|
|
N/A |
|
N/A |
|
NET TOTAL |
209,715,000 |
352,961,000 |
213,064,000 |
3,349,000 |
1.6% |
(139,897,000) |
-39.6% |
|
* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH |
|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
SUMMARY ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
EXPENDED 4,564,000
6,970,000 48,632,000
1,112,000 - 10,848,000 - 11,960,000
- - 1,706,000 - 1,706,000
- - - - -
|
TOTAL |
23,326,000 |
|
23,326,000 |
|
198,216,000 |
|
193,536,000 |
|
221,542,000 |
|
216,862,000 |
|
GAS PROCESSING DEPARTMENT |
|
AMENDED COMPLIANCE |
|
SUMMARY |
53-0
1,652,000 3,065,000 - 4,717,000
- - - -
23,000 314,000 - 337,000
TOTAL GAS PROCESSING 1,675,000 5,156,000 - 6,831,000
|
GAS PROCESSING DEPARTMENT |
|
AMENDED COMPLIANCE |
|
BUDGET/FORECAST COMPARISON |
2027 2026
BUDGET vs COMPL BUDGET
2027 BUD vs 2027 FORECAST
CATEGORY
53-01 NATURAL GAS ADDITIONS MEASUREMENT
AND REPLACEMENTS CONTROL
FACILITIES
TOTAL
53-02
SUPPLEMENTAL
GAS ADDITIONS
FACILITIES REPLACEMENTS
TOTAL
(7,059,000)
-59.9% (171,516,000)
-97.3%
53-03 BUILDING AND ADDITIONS -
GROUNDS REPLACEMENTS -
TOTAL -
N/A N/A
N/A
- N/A
0 N/A
0 N/A
53-04 MISC CAPITAL ADDITIONS REQUIREMENTS REPLACEMENTS
TOTAL
(11,000)
(24,000)
(35,000)
-32.4%
-7.1%
-9.4%
(12,000)
(32,000)
(44,000)
-34.3%
-9.2%
-11.5%
REAUTHORIZATION
ADDITIONS -
REPLACEMENTS -
TOTAL -
N/A N/A
N/A
- N/A
- N/A
- N/A
TOTAL GAS PROCESSING
(7,745,000)
-53.1% (170,612,000)
-96.2%

|
GAS PROCESSING DEPARTMENT |
|
LISTING BY PRIORITY |
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
PRIORITY 1
AMOUNT BUDGET YR YEAR 1 YEAR 2 YEAR 3
1 GP-1 53-01-2-03 360,000 360,000 1,057,000 -
270,000 270,000 1,112,000 -
208,000 208,000 782,000 -
|
1 |
GP-2 |
53-02-2-02 |
GATE 5 MODIFICATIONS - RICHMOND |
1,867,000 |
360,000 |
360,000 |
1,147,000 |
- |
|
1 |
GP-4 |
53-04-1-01 |
MISCELLANEOUS CAPITAL ADDITIONS |
23,000 |
5,000 |
18,000 |
- |
- |
|
1 |
GP-4 |
53-04-2-01 |
MISCELLANEOUS CAPITAL REPLACEMENTS |
314,000 |
60,000 |
254,000 |
- |
- |
PRIORITY 2
- - - -
2024 REAUTHORIZATION
REPLACE LNG SWITCHGEAR - RICHMOND* - - - - -
2025 REAUTHORIZATION
REPLACE NATURAL GAS DRIVEN POSITIONERS AND ACTUATORS* - - - - -
REPLACE MCC 1,2,3 - RICHMOND* - - - - -
UPGRADE H-1 HEATER CONTROLS - RICHMOND* - - - - -
BOILOFF GAS COMPRESSORS REPLACEMENTS - PASSYUNK* - - - - -
|
TOTAL GAS PROCESSING DEPARTMENT: |
6,831,000 |
1,263,000 |
1,470,000 |
4,098,000 - |
|
*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS |
|
|
|
|
|
GAS PROCESSING DEPARTMENT |
|
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
|
P |
AMOUNT |
|
GP-1 |
NATURAL GAS MEASUREMENT AND CONTROL FACILITIES |
|
1 |
53-01-2-03 |
NEW HEATER, GENERATOR AND STATION MODIFICATIONS |
1,777,000 |
|
GP-2 |
SUPPLEMENTAL GAS FACILITIES |
|
1 |
53-02-1-01 |
INSTALL NEW ODORANT SYSTEM AT PENROSE |
1,652,000 |
|
1 |
53-02-2-01 |
UPGRADE PA SYSTEM - RICHMOND |
1,198,000 |
|
1 |
53-02-2-02 |
GATE 5 MODIFICATIONS - RICHMOND |
1,867,000 |
|
2 |
53-02-2-22 |
REPLACE LIQUEFIER - RICHMOND |
- |
|
GP-4 |
MISCELLANEOUS CAPITAL REQUIREMENTS |
|
1 |
53-04-1-01 |
MISCELLANEOUS CAPITAL ADDITIONS |
23,000 |
|
1 |
53-04-2-01 |
MISCELLANEOUS CAPITAL REPLACEMENTS |
314,000 |
337,000

2024 REAUTHORIZATION
REPLACE LNG SWITCHGEAR - RICHMOND* -
2025 REAUTHORIZATION
REPLACE NATURAL GAS DRIVEN POSITIONERS AND ACTUATORS* -
|
2 |
53-02-2-07 |
REPLACE MCC 1,2,3 - RICHMOND* |
- |
|
1 |
53-02-2-08 |
UPGRADE H-1 HEATER CONTROLS - RICHMOND* |
- |
|
2 |
53-03-1-01 |
BOILOFF GAS COMPRESSORS REPLACEMENTS - PASSYUNK* |
- |
TOTAL REAUTHORIZATION

|
|
 |
|
TOTAL GAS PROCESSING DEPARTMENT |
6,831,000 |
*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS
|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
GAS PROCESSING DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
TOTAL ENCUMBERED
6,831,000
- - - -
- - - - -
|
TOTAL |
1,675,000 |
|
1,675,000 |
|
5,156,000 |
|
5,156,000 |
|
6,831,000 |
|
6,831,000 |
DISTRIBUTION DEPARTMENT AMENDED COMPLIANCE SUMMARY
CATEGORY ADDITIONS
REPLACEMENTS GROSS TOTAL
REIMBURSEM
ENT**
NET TOTAL
52-20 GAS MAINS - HIGH PRESSURE (WITH ASSOCIATED VALVES AND REGULATORS)
52-21 GAS MAINS - LOW AND INTERMEDIATE PRESSURE - 8 INCH AND SMALLER
52-22 GAS MAINS - LOW AND INTERMEDIATE PRESSURE - 12 INCH AND LARGER
52-23 CUST MTR & REG INSTALL, PRESSURE REGULATION & CORROSION CONTROL FACILITIES
52-24 SERVICES
52-25 CONDITIONED RESERVED
52-29 OTHER DISTRIBUTION FACILITIES
TOTAL DISTRIBUTION
* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH
|
DISTRIBUTION DEPARTMENT |
|
AMENDED COMPLIANCE |
|
BUDGET/FORECAST COMPARISON |
2027 2026
BUDGET vs COMPL BUDGET
2027 BUD vs 2027 FORECAST
CATEGORY
$ % $ %
DIFF. DIFF. DIFF. DIFF.
52-20 GAS MAINS - HIGH ADDITIONS PRESSURE (WITH REPLACEMENTS ASSOCIATED VALVES
AND REGULATORS) TOTAL
52-21 GAS MAINS - LOW ADDITIONS AND INTERMEDIATE REPLACEMENTS PRESSURE - 8 INCH
AND SMALLER TOTAL
52-22 GAS MAINS - LOW ADDITIONS AND INTERMEDIATE REPLACEMENTS PRESSURE - 12 INCH
AND LARGER TOTAL
52-23 CUST MTR & REG INST, ADDITIONS PRESSURE REGULA- REPLACEMENTS TION AND CORROSION
CONTROL FACILITIES TOTAL
52-24 SERVICES ADDITIONS REPLACEMENTS
TOTAL
|
52-25 |
CONDITIONED FUNDING RESERVED |
52-29 OTHER DISTRIBUTION ADDITIONS FACILITIES REPLACEMENTS
TOTAL GROSS TOTAL DISTRIBUTION DEPARTMENT
|
52-99 |
COST OF REMOVAL AND ABANDONMENT |
|
|
LESS: |
SALVAGE |
|
|
LESS: |
CONTRIBUTIONS* |
|
|
LESS: |
REIMBURSEMENT** |
NET TOTAL DISTRIBUTION
6.8%
-12.9%
2.4%
-1.5%
9.2%
8.9%
1.6%
87.9%
82.2%
17.9%
11.4%
12.5%
-3.0%
8.5%
5.3%
9.9%
3.3%
0.5%
1.0%
9.9%
N/A N/A N/A 54.2%
8.1%
136,000
(128,000)
8,000
(90,000)
6,094,000
6,004,000
(2,000)
3,132,000
3,130,000
48,000
133,000
181,000
(489,000)
1,513,000
1,024,000
310,000
3,000.00
(19,000)
(16,000)
10,641,000
-
-
- (2,865,000)
7,776,000
4.6%
-14.8%
0.2%
-3.7%
6.2%
6.0%
-0.8%
83.9%
78.3%
15.3%
9.0%
10.1%
-5.1%
6.2%
3.0%
7.1%
1.1%
-1.7%
-1.1%
7.1%
N/A N/A N/A 51.0%
5.4%

|
* DISTRIBUTION DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH |

|
4 |
52-20-1-01 |
MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND |
3,122,000 |
15,984 |
|
|
|
COMMERCIAL CUSTOMERS |
|
|
|
3 |
52-20-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY AND STATE WORK |
736,000 |
1,444 |
52-20-2-97
D-21
|
4 |
52-21-1-01 |
MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING |
2,353,000 |
7,280 |
|
|
|
RESIDENTIAL, COMMERCIAL, AND MAJOR ACCOUNT CUSTOMERS |
|
|
|
3 |
52-21-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY, STATE /UNFORSEEN |
5,656,000 |
18,258 |
|
|
|
CONDITIONS |
|
|
|
1 |
52-21-2-02 |
PRUDENT MAIN REPLACEMENTS |
26,378,000 |
92,791 |
|
1 |
52-21-2-03 |
LONG TERM INFRASTRUCTURE PLAN - DSIC |
42,551,000 |
|
1 |
52-21-2-04 |
NG DIST INFRASTRUCTURE SAFETY AND MODERNIZATION |
29,593,000 |
GROSS TOTAL D-21 106,531,000
52-21-2-97 LESS: REIMBURSEMENT** (2,932,000)
NET TOTAL D-21 
|
103,599,000 |
|
AMOUNT |
FEET UNITS |
D-22
|
4 |
52-22-1-01 |
MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL |
262,000 |
818 |
|
|
|
CUSTOMERS |
|
|
|
3 |
52-22-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY, STATE WORK |
703,000 |
1,791 |
|
|
|
AND UNFORESEEN CONDITIONS |
|
|
|
3 |
52-22-2-02 |
MAIN FOR MAJOR ENFORCED RELOCATION CAUSED BY CITY/STATE |
6,162,000 |
GROSS TOTAL D-22 7,127,000 LESS: REIMBURSEMENT** (5,546,000)
NET TOTAL D-22 
D-23
|
4 |
52-23-1-01 |
INSTALL OF METERS/REGULATORS FOR NEW CUSTOMERS |
362,000 |
|
1 |
52-23-2-01 |
EMERGENCY SHUTDOWN VALVES OUT OF COMPLI WITH DOT 192 |
476,000 |
|
2 |
52-23-2-02 |
REPL OF WORN DAMAGED PRESSURE REGULATING/CORROSION |
1,140,000 |
|
|
|
CONTROL FACILITIES |
|
|
|
|
GROSS TOTAL D-23 |
1,978,000 |
|
|
|
LESS: REIMBURSEMENT** |
|
|
|
|
LESS: POTENTIAL CUSTOMER CONTRIBUTIONS* |
|
|
|
NET TOTAL D-23 |
1,978,000 |
|
AMOUNT |
FEET UNITS |
|
4 |
52-24-1-01 |
INSTALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH, |
6,488,000 |
1,413 |
|
|
|
INTERMEDIATE AND LOW PRESSURE |
|
|
|
4 |
52-24-1-02 |
INSTALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH, |
2,609,000 |
168 |
|
|
|
INTERMEDIATE AND LOW PRESSURE |
|
|
|
1 |
52-24-2-01 |
RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT |
24,596,000 |
7,845 |
|
|
|
REASONS, AS A RESULT OF PGW'S MAIN REPL PROG, CUSTOMER |
|
|
|
|
|
COMPLAINTS OR CITY AND STATE WORK |
|
|
|
1 |
52-24-2-02 |
RENEWAL OF 2" AND LARGER SERVICES |
1,415,000 |
116 |
|
GROSS TOTAL D-24 |
35,108,000 |
|
LESS: REIMBURSEMENT** |
|
|
NET TOTAL D-24 |
35,108,000 |
|
1 52-25-2-01 |
CONDITIONED FUNDING RESERVED |
4,680,000 |
|
D-29 |
OTHER DISTRIBUTION FACILITIES |
|
2 |
52-29-1-01 |
ADDITIONAL TOOLS AND WORK EQUIPMENT |
284,000 |
|
2 |
52-29-2-01 |
REPLACEMENT OF UNUSABLE WORK EQUIPMENT |
1,116,000 |
|
DISTRIBUTION DEPARTMENT |
|
|
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
|
|
|
P |
AMOUNT |
FEET UNITS |
|
GROSS TOTAL DISTRIBUTION DEPARTMENT |
160,682,000 |
|
52-98-2-98
|
*** DISTRIBUTION DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH |
|
DISTRIBUTION DEPARTMENT |
|
AMENDED COMPLIANCE |
|
DISTRIBUTION COMPRESSED CATEGORIES |
|
|
2026 COMPL |
2027 |
2027 AMENDED COMPL |
|
CATEGORIES |
BUDGET |
FORECAST |
BUDGET |
|
MAIN ADDITIONS |
5,570,000 |
5,693,000 |
5,737,000 |
|
MAIN REPLACEMENTS |
99,910,000 |
102,681,000 |
111,779,000 |
|
SERVICE ADDITIONS |
9,379,000 |
9,586,000 |
9,097,000 |
|
SERVICE REPLACEMENTS |
23,971,000 |
24,498,000 |
26,011,000 |
|
METER/REGULATOR/CORROSION |
1,758,000 |
1,797,000 |
1,978,000 |
|
TOOLS |
1,386,000 |
1,416,000 |
1,400,000 |
|
CONDITIONED FUNDING RESERVE |
4,259,000 |
4,370,000 |
4,680,000 |
|
GROSS TOTAL DISTRIBUTION |
146,233,000 |
150,041,000 |
160,682,000 |
1 D-2
|
1 |
D-21 |
52-21-2-03 |
LONG TERM INFRASTRUCTURE PLAN - DSIC |
42,551,000 |
29,173,000 |
13,378,000 |
- |
- |
|
1 |
D-21 |
52-21-2-04 |
NG DIST INFRASTRUCTURE SAFETY AND MODERNIZATION |
29,593,000 |
18,217,000 |
5,688,000 |
3,982,000 |
1,706,000 |
|
1 |
D-23 |
52-23-2-01 |
EMERGENCY SHUTDOWN VALVES OUT OF COMPLI WITH DOT 192 |
476,000 |
171,000 |
305,000 |
- |
- |
|
1 |
D-24 |
52-24-2-02 |
RENEWAL OF 2" AND LARGER SERVICES |
1,415,000 |
116 |
908,000 |
507,000 |
- |
- |
|
1 |
D-24 |
52-24-2-01 |
RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT |
24,596,000 |
7,845 |
23,926,000 |
670,000 |
- |
- |
PRIORITY 2
|
2 |
D-29 |
52-29-1-01 |
ADDITIONAL TOOLS AND WORK EQUIPMENT |
284,000 |
237,000 |
47,000 |
- |
- |
|
2 |
D-29 |
52-29-2-01 |
REPLACEMENT OF UNUSABLE WORK EQUIPMENT |
1,116,000 |
567,000 |
549,000 |
- |
- |
- -
|
P |
|
CATEGORY |
|
AMOUNT |
FEET UNITS |
BUDGET YR |
YEAR 1 |
YEAR 2 |
YEAR 3 |
|
|
|
PRIORITY 3 |
|
|
|
|
|
|
|
3 |
D-20 |
52-20-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY AND STATE WORK |
736,000 |
1,444 |
224,000 |
512,000 |
- |
- |
|
3 |
D-21 |
52-21-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY, STATE /UNFORSEEN |
5,656,000 |
18,258 |
5,537,000 |
119,000 |
- |
- |
|
3 |
D-22 |
52-22-2-01 |
ENFORCED RELOCATIONS CAUSED BY CITY, STATE WORK |
703,000 |
1,791 |
239,000 |
464,000 |
- |
- |
2,511,000
PRIORITY 4
|
MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND |
3,122,000 |
15,984 |
1,556,000 |
1,566,000 |
- - |
|
MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING |
2,353,000 |
7,280 |
1,261,000 |
1,092,000 |
- - |
|
STALL OF METERS/REGULATORS FOR NEW CUSTOMERS |
362,000 |
- |
208,000 |
154,000 |
- - |
|
MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL |
262,000 |
818 |
152,000 |
110,000 |
- - |
|
STALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH, |
6,488,000 |
1,413 |
5,062,000 |
1,426,000 |
- - |
|
STALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH, |
2,609,000 |
168 |
2,313,000 |
296,000 |
- - |
TOTAL DISTRIBUTION DEPARTMENT: 160,682,000 114,036,000 36,278,000 3,982,000 1,706,000

|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
DISTRIBUTION DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
EXPENDED 4,036,000
4,691,000 - 31,587,000 - 36,278,000
- - 3,982,000 - 3,982,000
- - 1,706,000 - 1,706,000
- - - - -
|
TOTAL |
15,480,000 |
|
15,480,000 |
|
145,202,000 |
|
140,522,000 |
|
160,682,000 |
|
156,002,000 |
|
FIELD SERVICES DEPARTMENT |
|
AMENDED COMPLIANCE |
|
SUMMARY |
ADDITIONS
50-3 2,780,000
46,000 147,000 193,000
80,000 547,000 627,000
- 154,000 154,000
GROSS TOTAL FIELD SERVICES 2,906,000 17,600,000 20,506,000
NET TOTAL FIELD SERVICES 2,906,000 17,600,000 20,506,000
* FIELD SERVICES DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS
|
FIELD SERVICES DEPARTMENT |
|
AMENDED COMPLIANCE |
|
BUDGET/FORECAST COMPARISON |
CATEGORY
50-30 METERS ADDITIONS REPLACEMENTS
TOTAL
SERVICE
50-32 REGULATORS ADDITIONS AND
INSTALLATIONS REPLACEMENTS
TOTAL
50-33 TELEMETERING ADDITIONS AND
INSTALLATIONS REPLACEMENTS
TOTAL ADDITIONS
REPLACEMENTS
TOTAL
SERVICE
50-35 SECTION ADDITIONS EQUIPMENT REPLACEMENTS
TOTAL
AUTOMATIC
50-36 METER ADDITIONS
READING REPLACEMENTS TOTAL
GROSS TOTAL FIELD SERVICES
LESS: SALVAGE
LESS: CONTRIBUTIONS*
NET TOTAL FIELD SERVICES

* FIELD SERVICES DEPARTMENT CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS
AMOUNT
|
4 |
50-30-1-01 |
PURCHASE AND INSTALLATION OF METERS TO PROVIDE FOR |
2,780,000 |
|
|
|
NEW CUSTOMERS |
|
|
5 |
50-30-2-01 |
PURCHASE METERS TO SUPPORT METER TESTING |
16,752,000 |
|
4 |
50-32-1-01 |
PURCHASE AND INSTALLATION OF SERVICE REGULATORS |
46,000 |
|
2 |
50-32-2-01 |
PURCHASE VARIOUS SIZE SERVICE REGULATORS AS REPLACEMENTS |
147,000 |
|
C-33 |
COMMERCIAL & INDUSTRIAL TELEMETERING SYSTEMS |
|
4 |
50-33-1-01 |
NON-RESIDENTIAL ENDPOINT ADDITIONS |
80,000 |
|
2 |
50-33-2-01 |
NON-RESIDENTIAL ENDPOINT REPLACEMENTS |
547,000 |
|
C-34 |
METER SHOP EQUIPMENT |
|
2 |
50-34-2-01 |
REPL OBSOLETE SHOP EQUIP, HAND-HELD TOOLS/ SW PACKAGE FOR AMR |
154,000 |
50-98-2-98
|
NET TOTAL FIELD SERVICES DEPARTMENT |
20,506,000 |
|
FIELD SERVICES DEPARTMENT |
|
LISTING BY PRIORITY |
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
AMOUNT BUDGET YR YEAR 1 YEAR 2 YEAR 3
PRIORITY 2
PURCHASE VARIOUS SIZE SERVICE REGULATORS AS REPLACEMENTS 147,000 147,000 - - -
|
2 |
C-33 |
50-33-2-01 |
NON-RESIDENTIAL ENDPOINT REPLACEMENTS |
547,000 |
55,000 |
492,000 |
- |
- |
|
2 |
C-34 |
50-34-2-01 |
REPL OBSOLETE SHOP EQUIP, HAND-HELD TOOLS/ SW PACKAGE FOR AMR |
154,000 |
139,000 |
15,000 |
- |
- |
|
|
|
|
PRIORITY 4 |
|
|
|
|
|
|
4 |
C-30 |
50-30-1-01 |
PURCHASE AND INSTALLATION OF METERS TO PROVIDE FOR NEW CUSTOMERS |
2,780,000 |
2,780,000 |
- |
- |
- |
|
4 |
C-32 |
50-32-1-01 |
PURCHASE AND INSTALLATION OF SERVICE REGULATORS |
46,000 |
46,000 |
- |
- |
- |
|
4 |
C-33 |
50-33-1-01 |
NON-RESIDENTIAL ENDPOINT ADDITIONS |
80,000 |
24,000 |
56,000 |
- |
- |
PRIORITY 5
|
5 |
C-30 |
50-30-2-01 |
PURCHASE METERS TO SUPPORT METER TESTING |
16,752,000 |
11,269,000 |
5,483,000 |
- |
- |
|
TOTAL FIELD SERVICES DEPARTMENT: |
20,506,000 14,460,000 6,046,000 - - |
|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
FIELD SERVICES DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
TOTAL ENCUMBERED
20,506,000
56,000 - 5,990,000 - 6,046,000
- - - - -
- - - - -
- - - - -
|
TOTAL |
2,906,000 |
|
2,906,000 |
|
17,600,000 |
|
17,600,000 |
|
20,506,000 |
|
20,506,000 |
|
FLEET OPERATIONS DEPARTMENT |
|
AMENDED COMPLIANCE |
|
BUDGET/FORECAST COMPARISON |
2027 2026
BUDGET vs COMPL BUDGET
2027 BUD vs 2027 FORECAST
CATEGORY
$ % $ % DIFFERENCE DIFF. DIFFERENCE DIFF.
73-01-1-02 MOBILE EQUIPMENT ADDITIONS
73-01-1-03 VEHICLE ADDITIONS
73-01-1-01 SHOP EQUIPMENT ADDITIONS
73-01-2-02 MOBILE EQUIPMENT REPLACEMENTS
73-01-2-03 VEHICLE REPLACEMENTS (2-YEAR)
73-01-2-04 VEHICLE REPLACEMENTS (3-YEAR)
GROSS TOTAL FLEET OPERATIONS LESS: SALVAGE
NET TOTAL FLEET OPERATIONS
326,000
(39,000)
(98,000)
397,000
(2,715,000)
4,904,000
2,775,000
2,775,000
N/A
-100.0%
-100.0%
24.6%
-31.5%
N/A 26.8%
N/A 26.8%
326,000.00
-
- (107,000)
(4,928,000)
4,904,000
195,000
195,000
N/A N/A N/A
-5.1%
-45.5%
N/A 1.5%
N/A 1.5%
|
FLEET OPERATIONS DEPARTMENT |
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
P AMOUNT
|
1 |
73-01-1-02 |
MOBILE EQUIPMENT ADDITIONS |
326,000 |
|
2 |
73-01-2-02 |
MOBILE EQUIPMENT REPLACEMENTS |
2,010,000 |
|
2 |
73-01-2-03 |
VEHICLE REPLACEMENTS (2-YEAR) |
5,906,000 |
|
273-01-2-04VEHICLE REPLACEMENTS (3-YEAR)4,904,000 |
|
|
|
|
GROSS TOTAL FLEET OPERATIONS |
13,146,000 |
|
NET TOTAL FLEET OPERATIONS |
13,146,000 |
|
FLEET OPERATIONS DEPARTMENT |
|
LISTING BY PRIORITY |
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
AMOUNT BUDGET YR YEAR 1 YEAR 2 YEAR 3
PRIORITY 1
1 326,000 - - -
PRIORITY 2
2 2,010,000 - - -
2 982,000 - -
2 000 -
000 -

|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
FLEET OPERATIONS DEPARTMENT ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
TOTAL ENCUMBERED
13,146,000
- - - - -
- - - - -
|
TOTAL |
326,000 |
|
326,000 |
|
12,820,000 |
|
12,820,000 |
|
13,146,000 |
|
13,146,000 |
-
|
FACILITIES |
|
AMENDED COMPLIANCE |
|
|
|
BUDGET/FORECAST |
COMPARISON |
|
|
|
|
|
|
|
|
|
2027 |
2026 |
2027 BUD vs 2027 FORECAST |
|
|
|
|
|
BUDGET vs |
COMPL BUDGET |
|
|
|
2026 COMPL |
2027 |
2027 AMENDED COMPL |
$ |
% |
$ |
% |
|
CATEGORY |
|
BUDGET |
FORECAST |
BUDGET |
DIFF. |
DIFF. |
DIFF. |
DIFF. |
|
72-01-1-01 |
MISCELLANEOUS CAPITAL ADDITIONS |
84,000 |
85,000 |
107,000 |
23,000 |
27.4% |
22,000 |
25.9% |
|
72-01-1-02 |
MISCELLANEOUS CAPITAL ADDITIONS - GAS |
|
|
|
|
|
|
|
|
|
PROCESSING |
5,000 |
5,000 |
6,000 |
1,000 |
20.0% |
1,000 |
20.0% |
|
72-01-2-01 |
MISCELLANEOUS CAPITAL |
|
|
|
|
|
|
|
|
|
REPLACEMENTS/STRUCTURAL REPAIRS |
368,000 |
375,000 |
289,000 |
(79,000) |
-21.5% |
(86,000) |
-22.9% |
|
72-01-2-02 |
MISCELLANEOUS CAPITAL REPLACEMENTS - GAS |
|
|
|
|
|
|
|
|
|
PROCESSING |
20,000 |
20,000 |
20,000 |
- |
0.0% |
- |
0.0% |
|
72-01-2-03 |
MISC CAPITAL REPL - STRUCTURAL REPAIRS - GAS |
|
|
|
|
|
|
|
|
|
PROCESSING |
12,000 |
12,000 |
13,000 |
1,000 |
8.3% |
1,000 |
8.3% |
|
72-01-2-04 |
REPLACE CARPETS |
50,000 |
50,000 |
50,000 |
- |
0.0% |
- |
0.0% |
|
72-01-2-05 |
REPLACE MODULAR FURNITURE |
50,000 |
50,000 |
50,000 |
- |
0.0% |
- |
0.0% |
|
72-02-1-01 |
NOC OUTDOOR MATERIAL LAYDOWN YARD PAVING |
|
|
|
|
|
|
|
|
|
|
- |
- |
410,000 |
410,000 |
N/A |
410,000 |
N/A |
|
72-02-1-02 |
800 BUILDING CHILLER PLANT |
|
|
|
|
|
|
|
|
|
SEQUENCING/OPTIMIZATION |
- |
- |
340,000 |
340,000 |
N/A |
340,000 |
N/A |
|
72-01-2-08 |
SOUTH OPERATIONS CENTER (SOC) |
- |
- |
13,532,000 |
13,532,000 |
N/A |
13,532,000 |
|
|
|
2023 REAUTHORIZATION |
|
|
|
|
|
|
|
|
72-01-2-08 |
REPLACE PORTER FUELING STATION* |
- |
- |
- |
- |
N/A |
- |
|
|
|
2025 REAUTHORIZATION |
|
|
|
- |
|
|
|
|
72-01-2-06 |
800 BUILDING 1ST FLOOR RENOVATIONS PHASE 2* |
- |
- |
- |
- |
N/A |
- |
N/A |
|
|
|
|
|
|
|
|
|
N/A |
|
72-01-2-05 |
800 BUILDING STAIR TOWER RENOVATION* |
- |
- |
- |
- |
N/A |
- |
N/A |
|
|
|
|
|
|
|
|
|
N/A |
|
|
TOTAL FACILITIES |
589,000 |
597,000 |
14,817,000 |
14,228,000 |
2415.6% |
14,220,000 |
2381.9% |
|
OTHER DEPARTMENTS |
|
AMENDED COMPLIANCE |
|
SUMMARY |
CATEGORY ADDITIONS REPLACEMENTS TOTAL
TOTAL OTHER DEPARTMENTS 2,939,000 17,438,000 20,377,000

|
OTHER DEPARTMENTS |
|
AMENDED COMPLIANCE |
|
BUDGET/FORECAST COMPARISON |
CATEGORY
FACILITIES ADDITIONS
REPLACEMENTS
TOTAL
INFORMATION SERVICES ADDITIONS REPLACEMENTS
TOTAL
RISK MANAGEMENT &
ENVIRONMENTAL SERVICES ADDITIONS REPLACEMENTS
TOTAL
TOTAL OTHER DEPARTMENTS

AMOUNT
1
1
1
1
1
1
1
1
1
5
1
1 72-01-2-06
1
|
TOTAL FACILITIES |
14,817,000 |
OTHER DEPARTMENTS
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET
P AMOUNT
INFORMATION SERVICES
2
2
2
5
1
1
5
1
|
TOTAL INFORMATION SERVICES |
5,466,000 |
RISK MANAGEMENT & ENVIRONMENTAL SERVICES
5
|
TOTAL CHEMICAL SERVICES |
94,000 |
|
TOTAL OTHER DEPARTMENTS |
20,377,000 |
*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS
|
OTHER DEPARTMENTS |
|
LISTING BY PRIORITY |
|
FISCAL 2027 AMENDED COMPLIANCE CAPITAL BUDGET |
AMOUNT BUDGET YR YEAR 1 YEAR 2 YEAR 3
PRIORITY 1
|
1 |
72-01-1-01 |
MISCELLANEOUS CAPITAL ADDITIONS |
107,000 |
21,000 |
86,000.00 |
- |
- |
|
1 |
72-01-1-02 |
MISCELLANEOUS CAPITAL ADDITIONS - GAS PROCESSING |
6,000 |
6,000 |
- |
- |
- |
|
1 |
72-01-2-01 |
MISCELLANEOUS CAPITAL REPLACEMENTS/STRUCTURAL REPAIRS |
289,000 |
58,000 |
231,000.00 |
- |
- |
|
1 |
72-01-2-02 |
MISCELLANEOUS CAPITAL REPLACEMENTS - GAS PROCESSING |
20,000 |
4,000 |
16,000.00 |
- |
- |
|
1 |
72-01-2-03 |
MISC CAPITAL REPL - STRUCTURAL REPAIRS - GAS PROCESSING |
13,000 |
3,000 |
10,000.00 |
- |
- |
1
1 118,000 - - -
PRIORITY 2
|
2 |
47-01-1-01 |
MISC ADDITIONS - SERVER, NETWORK AND HARDWARE |
1,062,000 |
400,000 |
662,000 |
- |
- |
|
2 |
47-01-1-02 |
MISC ADDITIONS - SOFTWARE |
100,000 |
25,000 |
75,000 |
- |
- |
|
2 |
47-01-1-03 |
ADDITIONS - SAN STORAGE |
|
- |
- |
- |
- |
PRIORITY 5

5 - - - -
5
5
5 13,532,000 - - -
|
|
|
2023 REAUTHORIZATION |
|
|
|
|
|
|
1 |
72-01-2-08 |
REPLACE PORTER FUELING STATION* |
- |
- |
- |
- |
- |
|
|
|
2025 REAUTHORIZATION |
|
|
|
|
|
|
1 |
72-01-2-06 |
800 BUILDING 1ST FLOOR RENOVATIONS PHASE 2* |
- |
- |
- |
- |
- |
|
1 |
72-01-2-05 |
800 BUILDING STAIR TOWER RENOVATION* |
- |
- |
- |
- |
- |
|
TOTAL OTHER DEPARTMENTS: |
20,377,000 |
17,033,000 3,344,000 - - |
|
*THESE REAUTHORIZATIONS OF A PREVIOUS BUDGET REFLECT NO INCREASE IN SPENDING AUTHORIZATION, BUT REQUIRES AN EXTENSION OF THE PROJECTS' LIFESPAN FOR AN ADDITIONAL TWELVE (12) MONTHS |
|
|
PHILADELPHIA GAS WORKS |
|
AMENDED COMPLIANCE |
|
OTHER DEPARTMENTS ESTIMATE OF ENCUMBERANCE AND EXPENDITURE |
TOTAL ENCUMBERED
20,377,000
1,935,000 - 1,409,000 - 3,344,000
- - - - -
- - - - -
- - - - -
|
TOTAL |
2,939,000 |
|
2,939,000 |
|
17,438,000 |
|
17,438,000 |
|
20,377,000 |
|
20,377,000 |
FIVE YEAR FORECAST
|
PHILADELPHIA GAS WORKS |
|
FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032 |
GAS P
|
DISTRIBUTION |
|
|
|
|
|
|
|
ADDITIONS |
15,480,000 |
15,821,000 |
16,169,000 |
16,525,000 |
16,887,000 |
17,259,000 |
|
REPLACEMENTS |
145,202,000 |
146,739,000 |
148,903,000 |
119,505,000 |
121,170,000 |
122,871,000 |
|
GROSS TOTAL DISTRIBUTION |
160,682,000 |
162,560,000 |
165,072,000 |
136,030,000 |
138,057,000 |
140,130,000 |
|
LESS: SALVAGE |
|
|
|
|
|
|
|
LESS: CONTRIBUTIONS* |
|
|
|
|
|
|
|
LESS: REIMBURSEMENT** |
(8,478,000) |
(8,665,000) |
(8,856,000) |
(9,051,000) |
(9,251,000) |
(9,454,000) |
|
PHILADELPHIA GAS WORKS |
|
FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032 |
|
|
AMENDED COMPLIANCE |
|
|
|
|
|
|
|
2027 |
|
|
|
|
|
|
|
CAPITAL |
FORECAST |
|
|
|
DEPARTMENT |
BUDGET |
2028 |
2029 |
2030 |
2031 |
2032 |
|
FIELD SERVICES |
|
|
|
|
|
|
|
ADDITIONS |
2,906,000 |
2,713,000 |
2,723,000 |
2,753,000 |
2,890,000 |
2,978,000 |
|
REPLACEMENTS |
17,600,000 |
18,944,000 |
19,019,000 |
19,227,000 |
20,189,000 |
20,799,000 |
21,657,000 21,742,000 21,980,000 23,079,000 23,777,000
|
PHILADELPHIA GAS WORKS |
|
FISCAL YEAR 2027 AND FORECAST 2028 THROUGH 2032 |
|
* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH |
|
DEPARTMENT |
|
GAS PROCESSING |
|
ADDITIONS |
|
REPLACEMENTS |
TOTAL GAS PROCESSING
DISTRIBUTION
ADDITIONS
REPLACEMENTS
GROSS TOTAL DISTRIBUTION LESS: SALVAGE
LESS: CONTRIBUTIONS* LESS: REIMBURSEMENT**
NET TOTAL DISTRIBUTION
FIELD SERVICES
ADDITIONS REPLACEMENTS
GROSS TOTAL FIELD SERVICES
LESS: SALVAGE LESS: CONTRIBUTIONS*
NET TOTAL FIELD SERVICES
|
|
2027 - 2031 |
2028 - 2032 |
AMOUNT |
PERCENT |
|
DEPARTMENT |
FORECAST |
FORECAST |
DIFFERENCE |
DIFFERENCE |
|
FLEET OPERATIONS |
|
|
|
|
|
ADDITIONS |
- |
- |
- |
|
|
REPLACEMENTS |
52,018,000 |
42,502,000 |
(9,516,000) |
-18.3% |
|
GROSS TOTAL FLEET OPERATIONS |
52,018,000 |
42,502,000 |
(9,516,000) |
-18.3% |
|
LESS: SALVAGE |
|
|
|
|
|
NET TOTAL FLEET OPERATIONS |
52,018,000 |
42,502,000 |
(9,516,000) |
-18.3% |
|
OTHER |
|
|
|
|
|
ADDITIONS |
2,310,000 |
13,411,000 |
11,101,000 |
480.6% |
|
REPLACEMENTS |
5,170,000 |
14,000,000 |
8,830,000 |
170.8% |
|
TOTAL OTHER |
7,480,000 |
27,411,000 |
19,931,000 |
266.5% |
|
TOTAL |
|
|
|
|
|
ADDITIONS |
103,017,000 |
110,259,000 |
7,242,000 |
7.0% |
|
REPLACEMENTS |
1,039,030,000 |
1,092,759,000 |
53,729,000 |
5.2% |
|
GROSS TOTAL |
1,142,047,000 |
1,203,018,000 |
60,971,000 |
5.3% |
|
LESS: SALVAGE |
- |
- |
- |
|
|
LESS: REIMBURSEMENT** |
(29,266,000) |
(45,277,000) |
(16,011,000) |
54.7% |
|
LESS: CONTRIBUTIONS* |
- |
- |
- |
|
|
NET TOTAL |
1,112,781,000 |
1,157,741,000 |
44,960,000 |
4.0% |
|
* CONTRIBUTIONS ARE POTENTIAL CUSTOMER CONTRIBUTIONS |
|
** REIMBURSEMENT TO PGW FOR RELOCATING STRUCTURES & EQUIPMENT AND/OR LOAD GROWTH |
2028 2029 2030 2031 2032
181,992,000 - - -
10,558,000 - - -
2,500,000 2,500,000 - -
5,500,000 5,500,000 - -
- 9,135,000 9,135,000 -
- 1,577,000 - -
- - - 8,000,000
300,000 - - -
- 1,800,000 - -
- - 1,900,000 -
- - - 2,000,000
450,000 - - -
- - - 730,000
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
201,300,000 35,375,000 24,835,000 10,730,000

2028 2029 2030 2031 2032
GP-3 BUILDING AND GROUNDS
2,000,000 - - -
2,000,000 - - -

GP-4 MISCELLANEOUS CAPITAL REQUIREMENTS
24,000 25,000 26,000 27,000
321,000 328,000 335,000 342,000
345,000 353,000 361,000 369,000

2024 REAUTHORIZATION
REPLACE LNG SWITCHGEAR - RICHMOND* - - - - - -
- - - -
- - - -
- - - -
- - - -
- - - -

204,145,000 35,728,000 25,696,000 13,075,000
D-20 HIGH PRESSURE MAINS
MAIN ADDITIONS FOR LOADS TO SUPPLY INDUSTRIAL AND 2,922,000 3,122,000 3,191,000 3,261,000 3,333,000 3,406,000 3,481,000 16,672,000 COMMERCIAL CUSTOMERS
752,000 769,000 786,000 803,000 821,000
3,943,000 4,030,000 4,119,000 4,209,000 4,302,000
3,943,000 4,030,000 4,119,000 4,209,000 4,302,000 20,603,000

D-21 8 INCH AND SMALLER I. P. AND L. P. MAIN
MAINS ADDITIONS FOR LOADS TO SUPPLY NEW AND EXISTING 2,390,000 2,353,000 2,405,000 2,458,000 2,512,000 2,567,000 RESIDENTIAL, COMMERCIAL, AND MAJOR ACCOUNT CUSTOMERS
5,780,000 5,907,000 6,037,000 6,170,000 6,306,000 30,200,000
D-22 12 INCH AND LARGER I. P. AND L. P. MAIN
|
MAIN ADDITIONS TO SUPPLY INDUSTRIAL AND COMMERCIAL CUSTOMERS |
258,000 |
262,000 |
268,000 |
274,000 |
280,000 |
286,000 |
292,000 |
1,400,000 |
|
|
|
|
718,000 |
734,000 |
750,000 |
767,000 |
784,000 |
3,753,000 |
6,298,000 6,437,000 6,579,000 6,724,000 6,872,000 32,910,000
|
GROSS TOTAL D-22 |
3,911,000 |
7,127,000 |
7,284,000 |
7,445,000 |
7,609,000 |
7,777,000 |
7,948,000 |
38,063,000 |

(5,668,000) (5,793,000) (5,921,000) (6,052,000) (6,185,000) (29,619,000)
1,616,000 1,652,000 1,688,000 1,725,000 1,763,000 8,444,000

D-23 CUSTOMER METERING & REGULATOR INSTALLATION, AND PRESSURE REGULATION & CORROSION CONTROL FACILITIES
NSTALL OF METERS/REGULATORS FOR NEW CUSTOMERS 307,000 362,000 370,000 378,000 386,000 394,000 403,000 1,931,000
486,000 497,000 508,000 519,000 530,000 2,540,000
1,165,000 1,191,000 1,217,000 1,244,000 1,271,000 6,088,000
GROSS TOTAL D-23 1,758,000 1,978,000 2,021,000 2,066,000 2,111,000 2,157,000 2,204,000 10,559,000

2,021,000 2,066,000 2,111,000 2,157,000 2,204,000 10,559,000

D-24 SERVICES
|
NSTALLATION OF NEW 1-1/4" AND SMALLER SERVICES, HIGH, NTERMEDIATE AND LOW PRESSURE |
|
6,808,000 |
|
6,488,000 |
|
6,631,000 |
|
6,777,000 |
|
6,926,000 |
|
7,078,000 |
|
7,234,000 |
|
34,646,000 |
|
NSTALLATION OF NEW 2 INCH AND LARGER SERVICES, HIGH, |
|
2,571,000 |
|
2,609,000 |
|
2,666,000 |
|
2,725,000 |
|
2,785,000 |
|
2,846,000 |
|
2,909,000 |
|
13,931,000 |
|
NTERMEDIATE AND LOW PRESSURE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RENEWAL OF 1-1/4" AND SMALLER SERVICES FOR PRUDENT |
|
22,821,000 |
|
24,596,000 |
|
25,137,000 |
|
25,690,000 |
|
26,255,000 |
|
26,833,000 |
|
27,423,000 |
|
131,338,000 |
|
REASONS, AS A RESULT OF PGW'S MAIN REPL PROG, CUSTOMER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMPLAINTS OR CITY AND STATE WORK |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RENEWAL OF 2" AND LARGER SERVICES |
|
1,150,000 |
|
1,415,000 |
|
1,446,000 |
|
1,478,000 |
|
1,511,000 |
|
1,544,000 |
|
1,578,000 |
|
7,557,000 |
|
|
GROSS TOTAL D-24 |
33,350,000 |
|
35,108,000 |
|
35,880,000 |
|
36,670,000 |
|
37,477,000 |
|
38,301,000 |
|
39,144,000 |
|
187,472,000 |
|
|
|
|
|
|
|
35,880,000 |
|
36,670,000 |
|
37,477,000 |
|
38,301,000 |
|
39,144,000 |
|
187,472,000 |
|
D-25 - CONDITIONED FUNDING CONDITIONED FUNDING RESERVED |
|
4,259,000 |
|
4,680,000 |
|
4,735,000 |
|
4,808,000 |
|
3,962,000 |
|
4,021,000 |
|
4,081,000 |
|
21,607,000 |
|
TOTAL D-25 |
4,259,000 |
4,680,000 |
4,735,000 |
4,808,000 |
3,962,000 |
4,021,000 |
4,081,000 |
21,607,000 |
|
DISTRIBUTION DEPARTMENT |
|
FORECAST - FISCAL YEARS 2028 THROUGH 2032 |
|
|
|
2026 AMENDED COMPLIANCE BUDGET |
2027 AMENDED COMPLIANCE BUDGET |
|
|
|
|
|
TOTAL |
|
|
|
|
|
2028 |
2029 |
2030 |
2031 |
2032 |
FORECAST |
|
|
|
D-29 OTHER DISTRIBUTION FACILITIES |
|
|
|
|
|
|
|
|
|
2 |
52-29-1-01 |
ADDITIONAL TOOLS AND WORK EQUIPMENT |
275,000 |
284,000 |
290,000 |
296,000 |
303,000 |
310,000 |
317,000 |
1,516,000 |
|
2 |
52-29-2-01 |
REPLACEMENT OF UNUSABLE WORK EQUIPMENT |
1,111,000 |
1,116,000 |
1,141,000 |
1,166,000 |
1,192,000 |
1,218,000 |
1,245,000 |
5,962,000 |
|
|
52-XX-X-XX |
NON-RECURRING ITEMS |
|
|
|
|
|
|
|
|
|
|
|
TOTAL D-29 |
1,386,000 |
1,400,000 |
1,431,000 |
1,462,000 |
1,495,000 |
1,528,000 |
1,562,000 |
7,478,000 |
52-98-2-98
C-30 METERS ADDITIONS AND INSTALLATIONS
2,577,000 2,587,000 2,615,000 2,746,000 2,829,000 13,354,000
18,071,000 18,141,000 18,337,000 19,258,000 19,841,000 93,648,000
20,648,000 20,728,000 20,952,000 22,004,000 22,670,000 107,002,000

C-32 SERVICES REGULATORS
ADDITIONS AND INSTALLATIONS 98,000 46,000 53,000 53,000 54,000 56,000 58,000 274,000
153,000 153,000 155,000 163,000 168,000 792,000
206,000 206,000 209,000 219,000 226,000 1,066,000

C-33 TELEMETERING
ADDITIONS AND INSTALLATIONS 126,000 80,000 83,000 83,000 84,000 88,000 91,000 429,000
563,000 565,000 571,000 600,000 618,000 2,917,000
646,000 648,000 655,000 688,000 709,000 3,346,000


C-34 METER SHOP EQUIPMENT
C-35 SERVICE SECTION EQUIPMENT
- - - - - -
- - - - - -

C-36 AUTOMATIC METER READING
ADDITIONS - - - - - - - -
- - - - - -
- - - - - -

|
1 |
50-99-2-99 |
C-99 COST OF REMOVAL |
21,657,000 21,742,000 21,980,000 23,079,000 23,777,000 112,235,000

50-98
50-94
21,657,000 21,742,000 21,980,000 23,079,000 23,777,000 112,235,000

|
ACQUIRE ASSETS |
8,699,000 |
20,506,000 21,657,000 21,742,000 21,980,000 23,079,000 23,777,000 112,235,000 |
|
LEASE |
|
|
|
FLEET OPERATIONS DEPARTMENT |
|
FORECAST - FISCAL YEARS 2028 THROUGH 2032 |
2028 2029 2030 2031 2032
TOTAL FORECAST
- - - - - -
- - - - - -
- - - - - -
1,925,000 - 1,525,000 2,224,000 528,000 6,202,000
13,585,000 7,956,000 3,826,000 3,545,000 7,388,000 36,300,000
- - - - - -
15,510,000 7,956,000 5,351,000 5,769,000 7,916,000 42,502,000
ACQUIRE ASSETS 10,371,000 
|
13,146,000 15,510,000 7,956,000 5,351,000 5,769,000 7,916,000 42,502,000 |
|
LEASE |
|
|
|
|
|
OTHER DEPARTMENTS |
|
FORECAST - FISCAL YEARS 2028 THROUGH 2032 |
|
|
|
|
2026 AMENDED COMPLIANCE BUDGET |
2027 AMENDED COMPLIANCE BUDGET |
2028 |
2029 |
2030 |
2031 |
2032 |
TOTAL FORECAST |
|
|
|
FACILITIES |
|
|
|
|
|
|
|
|
|
1 |
72-01-1-01 |
MISCELLANEOUS CAPITAL ADDITIONS |
84,000 |
107,000 |
108,000 |
109,000 |
110,000 |
111,000 |
112,000 |
550,000 |
6,000 6,000 6,000 6,000 30,000
301,000 307,000 313,000 319,000 1,535,000
22,000 23,000 24,000 25,000 115,000
15,000 16,000 17,000 18,000 80,000
50,000 50,000 50,000 50,000 250,000
50,000 50,000 50,000 50,000 50,000 250,000
- - - - - -
- - - - - -
- - - - - -
100,000 - - - - 100,000
100,000 - - - - 100,000
367,000 - - - - 367,000
2023 REAUTHORIZATION
- - - - - -
- - -
- - - - - -
- - - - - -
1,111,000 553,000 562,000 571,000 580,000 3,377,000

INFORMATION SERVICES
MISC ADDITIONS - SERVER, NETWORK AND HARDWARE 2,043,000 1,062,000 1,085,000 1,109,000 1,133,000 1,158,000 1,183,000 5,668,000
102,000 104,000 106,000 108,000 110,000 530,000
362,000 370,000 378,000 386,000 394,000 1,890,000
210,000 215,000 220,000 225,000 230,000 1,100,000
301,000 308,000 315,000 322,000 329,000 1,575,000
511,000 522,000 533,000 545,000 557,000 2,668,000
1,531,000 1,565,000 1,599,000 1,634,000 1,671,000 8,000,000
121,000 124,000 127,000 130,000 133,000 635,000
- - - - - -
- - - - - -
- - - - - -
4,411,000 4,508,000 4,607,000 22,066,000

CORPORATE PLANNING
HYDROGEN SERVICES AND MEASUREMENTS - RICHMOND - - 984,000 - - - - 984,000
984,000 - - - - 984,000
1,968,000 - - - - 1,968,000

RISK MANAGEMENT & ENVIRONMENTAL SERVICES
REPLACEMENT OF GAS CHROMATOGRAPHS - 94,000
- - - -
- - - -

7,302,000 4,870,000 4,973,000 5,079,000 5,187,000 27,411,000

PHILADELPHIA GAS WORKS CAPITAL FINANCING PLAN
As a result of the FY 2011 Operating Budget proceedings, a motion was approved that directed PGW to begin with its FY 2012 Capital Budget filing to include with each proposed Capital Budget and Capital Budget Amendment a proposed Capital Funding plan pursuant to Section IV.2.b of the Management Agreement.
In this section of the Management Agreement, funds required to be supplied must be identified between:
i. Funds generated within the business through charges to customers or otherwise; and
ii. Funds to be obtained through capital loans.
Capital Spending in FY 2027 (AMENDED COMPLIANCE)
• Spending from FY 2027 Program $ 154,564,000
• Spending Carryover from FY 2024, 2025, 2026 $ 141,606,000
• Total FY 2027 Spending $ 296,170,000
• Projected Reimbursement $ 8,478,000
• Salvage $ 269,000
• Construction Contributions $ 1,846,000
• Net FY 2027 Capital Spending $ 285,577,000
Capital Funding Sources:
• Debt $ 142,788,500
• DSIC $ 42,551,000
• Federal Grant Revenue (PHMSA) $ 31,488,000
• Internally Generated Funds $ 68,749,500
• FY 2027 Capital Funding $ 285,577,000
The funding plan is based upon current financial projections and is subject to changes based upon PGW’s financial conditions at the time funds are required to support the FY 2027 Capital Program.
End
|