Title
To adopt a Capital Program for the six Fiscal Years 2005-2010 inclusive.
Body
THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:
SECTION 1. A Capital Program for the six Fiscal Years 2005 to 2010, inclusive, totaling five billion eighty-five million five hundred seventy-two thousand (5,085,572,000) dollars in estimated costs, is hereby adopted as follows:
2005
2006
2007
2008
2009
2010
2005-2010
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
CITY FUNDS - TAX SUPPORTED
CN	New Loans
74,560
60,719
53,086
47,979
46,316
45,805
328,465
CR	Operating Revenue
31,353
4,550
4,550
5,250
5,250
5,250
56,203
CT	Carried Forward Loans
219,834
219,834
CA	Prefinanced Loans
1,000
1,000
1,000
1,000
1,000
1,000
6,000
A	PICA Prefinanced Loans
8,125
8,125
CITY FUNDS - SELF SUSTAINING
XN	Self Sustaining New Loans
151,070
256,042
227,796
325,468
236,733
253,867
1,450,976
XR	Self Sustaining Operating
59,023
16,548
16,748
16,948
17,148
17,348
143,763
XT	Self Sustaining Operating
564,810
564,810
OTHER CITY FUNDS
Z	Revolving Funds
16,000
2,000
2,000
2,000
2,000
2,000
26,000
OTHER THAN CITY FUNDS
FB	Federal
248,094
107,028
107,024
74,406
63,832
65,292
665,676
FO	Federal Off Budget
139,183
183,797
174,017
170,618
143,282
108,614
919,511
SB	State
39,117
13,176
9,711
4,884
4,448
5,738
77,074
SO	State Off Budget
52,183
65,152
47,479
44,522
64,132
66,576
340,044
PB	Private
73,213
28,520
28,520
28,520
28,520
28,520
215,813
TB	Other Governments/Agencies
56,514
56,514
TO	Other Governments Off Budget
809
1,545
1,220
994
974
1,222
6,764
TOTALS ALL FUNDS
1,734,888
740,077
673,151
722,589
613,635
601,232
5,085,572
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000	 
ART MUSEUM	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
ART MUSEUM COMPLEX - CAPITAL	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|PHILADELPHIA MUSEUM OF ART - BUILDING REHABILITATION	1,000 		465		585 		950 		950 		950 		4,900	 
 	 	1,000 	CN	465	CN	585 	CN	950 	CN	950 	CN	950	CN	4,900	CN
1A 	PHILADELPHIA MUSEUM OF ART - BUILDING REHAB-FY 04	1,000	  	 	 	 	 	 	 	 	 	 		1,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 		1,000	CT
1B 	PHILADELPHIA MUSEUM OF ART - BUILDING REHAB-FY 03	1,000	 	 	 	 	 	 	 	 	 	 		1,000	
		1,000	CT	 	  	 	 	 	 	 	 	 		1,000	CT
1C 	ART MUSEUM - BUILDING REHABILITATION-FY 02	1,000	 	 	   			 	 	 	 			1,000	 
 	 	1,000	CT	 	  	 	 	 	 	 	 			1,000	CT
1D 	ART MUSEUM - BUILDING REHABILITATION-FY 01	1,851	 	 	  	 	 	 	 	 	  			1,851	 
 	 	1,851	CT	 	  	 	 	 	 	 	 			1,851	CT
1E 	ART MUSEUM - BUILDING REHABILITATION-FY 00	4,240	 	 	  	 	 	 	 	 	 	 		4,240	 
 	 	2,056	A	 	  	 	 	 	 	 	 	 		2,056	A
 	 	2,184	CT	 	  	 	 	 	 	 	 	 		2,184	CT
1F 	BUILDING RENOVATIONS - FIRE, LIFE SAFETY 
	IMPROVEMENTS-FY 99	2,154	 	 	  	 	 	 	 	 	 	 		2,154	 
		2,154	CT	 	  	 	 	 	 	 	 	 		2,154	CT
1G 	BUILDING RENOVATIONS-FY 98	260	 	 	  	 	 	 	 	 	 	 		260	 
 	 	260	CT	 	  	 	 	 	 	 	 	 		260	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
1H 	CRITICAL RENOVATIONS-FY 94	305	 	 	 	 	 	 	 	 	 	 		305	 
	 	305	A	 	 	 	 	 	 	 	 	 	 	305	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
1I 	EXTERIOR/SITE IMPROVEMENTS-FY 98	105	 	 	 	 	 	 	 	 	 	 	 	105	 
 	 	105	CT	 	 	 	 	 	 	 	 	 	 	105	CT
 	 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 
1J 	FIRE, LIFE SAFETY & OTHER IMPS-FY 98	450	 	 	 	 	 	 	 	 	 	 	 	450	 
 	 	450	CT	 	 	 	 	 	 	 	 	 	 	450	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
1K 	FIRE, LIFE SAFETY & OTHER IMPS-FY 96	468	 	 	 	 	 	 	 	 	 	 	 	468	 
 	 	468	CT	 	 	 	 	 	 	 	 	 	 	468	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
1L 	FIRE, LIFE SAFETY & OTHER IMPS-FY 95	600	 	 	 	 	 	 	 	 	 	 	 	600	 
 	 	600	A	 	 	 	 	 	 	 	 	 	 	600	A
	 	 	 	 	 	 	 	 	 	 
1M 	HANDICAPPED ACCESS-FY 95	230	 	 	 	 	 	 	 	 	 	 	 	230	 
 	 	230	A	 	 	 	 	 	 	 	 	 	 	230	A
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|PHILADELPHIA MUSEUM OF ART - PERELMAN BUILDING RENOVATIONS	1,232 	 	 	 	 	 	 	 	 	 	 	 	1,232	  	 	1,232 	CN	 	 	 	 	 	 	 	 	 	 	1,232	CN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
2A 	PHILADELPHIA MUSEUM OF ART - PERELMAN BUILDING RENOVATIONS 
	-FY 04	1,232	 	 	 	 	 	 	 	 	 	 	 	1,232	 
 	 	1,232	CT	 	 	 	 	 	 	 	 	 	 	1,232	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
2B 	ART MUSEUM - RELIANCE (PERELMAN) BLDG-FY 03	1,424	 	 	 	 	 	 	 	 	 	 	 	1,424	 
 	 	1,424	CT	 	 	 	 	 	 	 	 	 	 	1,424	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
2C 	RELIANCE BUILDING RENOVATIONS-FY 02	1,040	 	 	 	 	 	 	 	 	 	 	 	1,040	 
 	 	1,040	CT	 	 	 	 	 	 	 	 	 	 	1,040	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
2D 	RELIANCE BUILDING RENOVATIONS-FY 01	1,108	 	 	 	 	 	 	 	 	 	 	 	1,108	 
 	 	1,108	CT	 	 	 	 	 	 	 	 	 	 	1,108	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
ART MUSEUM COMPLEX - CAPITAL	20,699 	 	465 	 	585 	 	950 	 	950 	 	950 	 	24,599	 
 	 	3,191 	A	 	 	 	 	 	 	 	 	 	 	3,191	A
 	 	2,232 	CN	465 	CN	585 	CN	950 	CN	950 	CN	950 	CN	6,132	CN
 	 	15,276 	CT	 	 	 	 	 	 	 	 	 	 	15,276	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
ART MUSEUM	20,699 	 	465 	 	585 	 	950 	 	950 	 	950 	 	24,599	 
 	 	3,191 	A	 	 	 	 	 	 	 	 	 	 	3,191	A
 	 	2,232 	CN	465 	CN	585 	CN	950 	CN	950 	CN	950 	CN	6,132	CN
 	 	15,276 	CT	 	 	 	 	 	 	 	 	 	 	15,276	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
AVIATION	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
NORTHEAST PHILADELPHIA AIRPORT	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|TAXIWAY EXPANSION PROGRAM	1,100 	 	1,100 	 	1,100 	 	 	 	 	 	 	 	3,300	 
 	 	900 	FB	900 	FB	900 	FB	 	 	 	 	 	 	2,700	FB
 	 	100 	SB	100 	SB	100 	SB	 	 	 	 	 	 	300	SB
 	 	100 	XN	100 	XN	100 	XN	 	 	 	 	 	 	300	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
3A 	TAXIWAY EXPANSION PROGRAM-FY 04	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	1,800	FB	 	 	 	 	 	 	 	 	 	 	1,800	FB
 	 	100	SB	 	 	 	 	 	 	 	 	 	 	100	SB
 	 	100	XT	 	 	 	 	 	 	 	 	 	 	100	XT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
3B 	TAXIWAY EXPANSION PROGRAM-FY 03	1,763	 	 	 	 	 	 	 	 	 	 	 	1,763	 
 	 	1,575	FB	 	 	 	 	 	 	 	 	 	 	1,575	FB
 	 	88	SB	 	 	 	 	 	 	 	 	 	 	88	SB
 	 	100	XT	 	 	 	 	 	 	 	 	 	 	100	XT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
3C 	TAXIWAY C EXTENSION - PHASE II & III-FY 01	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	190	SB	 	 	 	 	 	 	 	 	 	 	190	SB
 	 	10	XT	 	 	 	 	 	 	 	 	 	 	10	XT
 	
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
3D 	TAXIWAY C EXTENSION - PHASE II & III-FY 00	1,638	 	 	 	 	 	 	 	 	 	 	 	1,638	 
 	 	1,454	FB	 	 	 	 	 	 	 	 	 	 	1,454	FB
 	 	84	SB	 	 	 	 	 	 	 	 	 	 	84	SB
 	 	100	XT	 	 	 	 	 	 	 	 	 	 	100	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|AIRFIELD LIGHTING IMPROVEMENTS	500 	 	 	 	500 	 	 	 	 	 	 	 	1,000		 	450 	FB	 	 	450 	FB	 	 	 	 	 	 	900	FB
 	 	25 	SB	 	 	25 	SB	 	 	 	 	 	 	50	SB
 	 	25 	XN	 	 	25 	XN	 	 	 	 	 	 	50	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|SIDEWALK IMPROVEMENTS	250 	 	250 	 	 	 	 	 	 	 	 	 	500	 
 	 	250 	XN	250 	XN	 	 	 	 	 	 	 	 	500	XN
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
5A 	SIDEWALK IMPROVEMENTS-FY 04	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	XT	 	 	 	 	 	 	 	 	 	 	250	XT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|IMPROVEMENTS TO EXISTING FACILITIES	400 	 	400 	 	400 	 	400 	 	400 	 	400 	 	2,400	 
 	 	400 	XN	400 	XN	400 	XN	400 	XN	400 	XN	400 	XN	2,400	XN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6A 	IMPROVEMENTS TO EXISTING FACILITIES-FY 04	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	XT	 	 	 	 	 	 	 	 	 	 	400	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6B 	IMPROVEMENTS TO EXISTING FACILITIES-FY 03	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	XT	 	 	 	 	 	 	 	 	 	 	400	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6C 	IMPROVEMENTS TO EXISTING FACILITIES-FY 02	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	XT	 	 	 	 	 	 	 	 	 	 	400	XT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6D 	IMPS TO EXISTING FACIL - NE AIRPORT-FY 01	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	XT	 	 	 	 	 	 	 	 	 	 	400	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6E 	NEW VEHICLE STORAGE/MAINTENANCE BLDG-FY 03	2,300	 	 	 	 	 	 	 	 	 	 	 	2,300	 
 	 	1,725	SB	 	 	 	 	 	 	 	 	 	 	1,725	SB
 	 	575	XT	 	 	 	 	 	 	 	 	 	 	575	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6F 	NEW VEHICLE STORAGE/MAINTENANCE BLDG-FY 02	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	XT	 	 	 	 	 	 	 	 	 	 	200	XT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
6G 	TERMINAL BLDG & PARKING LOT REN-FY 02	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	XT	 	 	 	 	 	 	 	 	 	 	500	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
NORTHEAST PHILADELPHIA AIRPORT	12,701 	 	1,750 	 	2,000 	 	400 	 	400 	 	400 	 	17,651	 
 	 	6,179 	FB	900 	FB	1,350 	FB	 	 	 	 	 	 	8,429	FB
 	 	2,312 	SB	100 	SB	125 	SB	 	 	 	 	 	 	2,537	SB
 	 	775 	XN	750 	XN	525 	XN	400 	XN	400 	XN	400 	XN	3,250	XN
 	 	3,435 	XT	 	 	 	 	 	 	 	 	 	 	3,435	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PHILADELPHIA INTERNATIONAL AIRPORT	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|[RESERVED] 	 		 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
7A 	EMPLOYEE PARKING LOT - EXPANSION-FY 03	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	XT	 	 	 	 	 	 	 	 	 	 	1,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
7B 	EMPLOYEE PARKING LOT - EXPANSION-FY 01	3,000	 	 	 	 	 	 	 	 	 	 	 	3,000	 
 	 	3,000	XR	 	 	 	 	 	 	 	 	 	 	3,000	XR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|109|TERMINAL EXPANSION & MODERNIZATION PROGRAM	27,000 	 	17,000 	 	7,000 	 	7,000 	 	7,000 	 	7,000 	 	72,000	 
 	 	3,500 	PB	3,500 	PB	3,500 	PB	3,500 	PB	3,500 	PB	3,500 	PB	21,000	PB
 	 	23,500 	XN	13,500 	XN	3,500 	XN	3,500 	XN	3,500 	XN	3,500 	XN	51,000	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8A 	AIRPORT SECURITY PROGRAM-FY 04	100,000	 	 	 	 	 	 	 	 	 	 	 	100,000	 
 	 	100,000	XT	 	 	 	 	 	 	 	 	 	 	100,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8B 	AIRPORT SECURITY PROGRAM-FY 03	30,000	 	 	 	 	 	 	 	 	 	 	 	30,000	 
 	 	10,000	FB	 	 	 	 	 	 	 	 	 	 	10,000	FB
 	 	20,000	XT	 	 	 	 	 	 	 	 	 	 	20,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8C 	COMMERCIAL ROADWAY COVERED WALKWAY SYS-FY 02	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	XR	 	 	 	 	 	 	 	 	 	 	1,000	XR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8D 	CONCESSION DEVELOPMENT PROGRAM-FY 98	932	 	 	 	 	 	 	 	 	 	 	 	932	 
 	 	932	XT	 	 	 	 	 	 	 	 	 	 	932	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
8E 	MOVING SIDEWALK - TERMINAL C TO D-FY 01	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	PB	 	 	 	 	 	 	 	 	 	 	400	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8F 	PASSENGER TERMINAL EXPANSION PROGRAM-FY 03	30,000	 	 	 	 	 	 	 	 	 	 	 	30,000	 
 	 	30,000	XT	 	 	 	 	 	 	 	 	 	 	30,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8G 	PASSENGER TERMINAL EXPANSION PROGRAM-FY 02	20,000	 	 	 	 	 	 	 	 	 	 	 	20,000	 
 	 	10,000	PB	 	 	 	 	 	 	 	 	 	 	10,000	PB
 	 	10,000	XT	 	 	 	 	 	 	 	 	 	 	10,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8H 	PASSENGER TERMINAL EXPANSION PROGRAM-FY 01	21,617	 	 	 	 	 	 	 	 	 	 	 	21,617	 
 	 	11,617	PB	 	 	 	 	 	 	 	 	 	 	11,617	PB
 	 	10,000	TB	 	 	 	 	 	 	 	 	 	 	10,000	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8I 	PASSENGER TERMINAL EXPANSION PROGRAM-FY 00	18,000	 	 	 	 	 	 	 	 	 	 	 	18,000	 
 	 	3,574	FB	 	 	 	 	 	 	 	 	 	 	3,574	FB
 	 	10,000	PB	 	 	 	 	 	 	 	 	 	 	10,000	PB
 	 	4,426	XT	 	 	 	 	 	 	 	 	 	 	4,426	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8J 	PASSENGER TERMINAL EXPANSION PROGRAM-FY 99	25,896	 	 	 	 	 	 	 	 	 	 	 	25,896	 
 	 	20,000	FB	 	 	 	 	 	 	 	 	 	 	20,000	FB
 	 	5,896	PB	 	 	 	 	 	 	 	 	 	 	5,896	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8K 	TERMINAL A RENOVATIONS-FY 04	5,000	 	 	 	 	 	 	 	 	 	 	 	5,000	 
 	 	5,000	XT	 	 	 	 	 	 	 	 	 	 	5,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8L 	TERMINAL A - RENOVATIONS-FY 03	4,362	 	 	 	 	 	 	 	 	 	 	 	4,362	 
 	 	4,362	XT	 	 	 	 	 	 	 	 	 	 	4,362	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
8M 	TERMINAL RENOVATIONS AND ADDITIONS-FY 97	3,900	 	 	 	 	 	 	 	 	 	 	 	3,900	 
 	 	3,900	PB	 	 	 	 	 	 	 	 	 	 	3,900	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
|10	9|AIRPORT EXPANSION PROGRAM	6,000 	 	25,700 	 	6,000 	 	4,000 	 	3,300 	 	8,000 	 	53,000	 
 	 	6,000 	XN	25,700 	XN	6,000 	XN	4,000 	XN	3,300 	XN	8,000 	XN	53,000	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9A 	AIRPORT EXPANSION PROGRAM-FY 04	12,000	 	 	 	 	 	 	 	 	 	 	 	12,000	 
 	 	12,000	XT	 	 	 	 	 	 	 	 	 	 	12,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9B 	AIRPORT EXPANSION PROGRAM-FY 03	20,000	 	 	 	 	 	 	 	 	 	 	 	20,000	 
 	 	20,000	XT	 	 	 	 	 	 	 	 	 	 	20,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9C 	AIRPORT LAND ACQUISITION PROGRAM-FY 01	12,600	 	 	 	 	 	 	 	 	 	 	 	12,600	 
 	 	12,600	XR	 	 	 	 	 	 	 	 	 	 	12,600	XR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9D 	AIRPORT EXPANSION PROGRAM-FY 00	105,000	 	 	 	 	 	 	 	 	 	 	 	105,000	 
 	 	105,000	XT	 	 	 	 	 	 	 	 	 	 	105,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9E 	AIRSIDE EXPANSION PROGRAM-FY 95	2,287	 	 	 	 	 	 	 	 	 	 	 	2,287	 
 	 	2,287	XT	 	 	 	 	 	 	 	 	 	 	2,287	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
9F 	PLANNING & DESIGN FOR FUTURE PROJECTS-FY 02	10,000	 	 	 	 	 	 	 	 	 	 	 	10,000	 
 	 	10,000	XT	 	 	 	 	 	 	 	 	 	 	10,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
10	NOISE COMPATIBILITY PROGRAM	3,000 	 	3,000 	 	3,200 	 	3,200 	 	 	 	 	 	12,400	 
 	 	2,400 	FB	2,400 	FB	2,500 	FB	2,500 	FB	 	 	 	 	9,800	FB
 	 	600 	XN	600 	XN	700 	XN	700 	XN	 	 	 	 	2,600	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
10A 	NOISE COMPATIBILITY PROGRAM-FY 04	3,200	 	 	 	 	 	 	 	 	 	 	 	3,200	 
 	 	2,400	FB	 	 	 	 	 	 	 	 	 	 	2,400	FB
 	 	800	XT	 	 	 	 	 	 	 	 	 	 	800	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
11	AIRFIELD CAPACITY ENHANCEMENT PROGRAM	10,000 	 	175,000 	 	175,000 	 	200,000 	 	200,000 	 	200,000 	 	960,000	 
 	 	5,000 	FB	50,000 	FB	50,000 	FB	50,000 	FB	50,000 	FB	50,000 	FB	255,000	FB
 	 	 	 	25,000 	PB	25,000 	PB	25,000 	PB	25,000 	PB	25,000 	PB	125,000	PB
 	 	5,000 	XN	100,000 	XN	100,000 	XN	125,000 	XN	125,000 	XN	125,000 	XN	580,000	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11A 	AIRFIELD CAPACITY ENHANCEMENT PROGRAM-FY 04	18,631	 	 	 	 	 	 	 	 	 	 	 	18,631	 
 	 	13,631	FB	 	 	 	 	 	 	 	 	 	 	13,631	FB
 	 	5,000	XR	 	 	 	 	 	 	 	 	 	 	5,000	XR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11B 	COMMUTER APRON MODIFICATIONS-FY 03	3,200	 	 	 	 	 	 	 	 	 	 	 	3,200	 
 	 	3,200	XT	 	 	 	 	 	 	 	 	 	 	3,200	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11C 	COMMUTER APRON MODIFICATIONS-FY 02	800	 	 	 	 	 	 	 	 	 	 	 	800	 
 	 	800	XT	 	 	 	 	 	 	 	 	 	 	800	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11D 	RECONSTRUCTION OF TERMINAL D-E APRON-FY 04	14,000	 	 	 	 	 	 	 	 	 	 	 	14,000	 
 	 	10,500	FB	 	 	 	 	 	 	 	 	 	 	10,500	FB
 	 	3,500	XT	 	 	 	 	 	 	 	 	 	 	3,500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11E 	RECONSTRUCTION OF TERMINAL D-E APRON-FY 03	3,040	 	 	 	 	 	 	 	 	 	 	 	3,040	 
 	 	2,300	FB	 	 	 	 	 	 	 	 	 	 	2,300	FB
 	 	740	XT	 	 	 	 	 	 	 	 	 	 	740	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11F 	AIRCRAFT APRON RECONSTR - TERM D TO E-FY 02	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	750	FB	 	 	 	 	 	 	 	 	 	 	750	FB
 	 	250	XT	 	 	 	 	 	 	 	 	 	 	250	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11G 	SECURITY CONTROL ACCESS SYS -PHASE 3-FY 99	2,343	 	 	 	 	 	 	 	 	 	 	 	2,343	 
 	 	2,343	PB	 	 	 	 	 	 	 	 	 	 	2,343	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11H 	TAXIWAY J AND CARGO CITY RAMP RECONSTR-FY 04	7,000	 	 	 	 	 	 	 	 	 	 	 	7,000	 
 	 	5,250	FB	 	 	 	 	 	 	 	 	 	 	5,250	FB
 	 	1,750	XT	 	 	 	 	 	 	 	 	 	 	1,750	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
11I 	TAXIWAY J/CARGO CITY RAMP RECONSTR-FY 03	5,000	 	 	 	 	 	 	 	 	 	 	 	5,000	 
 	 	3,750	FB	 	 	 	 	 	 	 	 	 	 	3,750	FB
 	 	1,250	XT	 	 	 	 	 	 	 	 	 	 	1,250	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11J 	TAXIWAY J/CARGO RAMP RECONSTRUCTION-FY 02	1,906	 	 	 	 	 	 	 	 	 	 	 	1,906	 
 	 	1,694	FB	 	 	 	 	 	 	 	 	 	 	1,694	FB
 	 	212	XT	 	 	 	 	 	 	 	 	 	 	212	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
11K 	TAXIWAY J & CARGO CITY RAMP RECONSTR-FY 99	1,314	 	 	 	 	 	 	 	 	 	 	 	1,314	 
 	 	1,110	FB	 	 	 	 	 	 	 	 	 	 	1,110	FB
 	 	204	PB	 	 	 	 	 	 	 	 	 	 	204	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
12	RUNWAY 17-35 EXTENSION	10,000 	 	30,000 	 	 	 	 	 	 	 	 	 	40,000	 
 	 	7,500 	FB	20,000	FB	 	 	 	 	 	 	 	 	27,500	FB
 	 	 	 	5,000	SB	 	 	 	 	 	 	 	 	5,000	SB
 	 	2,500 	XN	5,000 	XN	 	 	 	 	 	 	 	 	7,500	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
12A 	RUNWAY 17-35 EXTENSION-FY 04	3,000	 	 	 	 	 	 	 	 	 	 	 	3,000	 
 	 	1,500	FB	 	 	 	 	 	 	 	 	 	 	1,500	FB
 	 	1,500	XT	 	 	 	 	 	 	 	 	 	 	1,500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
12B 	AIRFIELD RENOVATIONS AND ADDITIONS-FY 03	12,000	 	 	 	 	 	 	 	 	 	 	 	12,000	 
 	 	6,000	FB	 	 	 	 	 	 	 	 	 	 	6,000	FB
 	 	6,000	XT	 	 	 	 	 	 	 	 	 	 	6,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
12C 	AIRFIELD RENOVATIONS AND ADDITIONS-FY 02	2,977	 	 	 	 	 	 	 	 	 	 	 	2,977	 
 	 	2,227	FB	 	 	 	 	 	 	 	 	 	 	2,227	FB
 	 	750	XT	 	 	 	 	 	 	 	 	 	 	750	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
13	RUNWAY 9R/27L RESURFACING	16,000 	 	 	 	 	 	 	 	 	 	 	 	16,000	 
 	 	12,000 	FB	 	 	 	 	 	 	 	 	 	 	12,000	FB
 	 	4,000 	XN	 	 	 	 	 	 	 	 	 	 	4,000	XN
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
13A 	RUNWAY 9R/27L RESURFACING-FY 04	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	750	FB	 	 	 	 	 	 	 	 	 	 	750	FB
 	 	250	XT	 	 	 	 	 	 	 	 	 	 	250	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
13B 	EXTENDED SAFETY AREA - RUNWAY 9R-FY 03	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	750	FB	 	 	 	 	 	 	 	 	 	 	750	FB
 	 	250	XT	 	 	 	 	 	 	 	 	 	 	250	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
13C 	EXTENDED SAFETY AREA - RUNWAY 9R-FY 02	800	 	 	 	 	 	 	 	 	 	 	 	800	 
 	 	800	XT	 	 	 	 	 	 	 	 	 	 	800	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
13D 	EXTENDED SAFETY AREA - RUNWAY 9R-FY 95	1,200	 	 	 	 	 	 	 	 	 	 	 	1,200	 
 	 	975	FB	 	 	 	 	 	 	 	 	 	 	975	FB
 	 	225	XT	 	 	 	 	 	 	 	 	 	 	225	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14	IMPROVEMENTS TO EXISTING FACILITIES	6,000 	 	6,000 	 	6,000 	 	6,000 	 	6,000 	 	6,000 	 	36,000	 
 	 	6,000 	XN	6,000 	XN	6,000 	XN	6,000 	XN	6,000 	XN	6,000 	XN	36,000	XN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14A 	IMPROVEMENTS TO EXISTING FACILITIES-FY 04	6,000	 	 	 	 	 	 	 	 	 	 	 	6,000	 
 	 	6,000	XT	 	 	 	 	 	 	 	 	 	 	6,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14B 	IMPROVEMENTS TO EXISTING FACILITIES-FY 03	12,000	 	 	 	 	 	 	 	 	 	 	 	12,000	 
 	 	12,000	XT	 	 	 	 	 	 	 	 	 	 	12,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14C 	IMPROVEMENTS TO EXISTING FACILITIES-FY 02	6,000	 	 	 	 	 	 	 	 	 	 	 	6,000	 
 	 	6,000	XT	 	 	 	 	 	 	 	 	 	 	6,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14D 	IMPROVEMENTS TO EXISTING FACILITIES-FY 01	5,874	 	 	 	 	 	 	 	 	 	 	 	5,874	 
 	 	5,874	XT	 	 	 	 	 	 	 	 	 	 	5,874	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14E 	IMPROVEMENTS TO EXISTING FACILITIES-FY 98	3,814	 	 	 	 	 	 	 	 	 	 	 	3,814	 
 	 	2,859	XR	 	 	 	 	 	 	 	 	 	 	2,859	XR
 	 	955	XT	 	 	 	 	 	 	 	 	 	 	955	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14F 	ADA COMPLIANCE PROGRAM-FY 02	600	 	 	 	 	 	 	 	 	 	 	 	600	 
 	 	600	XT	 	 	 	 	 	 	 	 	 	 	600	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14G 	AHSL PLATFORM IMPROVEMENTS-FY 98	764	 	 	 	 	 	 	 	 	 	 	 	764	 
 	 	764	PB	 	 	 	 	 	 	 	 	 	 	764	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14H 	AIRCRAFT RESCUE/FIRE FIGHTING FAC EXP-FY 02	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	XT	 	 	 	 	 	 	 	 	 	 	500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14I 	COMMUNICATIONS SYSTEM CABLE UPGRADE-FY 02	3,000	 	 	 	 	 	 	 	 	 	 	 	3,000	 
 	 	3,000	XT	 	 	 	 	 	 	 	 	 	 	3,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14J 	FACILITY MANAGEMENT SYSTEM-FY 04	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	1,500	FB	 	 	 	 	 	 	 	 	 	 	1,500	FB
 	 	500	XT	 	 	 	 	 	 	 	 	 	 	500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14K 	FACILITY MANAGEMENT SYSTEM-FY 03	6,000	 	 	 	 	 	 	 	 	 	 	 	6,000	 
 	3,000	FB	 	 	 	 	 	 	 	 	 	 	3,000	FB
 	 	3,000	XT	 	 	 	 	 	 	 	 	 	 	3,000	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
14L 	FACILITY MANAGEMENT SYSTEM UPGRADE-FY 02	1,060	 	 	 	 	 	 	 	 	 	 	 	1,060	 
 	 	884	FB	 	 	 	 	 	 	 	 	 	 	884	FB
 	 	176	XT	 	 	 	 	 	 	 	 	 	 	176	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15	DOA MAINTENANCE CENTER	 	 	7,200 	 	4,600 	 	14,000 	 	 	 	 	 	25,800	 
 	 	 	 	7,200 	XN	4,600 	XN	14,000 	XN	 	 	 	 	25,800	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15A 	DIVISION OF AVIATION MAINTENANCE CENTER-FY 04	1,500	 	 	 	 	 	 	 	 	 	 	 	1,500	 
 	 	1,500	XT	 	 	 	 	 	 	 	 	 	 	1,500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15B 	DOA MAINTENANCE CENTER-FY 03	1,500	 	 	 	 	 	 	 	 	 	 	 	1,500	 
 	 	1,500	XT	 	 	 	 	 	 	 	 	 	 	1,500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15C 	DOA MAINTENANCE CENTER-FY 02	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	2,000	XT	 	 	 	 	 	 	 	 	 	 	2,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15D 	DOA MAINTENANCE CENTER-FY 99	3,268	 	 	 	 	 	 	 	 	 	 	 	3,268	 
 	 	3,268	XT	 	 	 	 	 	 	 	 	 	 	3,268	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
15E 	DOA MAINTENANCE CENTER-FY 98	4,835	 	 	 	 	 	 	 	 	 	 	 	4,835	 
 	 	4,835	XT	 	 	 	 	 	 	 	 	 	 	4,835	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
16	GROUND TRANSPORTATION CENTER	 	 	 	 	5,000 	 	70,000 	 	 	 	 	 	75,000	 
 	 	 	 	 	 	5,000 	XN	70,000 	XN	 	 	 	 	75,000	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
16A 	GROUND TRANSPORTATION FACILITY IMPS-FY 04	2,500	 	 	 	 	 	 	 	 	 	 	 	2,500	 
 	 	2,500	XT	 	 	 	 	 	 	 	 	 	 	2,500	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
17	AIRPORT ROADWAY SYSTEM MODIFICATIONS	 	 	 	 	15,000 	 	15,000 	 	 	 	 	 	30,000	 
 	 	 	 	 	 	11,250 	FB	11,250 	FB	 	 	 	 	22,500	FB
 	 	 	 	 	 	3,750 	XN	3,750 	XN	 	 	 	 	7,500	XN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
17A 	AIRPORT ROADWAY SIGN LIGHTING-FY 02	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	XR	 	 	 	 	 	 	 	 	 	 	500	XR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
17B 	AIRPORT ROADWAY SYSTEM MODIFICATIONS-FY 99	2,409	 	 	 	 	 	 	 	 	 	 	 	2,409	 
 	 	2,409	PB	 	 	 	 	 	 	 	 	 	 	2,409	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
17C 	PERIMETER ROAD AND FENCE IMPROVEMENTS-FY 03	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	XT	 	 	 	 	 	 	 	 	 	 	1,000	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
17D 	PERIMETER ROAD AND FENCE IMPROVEMENTS-FY 02	1,880	 	 	 	 	 	 	 	 	 	 	 	1,880	 
 	 	978	FB	 	 	 	 	 	 	 	 	 	 	978	FB
 	 	902	XT	 	 	 	 	 	 	 	 	 	 	902	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
18	DIVISION OF AVIATION ADMINISTRATIVE OFFICES	 	 	 	 	 	 	 	 	 	 	12,000 	 	12,000	 
 	 	 	 	 	 	 	 	 	 	 	 	12,000 	XN	12,000	XN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
18A 	EQUIPMENT & VEHICLE ACQUISITION PROG-FY 98	900	 	 	 	 	 	 	 	 	 	 	 	900	 
 	 	900	XT	 	 	 	 	 	 	 	 	 	 	900	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PHILADELPHIA INTERNATIONAL AIRPORT	658,309 	 	263,900 	 	221,800 	 	319,200 	 	216,300 	 	233,000 	 	1,912,509	 
 	 	120,423 	FB	72,400 	FB	63,750 	FB	63,750 	FB	50,000 	FB	50,000 	FB	420,323	FB
 	 	51,033 	PB	28,500 	PB	28,500 	PB	28,500 	PB	28,500 	PB	28,500 	PB	193,533	PB
 	 	 	 	5,000 	SB	 	 	 	 	 	 	 	 	5,000	SB
 	 	10,000 	TB	 	 	 	 	 	 	 	 	 	 	10,000	TB
 	 	47,600 	XN	158,000 	XN	129,550 	XN	226,950 	XN	137,800 	XN	154,500 	XN	854,400	XN
 	 	24,959 	XR	 	 	 	 	 	 	 	 	 	 	24,959	XR
 	 	404,294 	XT	 	 	 	 	 	 	 	 	 	 	404,294	XT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
AVIATION	671,010 	 	265,650 	 	223,800 	 	319,600 	 	216,700 	 	233,400 	 	1,930,160	 
 	 	126,602 	FB	73,300 	FB	65,100 	FB	63,750 	FB	50,000 	FB	50,000 	FB	428,752	FB
 	 	51,033 	PB	28,500 	PB	28,500 	PB	28,500 	PB	28,500 	PB	28,500 	PB	193,533	PB
 	 	2,312 	SB	5,100 	SB	125 	SB	 	 	 	 	 	 	7,537	SB
 	 	10,000 	TB	 	 	 	 	 	 	 	 	 	 	10,000	TB
 	 	48,375 	XN	158,750 	XN	130,075 	XN	227,350 	XN	138,200 	XN	154,900 	XN	857,650	XN
 	 	24,959 	XR	 	 	 	 	 	 	 	 	 	 	24,959	XR
 	 	407,729 	XT	 	 	 	 	 	 	 	 	 	 	407,729	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CAPITAL PROGRAM OFFICE	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROGRAM ADMINISTRATION	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19	CAPITAL PROGRAM ADMINISTRATION DESIGN AND ENGINEERING	6,773 	 	6,455 	 	6,164 	 	5,943 	 	5,943 	 	5,943 	 	37,221		 	6,773 	CN	6,455 	CN	6,164 	CN	5,943 	CN	5,943 	CN	5,943 	CN	37,221	CN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19A 	CPO ADMINISTRATION, DESIGN & ENGINEERING-FY 04	2,846	 	 	 	 	 	 	 	 	 	 	 	2,846	 
 	 	2,846	CT	 	 	 	 	 	 	 	 	 	 	2,846	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19B 	CPO ADMIN, DESIGN & ENGINEERING-FY 03	2,699	 	 	 	 	 	 	 	 	 	 	 	2,699	 
 	 	2,699	CT	 	 	 	 	 	 	 	 	 	 	2,699	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19C 	CPO ADMIN, DESIGN & ENGINEERING-FY 02	1,874	 	 	 	 	 	 	 	 	 	 	 	1,874	 
 	 	1,874	CT	 	 	 	 	 	 	 	 	 	 	1,874	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19D 	CPO ADMIN, DESIGN & ENGINEERING-FY 01	498	 	 	 	 	 	 	 	 	 	 	 	498	 
 	 	498	CT	 	 	 	 	 	 	 	 	 	 	498	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
19E 	CPO ADMIN, DESIGN & ENGINEERING-FY 00	584	 	 	 	 	 	 	 	 	 	 	 	584	 
 	 	584	CT	 	 	 	 	 	 	 	 	 	 	584	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROGRAM ADMINISTRATION	15,274 	 	6,455 	 	6,164 	 	5,943 	 	5,943 	 	5,943 	 	45,722	 
 	 	6,773 	CN	6,455 	CN	6,164 	CN	5,943 	CN	5,943 	CN	5,943 	CN	37,221	CN
 	 	8,501 	CT	 	 	 	 	 	 	 	 	 	 	8,501	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CAPITAL PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
20	CITYWIDE ENVIRONMENTAL REMEDIATION	300 	 	300 	 	300 	 	300 	 	600 	 	300 	 	2,100	 
 	 	300 	CN	300 	CN	300 	CN	300 	CN	600 	CN	300 	CN	2,100	CN
 	 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 
20A 	CITYWIDE ENVIRONMENTAL REMEDIATION-FY 04	366	 	 	 	 	 	 	 	 	 	 	 	366	 
 	 	366	CT	 	 	 	 	 	 	 	 	 	 	366	CT
 	 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 
20B 	CITYWIDE ENVIRONMENTAL REMEDIATION-FY 01	266	 	 	 	 	 	 	 	 	 	 	 	266	 
 	 	266	CT	 	 	 	 	 	 	 	 	 	 	266	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
21	IMPROVEMENTS TO FACILITIES	1,650 	 	1,650 	 	1,650 	 	1,650 	 	1,650 	 	1,650 	 	9,900	 
 	 	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	6,000	CA
 	 	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	3,900	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
21A 	CITYWIDE ACCESSIBILITY MODIFICATIONS-FY 04	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
21B 	ADA-ACCESSIBILITY IMPROVEMENTS-FY 95	16	 	 	 	 	 	 	 	 	 	 	 	16	 
 	 	16	A	 	 	 	 	 	 	 	 	 	 	16	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
21C 	ADA-ACCESSIBILITY IMPROVEMENTS-FY 94	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	A	 	 	 	 	 	 	 	 	 	 	100	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
21D 	RECREATION FACILITIES ASSESSMENT STUDY-FY 04	377	 	 	 	 	 	 	 	 	 	 	 	377	 
 	 	377	CT	 	 	 	 	 	 	 	 	 	 	377	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	3,175 	 	1,950 	 	1,950 	 	1,950 	 	2,250 	 	1,950 	 	13,225	 
 	 	116 	A	 	 	 	 	 	 	 	 	 	 	116	A
 	 	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	6,000	CA
 	 	300 	CN	300 	CN	300 	CN	300 	CN	600 	CN	300 	CN	2,100	CN
 	 	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	3,900	CR
 	 	1,109 	CT	 	 	 	 	 	 	 	 	 	 	1,109	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CAPITAL PROGRAM OFFICE	18,449 	 	8,405 	 	8,114 	 	7,893 	 	8,193 	 	7,893 	 	58,947	 
 	 	116 	A	 	 	 	 	 	 	 	 	 	 	116	A
 	 	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	1,000 	CA	6,000	CA
 	 	7,073 	CN	6,755 	CN	6,464 	CN	6,243 	CN	6,543 	CN	6,243 	CN	39,321	CN
 	 	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	650 	CR	3,900	CR
 	 	9,610 CT	 	 	 			     9,610 CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
COMMERCE	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
COMMERCIAL DEVELOPMENT	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22	NEIGHBORHOOD COMMERCIAL CENTERS - SITE IMPROVEMENTS	2,000 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	12,000	 
 	 	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	6,000	CN
 	 	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	6,000	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22A 	NCC - SITE IMPROVEMENTS-FY 04	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 	 	1,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22B 	NCC - SITE IMPROVEMENTS-FY 03	1,200	 	 	 	 	 	 	 	 	 	 	 	1,200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	1,000	SB	 	 	 	 	 	 	 	 	 	 	1,000	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22C 	NCC - SITE IMPROVEMENTS-FY 02	554	 	 	 	 	 	 	 	 	 	 	 	554	 
 	 	554	CT	 	 	 	 	 	 	 	 	 	 	554	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22D 	NCC - SITE IMPROVEMENTS-FY 01	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 	 	1,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22E 	NCC - SITE IMPROVEMENTS-FY 00	690	 	 	 	 	 	 	 	 	 	 	 	690	 
 	 	690	CT	 	 	 	 	 	 	 	 	 	 	690	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22F 	NEIGHBORHOOD COMMERCIAL CENTERS-FY 99	403	 	 	 	 	 	 	 	 	 	 	 	403	 
 	 	403	CT	 	 	 	 	 	 	 	 	 	 	403	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22G 	AVENUE OF THE ARTS-FY 04	40	 	 	 	 	 	 	 	 	 	 	 	40	 
 	 	40	CT	 	 	 	 	 	 	 	 	 	 	40	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22H 	AVENUE OF THE ARTS - N. BROAD STREET-FY 03	3,150	 	 	 	 	 	 	 	 	 	 	 	3,150	 
 	 	3,150	SB	 	 	 	 	 	 	 	 	 	 	3,150	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22I 	AVENUE OF THE ARTS - N & S BROAD ST-FY 01	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22J 	AVENUE OF THE ARTS - N & S BROAD ST-FY 00	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 	 	1,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22K 	AVENUE OF THE ARTS - N & S BROAD ST-FY 99	2,332	 	 	 	 	 	 	 	 	 	 	 	2,332	 
 	 	332	CT	 	 	 	 	 	 	 	 	 	 	332	CT
 	 	2,000	TB	 	 	 	 	 	 	 	 	 	 	2,000	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22L 	CONVENTION CENTER AREA RENEWAL-FY 00	1,701	 	 	 	 	 	 	 	 	 	 	 	1,701	 
 	 	1,701	CT	 	 	 	 	 	 	 	 	 	 	1,701	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22M 	CONVENTION CENTER AREA - RENEWAL-FY 99	298	 	 	 	 	 	 	 	 	 	 	 	298	 
 	 	298	CT	 	 	 	 	 	 	 	 	 	 	298	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22N 	CONVENTION CENTER AREA-IMPROVEMENTS-FY 98	478	 	 	 	 	 	 	 	 	 	 	 	478	 
 	 	478	CT	 	 	 	 	 	 	 	 	 	 	478	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22O 	CONVENTION CENTER AREA-IMPROVEMENTS-FY 96	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
22P 	CONVENTION CENTER EXPANSION-FY 04	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	2,000	CT	 	 	 	 	 	 	 	 	 	 	2,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
COMMERCIAL DEVELOPMENT	18,846 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	28,846	 
 	 	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	6,000	CN
 	 	10,696 	CT	 	 	 	 	 	 	 	 	 	 	10,696	CT
 	 	5,150 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	10,150	SB
 	 	2,000 	TB	 	 	 	 	 	 	 	 	 	 	2,000	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
INDUSTRIAL DEVELOPMENT	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
23	ENVIRONMENTAL ASSESSMENT/REMEDIATION	 	 	1,700 	 	 	 	1,700 	 	 	 	1,700 	 	5,100	 
 	 	 	 	200 	CN	 	 	200 	CN	 	 	200 	CN	600	CN
 	 	 	 	500 	FB	 	 	500 	FB	 	 	500 	FB	1,500	FB
 	 	 	 	1,000 	SB	 	 	1,000 	SB	 	 	1,000 	SB	3,000	SB
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
23A 	ENVIRONMENTAL ASSESSMENT/REMEDIATION-FY 00|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24	NEIGHBORHOOD INDUSTRIAL DISTRICTS	 	 	300 	 	 	 	300 	 	 	 	300 	 	900	 
 	 	 	 	150 	CN	 	 	150 	CN	 	 	150 	CN	450	CN
 	 	 	 	150 	SB	 	 	150 	SB	 	 	150 	SB	450	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24A 	ENTERPRISE AND EMPOWERMENT ZONE IMPS-FY 04	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24B 	NEIGHBORHOOD INDUST DISTS - IMPS & ADMIN-FY 04	150	 	 	 	 	 	 	 	 	 	 	 	150	 
 	 	150	CT	 	 	 	 	 	 	 	 	 	 	150	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24C 	NEIGHBORHOOD IND DISTS - IMPS & ADMIN-FY 02	50	 	 	 	 	 	 	 	 	 	 	 	50	 
 	 	50	CT	 	 	 	 	 	 	 	 	 	 	50	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24D 	NEIGHBORHOOD INDUSTRIAL DISTS - IMPS-FY 00	271	 	 	 	 	 	 	 	 	 	 	 	271	 
 	 	271	CT	 	 	 	 	 	 	 	 	 	 	271	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
24E 	RICHMOND IND AREA - PARKING LOT DEVEL-FY 01	800	 	 	 	 	 	 	 	 	 	 	 	800	 
 	 	800	CT	 	 	 	 	 	 	 	 	 	 	800	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
25	PIDC LANDBANK ACQUISITION & IMPROVEMENTS	11,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	16,000	 
 	 	11,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	16,000	Z
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
25A 	MEETINGHOUSE ROAD/MCNULTY ROAD - IMPS-FY 01	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
25B 	PIDC - LAND ACQUISITION AND IMPS-FY 02	3,700	 	 	 	 	 	 	 	 	 	 	 	3,700	 
 	 	3,700	CT	 	 	 	 	 	 	 	 	 	 	3,700	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
26	WEST PARKSIDE UTILITY RELOCATIONS AND IMPROVEMENTS	225 	 	 	 	 	 	 	 	 	 	 	 	225	 
 	 	225 	CN	 	 	 	 	 	 	 	 	 	 	225 CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27	GRADING AND PAVING - NEW AND EXISTING STREETS	250 	 	 	 	250 	 	 	 	250 	 	 	 	750	 
 	 	250 	CN	 	 	250 	CN	 	 	250 	CN	 	 	750	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27A 	GRADING & PAVING - NEW/EXISTING STS-FY 03	38	 	 	 	 	 	 	 	 	 	 	 	38	 
 	 	38	CT	 	 	 	 	 	 	 	 	 	 	38	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27B 	FOOD DISTRIBUTION CENTER - IMPS-FY 02	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 	 	1,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27C 	INFRASTRUCTURE DEVELOPMENT- EDA MATCH-FY 02	600	 	 	 	 	 	 	 	 	 	 	 	600	 
 	 	600	CT	 	 	 	 	 	 	 	 	 	 	600	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27D 	PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 01	1,307	 	 	 	 	 	 	 	 	 	 	 	1,307	 
 	 	1,307	CT	 	 	 	 	 	 	 	 	 	 	1,307	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
27E 	PHILA AUTO MALL - STREETSCAPE IMPS-FY 00	1,449	 	 	 	 	 	 	 	 	 	 	 	1,449	 
 	 	1,449	CT	 	 	 	 	 	 	 	 	 	 	1,449	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
28	PIDC LANDBANK IMPROVEMENTS, ENGINEERING
AND ADMINISTRATION	5,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	10,000	 
 	 	5,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	1,000 	Z	10,000	Z
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
28A 	BYBERRY REUSE PLAN-FY 01	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
28B 	BYBERRY REUSE PLAN-FY 99	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
INDUSTRIAL DEVELOPMENT	26,744 	 	4,000 	 	2,250 	 	4,000 	 	2,250 	 	4,000 	 	43,244	 	 	475 	CN	350 	CN	250 	CN	350 	CN	250 	CN	350 	CN	2,025	CN
 	 	10,269 	CT	 	 	 	 	 	 	 	 	 	 	10,269	CT
 	 	 	 	500 	FB	 	 	500 	FB	 	 	500 	FB	1,500	FB
 	 	 	 	1,150 	SB	 	 	1,150 	SB	 	 	1,150 	SB	3,450	SB
 	 	16,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	26,000	Z
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PENN'S LANDING / WATERFRONT IMPS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
29	PENN'S LANDING IMPROVEMENTS	500 	 	350 	 	100 	 	250 	 	 	 	250 	 	1,450	 
 	 	500 	CN	350 	CN	100 	CN	250 	CN	 	 	250 	CN	1,450	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
30	SCHUYLKILL RIVER TRAIL IMPROVEMENTS	500 	 	500 	 	500 	 	500 	 	500 	 	500 	 	3,000	 
 	 	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	1,500	CN
 	 	250 	SB	250 	SB	250 	SB	250 	SB	250 	SB	250 	SB	1,500	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
30A 	CONSERVATION OF ART-FY 02	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
30B 	CONSERVATION OF ART-FY 00	414	 	 	 	 	 	 	 	 	 	 	 	414	 
 	 	414	CT	 	 	 	 	 	 	 	 	 	 	414	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
30C 	CONSERVATION OF ART-FY 99|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
30D 	CONSERVATION OF ART-FY 98	41	 	 	 	 	 	 	 	 	 	 	 	41	 
 	 	41	CT	 	 	 	 	 	 	 	 	 	 	41	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PENN'S LANDING / WATERFRONT IMPS	1,759 	 	850 	 	600 	 	750 	 	500 	 	750 	 	5,209	 
 	 	750 	CN	600 	CN	350 	CN	500 	CN	250 	CN	500 	CN	2,950	CN
 	 	759 	CT	 	 	 	 	 	 	 	 	 	 	759	CT
 	 	250 	SB	250 	SB	250 	SB	250 	SB	250 	SB	250 	SB	1,500	SB
COMMERCE	47,349 	 	6,850 	 	4,850 	 	6,750 	 	4,750 	 	6,750 	 	77,299	 
 	 	2,225 	CN	1,950 	CN	1,600 	CN	1,850 	CN	1,500 	CN	1,850 	CN	10,975	CN
 	 	21,724 	CT	 	 	 	 	 	 	 	 	 	 	21,724	CT
 	 	 	 	500 	FB	 	 	500 	FB	 	 	500 	FB	1,500	FB
 	 	5,400 	SB	2,400 	SB	1,250 	SB	2,400 	SB	1,250 	SB	2,400 	SB	15,100	SB
 	 	2,000 	TB	 	 	 	 	 	 	 	 	 	 	2,000	TB
 	 	16,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	2,000 	Z	26,000	Z
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
EMERGENCY SHELTER AND SERVICES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FAMILY CARE FACILITIES - CAPITAL	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
31	OESS FACILITY RENOVATIONS	235 	 	200 	 	400 	 	450 	 	450 	 	400 	 	2,135	 
 	 	235 	CN	200 	CN	400 	CN	450 	CN	450 	CN	400 	CN	2,135	CN
	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
31A 	OESS FACILITY RENOVATIONS-FY 04	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
31B 	OESS RENOVATIONS-FY 03	551	 	 	 	 	 	 	 	 	 	 	 	551	 
 	 	551	CT	 	 	 	 	 	 	 	 	 	 	551	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
31C 	OESS RENOVATIONS-FY 02	292	 	 	 	 	 	 	 	 	 	 	 	292	 
 	 	292	CT	 	 	 	 	 	 	 	 	 	 	292	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
31D 	GATEWAY SHELTER FACILITY-ACQUISITION-FY 95	17	 	 	 	 	 	 	 	 	 	 	 	17	 
 	 	17	CT	 	 	 	 	 	 	 	 	 	 	17	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FAMILY CARE FACILITIES - CAPITAL	1,595 	 	200 	 	400 	 	450 	 	450 	 	400 	 	3,495	 
 	 	235 	CN	200 	CN	400 	CN	450 	CN	450 	CN	400 	CN	2,135	CN
 	 	1,360 	CT	 	 	 	 	 	 	 	 	 	 	1,360	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
EMERGENCY SHELTER AND SERVICES	1,595 	 	200 	 	400 	 	450 	 	450 	 	400 	 	3,495	 
 	 	235 	CN	200 	CN	400 	CN	450 	CN	450 	CN	400 	CN	2,135	CN
 	 	1,360 	CT	 	 	 	 	 	 	 	 	 	 	1,360	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FAIRMOUNT PARK COMMISSION	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FAIRMOUNT PARK - CAPITAL	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
32	ATHLETIC AND PLAY AREA IMPROVEMENTS	525 	 	250 	 	200 	 	200 	 	200 	 	200 	 	1,575	 
 	 	525 	CN	250 	CN	200 	CN	200 	CN	200 	CN	200 	CN	1,575	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
32A 	ATHLETIC AND PLAY AREA IMPROVEMENTS-FY 04	120	 	 	 	 	 	 	 	 	 	 	 	120	 
 	 	120	CT	 	 	 	 	 	 	 	 	 	 	120	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
32B 	ATHLETIC & PLAY AREA IMPROVEMENTS-FY 02	16	 	 	 	 	 	 	 	 	 	 	 	16	 
 	 	16	CT	 	 	 	 	 	 	 	 	 	 	16	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
32C 	ATHLETIC AND PLAY AREA IMPROVEMENTS-FY 01	181	 	 	 	 	 	 	 	 	 	 	 	181	 
 	 	181	CT	 	 	 	 	 	 	 	 	 	 	181	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33	BUILDING IMPROVEMENTS	900 	 	320 	 	420 	 	375 	 	350 	 	350 	 	2,715	 
 	 	900 	CN	320 	CN	420 	CN	375 	CN	350 	CN	350 	CN	2,715	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33A 	BUILDING IMPROVEMENTS-FY 04	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33B 	BUILDING IMPROVEMENTS-FY 03	255	 	 	 	 	 	 	 	 	 	 	 	255	 
 	 	255	CT	 	 	 	 	 	 	 	 	 	 	255	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33C 	BUILDING IMPROVEMENTS-FY 02	59	 	 	 	 	 	 	 	 	 	 	 	59	 
 	 	59	CT	 	 	 	 	 	 	 	 	 	 	59	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33D 	BUILDING IMPROVEMENTS-FY 00|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
33E 	BUILDING IMPROVEMENTS-FY 99|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
34	FACILITY IMPROVEMENTS	1,968 	 	315 	 	675 	 	385 	 	500 	 	425 	 	4,268	 
 	 	868 	CN	315 	CN	675 	CN	385 	CN	500 	CN	425 	CN	3,168	CN
 	 	700 	PB	 	 	 	 	 	 	 	 	 	 	700	PB
 	 	400 	SB	 	 	 	 	 	 	 	 	 	 	400	SB
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34A 	FACILITY IMPROVEMENTS-FY 04	1,250	 	 	 	 	 	 	 	 	 	 	 	1,250	 
 	 	900	CT	 	 	 	 	 	 	 	 	 	 	900	CT
 	 	350	SB	 	 	 	 	 	 	 	 	 	 	350	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34B 	FACILITY IMPROVEMENTS-FY 03	1,200	 	 	 	 	 	 	 	 	 	 	 	1,200	 
 	 	400	CT	 	 	 	 	 	 	 	 	 	 	400	CT
 	 	400	FB	 	 	 	 	 	 	 	 	 	 	400	FB
 	 	400	SB	 	 	 	 	 	 	 	 	 	 	400	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34C 	FACILITY IMPROVEMENTS-FY 02|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34D 	FACILITY IMPROVEMENTS-FY 01	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	SB	 	 	 	 	 	 	 	 	 	 	400	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34E 	PARKWIDE FACILITIES IMPROVEMENTS-FY 00	133	 	 	 	 	 	 	 	 	 	 	 	133	 
 	 	33	CT	 	 	 	 	 	 	 	 	 	 	33	CT
 	 	100	PB	 	 	 	 	 	 	 	 	 	 	100	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34F 	PARKWIDE FACILITIES IMPROVEMENTS-FY 99	161	 	 	 	 	 	 	 	 	 	 	 	161	 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	160	PB	 	 	 	 	 	 	 	 	 	 	160	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34G 	CAPITAL PROGRAM ADMINISTRATION-FY 98	69	 	 	 	 	 	 	 	 	 	 	 	69	 
 	 	69	CT	 	 	 	 	 	 	 	 	 	 	69	CT
 	 		 	 	 	 	 	 	 	 	 	 	
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
34H 	CAPITAL PROGRAM ADMINISTRATION-FY 96|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
34I	PARK CULTURAL AND EDUCATIONAL FACILITIES-FY 97	39												39	
		39	PB											39	PB
35	HISTORIC BUILDING IMPROVEMENTS	700 	 	1,800	 	255 	 	580 	 	550 	 	300 		4,185 
 	 	700 	CN	1,800	CN	255 	CN	580 	CN	550 	CN	300 	CN	4,185 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
35A 	HISTORIC BUILDING IMPROVEMENTS-FY 04	750	 	 	 	 	 	 	 	 	 	 	 	750	 
 	 	750	CT	 	 	 	 	 	 	 	 	 	 	750	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
35B 	HISTORIC BUILDING IMPROVEMENTS-FY 03	1,311	 	 	 	 	 	 	 	 	 	 	 	1,311	 
 	 	1,311	CT	 	 	 	 	 	 	 	 	 	 	1,311	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
35C 	HISTORIC BUILDINGS - IMPROVEMENTS-FY 02	180	 	 	 	 	 	 	 	 	 	 	 	180	 
 	 	180	CT	 	 	 	 	 	 	 	 	 	 	180	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
35D 	HISTORIC BUILDING IMPROVEMENTS-FY 01	1,216	 	 	 	 	 	 	 	 	 	 	 	1,216	 
 	 	736	CT	 	 	 	 	 	 	 	 	 	 	736	CT
 	 	480	FB	 	 	 	 	 	 	 	 	 	 	480	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
35E 	HISTORIC BUILDING IMPROVEMENTS-FY 00	553	 	 	 	 	 	 	 	 	 	 	 	553	 
 	 	255	CT	 	 	 	 	 	 	 	 	 	 	255	CT
 	 	174	PB	 	 	 	 	 	 	 	 	 	 	174	PB
 	 	124	SB	 	 	 	 	 	 	 	 	 	 	124	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
36	PARK AND STREET TREES	300 	 	300 	 	300 	 	300 	 	300 	 	300 	 	1,800	 
 	 	300 	CN	300 	CN	300 	CN	300 	CN	300 	CN	300 	CN	1,800	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
36A 	PARK AND STREET TREES-FY 04	204	 	 	 	 	 	 	 	 	 	 	 	204	 
 	 	204	CT	 	 	 	 	 	 	 	 	 	 	204	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
36B 	PARK AND STREET TREES-FY 03	41	 	 	 	 	 	 	 	 	 	 	 	41	 
 	 	41	CT	 	 	 	 	 	 	 	 	 	 	41	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
37	PARKLAND - SITE IMPROVEMENTS	3,140 	 	100 	 	700 	 	710 	 	650 	 	700 	 	6,000	 
 	 	1,350 	CN	100 	CN	700 	CN	710 	CN	650 	CN	700 	CN	4,210	CN
 	 	1,790 	FB	 	 	 	 	 	 	 	 	 	 	1,790	FB
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37A 	PARKLAND - SITE IMPROVEMENTS-FY 04	331	 	 	 	 	 	 	 	 	 	 	 	331	 
 	 	331	CT	 	 	 	 	 	 	 	 	 	 	331	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37B 	PARKLAND - SITE IMPROVEMENTS-FY 02	2,337	 	 	 	 	 	 	 	 	 	 	 	2,337	 
 	 	736	CT	 	 	 	 	 	 	 	 	 	 	736	CT
 	 	85	FB	 	 	 	 	 	 	 	 	 	 	85	FB
 	 	1,516	SB	 	 	 	 	 	 	 	 	 	 	1,516	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37C 	PARKLAND - SITE IMPROVEMENTS-FY 01	44	 	 	 	 	 	 	 	 	 	 	 	44	 
 	 	44	CT	 	 	 	 	 	 	 	 	 	 	44	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37D 	PARKLAND - SITE IMPROVEMENTS-FY 00	160	 	 	 	 	 	 	 	 	 	 	 	160	 
 	 	160	SB	 	 	 	 	 	 	 	 	 	 	160	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37E 	PARKLAND - SITE IMPROVEMENTS-FY 99	25	 	 	 	 	 	 	 	 	 	 	 	25	 
 	 	25	SB	 	 	 	 	 	 	 	 	 	 	25	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37F 	PARKLAND - SITE IMPROVEMENTS-FY 97	80	 	 	 	 	 	 	 	 	 	 	 	80	 
 	 	80	FB	 	 	 	 	 	 	 	 	 	 	80	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37G 	HISTORIC SQUARE IMPROVEMENTS-FY 00	27	 	 	 	 	 	 	 	 	 	 	 	27	 
 	 	27	CT	 	 	 	 	 	 	 	 	 	 	27	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37H 	HISTORIC SQUARE IMPROVEMENTS-FY 99|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
37I 	MANAYUNK CANAL IMPROVEMENTS-FY 01	381	 	 	 	 	 	 	 	 	 	 	 	381	 
 	 	381	SB	 	 	 	 	 	 	 	 	 	 	381	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37J 	MANAYUNK CANAL RESTORATION-FY 00	2,681	 	 	 	 	 	 	 	 	 	 	 	2,681	 
 	 	441	A	 	 	 	 	 	 	 	 	 	 	441	A
 	 	2,240	SB	 	 	 	 	 	 	 	 	 	 	2,240	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37K 	MANAYUNK RECREATION PATH-FY 00	824	 	 	 	 	 	 	 	 	 	 	 	824	 
 	 	24	CT	 	 	 	 	 	 	 	 	 	 	24	CT
 	 	800	SB	 	 	 	 	 	 	 	 	 	 	800	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37L 	ISTEA GRANT-MANAYUNK CANAL PATHWAY-FY 94	776	 	 	 	 	 	 	 	 	 	 	 	776	 
 	 	776	FB	 	 	 	 	 	 	 	 	 	 	776	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37M 	PARKSIDE IMPS - GROWING GREENER GRANT-FY 03	971	 	 	 	 	 	 	 	 	 	 	 	971	 
 	 	296	CT	 	 	 	 	 	 	 	 	 	 	296	CT
 	 	675	SB	 	 	 	 	 	 	 	 	 	 	675	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37N 	PARKSIDE IMPROVEMENTS-FY 02	1,529	 	 	 	 	 	 	 	 	 	 	 	1,529	 
 	 	444	CT	 	 	 	 	 	 	 	 	 	 	444	CT
 	 	1,085	SB	 	 	 	 	 	 	 	 	 	 	1,085	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37O 	SCHUYLKILL RIVER PARK-FY 99	109	 	 	 	 	 	 	 	 	 	 	 	109	 
 	 	109	SB	 	 	 	 	 	 	 	 	 	 	109	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
37P 	WASHINGTON MONUMENT RESTORATION-FY 98	11	 	 	 	 	 	 	 	 	 	 	 	11	 
 	 	11	CT	 	 	 	 	 	 	 	 	 	 	11	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
38	ROADWAYS, FOOTWAYS, AND PARKING	250 	 	250 	 	250 	 	250 	 	250 	 	250 	 	1,500	 
 	 	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	1,500 CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
38A 	ROADWAYS, FOOTWAYS, AND PARKING-FY 04	380	 	 	 	 	 	 	 	 	 	 	 	380	 
 	 	380	CT	 	 	 	 	 	 	 	 	 	 	380	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
38B 	ROADWAYS, FOOTWAYS AND PARKING-FY 03	81	 	 	 	 	 	 	 	 	 	 	 	81	 
 	 	81	CT	 	 	 	 	 	 	 	 	 	 	81	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
38C 	COBBS CREEK RECREATION PATH-FY 00	440	 	 	 	 	 	 	 	 	 	 	 	440	 
 	 	440	CT	 	 	 	 	 	 	 	 	 	 	440	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
38D 	COBBS CREEK RECREATION PATH-FY 98	1,261	 	 	 	 	 	 	 	 	 	 	 	1,261	 
 	 	1,261	FB	 	 	 	 	 	 	 	 	 	 	1,261	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FAIRMOUNT PARK - CAPITAL	28,893 	 	3,335 	 	2,800 	 	2,800 	 	2,800 	 	2,525 	 	43,153 
 	 	441 	A	 	 	 	 	 	 	 	 	 	 	441 A
 	 	4,893 	CN	3,335 	CN	2,800 	CN	2,800 	CN	2,800 	CN	2,525 	CN	19,153	CN
 	 	8,849 	CT	 	 	 	 	 	 	 	 	 	 	8,849	CT
 	 	4,872 	FB	 	 	 	 	 	 	 	 	 	 	4,872	FB
 	 	1,173 	PB	 	 	 	 	 	 	 	 	 	 	1,173	PB
 	 	8,665 	SB	 	 	 	 	 	 	 	 	 	 	8,665	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FAIRMOUNT PARK COMMISSION	28,893 	 	3,335 	 	2,800 	 	2,800 	 	2,800 	 	2,525 	 	43,153	 
 	 	441 	A	 	 	 	 	 	 	 	 	 	 	441	A
 	 	4,893 	CN	3,335 	CN	2,800 	CN	2,800 	CN	2,800 	CN	2,525 	CN	19,153	CN
 	 	8,849 	CT	 	 	 	 	 	 	 	 	 	 	8,849	CT
 	 	4,872 	FB	 	 	 	 	 	 	 	 	 	 	4,872	FB
 	 	1,173 	PB	 	 	 	 	 	 	 	 	 	 	1,173	PB
 	 	8,665 	SB	 	 	 	 	 	 	 	 	 	 	8,665	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FINANCE	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
38Z	NEW VOTING MACHINES - FY 01	56 	 											56	 
 	 	56 	CT											56	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	56 	 											56	 
 	 	56 	CT	 	 	 	 	 	 	 	 	 	 	56	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FINANCE	56 	 	 	 	 	 	 	 	 	 	 	 	56	 
 	 	56 	CT	 	 	 	 	 	 	 	 	 	 	56	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FIRE	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FIRE FACILITIES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39	FIRE DEPARTMENT COMPUTER SYSTEM IMPROVEMENTS	50 	 	 	 	700 	 	700 	 	700 	 	700 	 	2,850	 
 	 	 	 	 	 	700 	CN	 	 	 	 	 	 	700	CN
 	 	50 	CR	 	 	 	 	700 	CR	700 	CR	700 	CR	2,150	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39A 	FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 04	375	 	 	 	 	 	 	 	 	 	 	 	375	 
 	 	375	CR	 	 	 	 	 	 	 	 	 	 	375	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39B 	FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 03	925	 	 	 	 	 	 	 	 	 	 	 	925	 
 	 	925	CR	 	 	 	 	 	 	 	 	 	 	925	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39C 	FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 02	252	 	 	 	 	 	 	 	 	 	 	 	252	 
 	 	252	CT	 	 	 	 	 	 	 	 	 	 	252	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39D 	FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 01	140	 	 	 	 	 	 	 	 	 	 	 	140	 
 	 	140	CT	 	 	 	 	 	 	 	 	 	 	140	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
39E 	COMPUTER AIDED DISPATCH SYS UPGRADE-FY 95	121	 	 	 	 	 	 	 	 	 	 	 	121	 
 	 	121	CR	 	 	 	 	 	 	 	 	 	 	121	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40	FIRE DEPARTMENT INTERIOR AND EXTERIOR RENOVATIONS	1,400 	 	1,450 	 	1,150 	 	800 	 	800 	 	800 	 	6,400	 
 	 	650 	CN	1,450 	CN	1,150 	CN	800 	CN	800 	CN	800 	CN	5,650	CN
 	 	750 	FB	 	 	 	 	 	 	 	 	 	 	750	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40A 	FIRE DEPT INTERIOR/EXTERIOR RENOVATIONS-FY 04	3,361	 	 	 	 	 	 	 	 	 	 	 	3,361	 
 	 	1,361	CT	 	 	 	 	 	 	 	 	 	 	1,361	CT
		2,000	FB											2,000	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40B 	FIRE DEPT INTERIOR/EXTERIOR RENOV-FY 03	353	 	 	 	 	 	 	 	 	 	 	 	353	 
 	 	353	CT	 	 	 	 	 	 	 	 	 	 	353	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
40C 	FIRE DEPT INTERIOR/EXTERIOR RENOV-FY 02	514	 	 	 	 	 	 	 	 	 	 	 	514	 
 	 	514	CT	 	 	 	 	 	 	 	 	 	 	514	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40D 	FIRE DEPARTMENT INTERIOR RENOVATIONS-FY 01|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40E 	FIRE FACIL - EXPANSION/RECONSTRUCTION-FY 00	290	 	 	 	 	 	 	 	 	 	 	 	290	 
 	 	290	CT	 	 	 	 	 	 	 	 	 	 	290	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40F 	FIRE FACILITIES -CRITICAL RENOVATIONS-FY 99	89	 	 	 	 	 	 	 	 	 	 	 	89	 
 	 	89	CT	 	 	 	 	 	 	 	 	 	 	89	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40G 	N PHILA FIRE FACIL-ASSESSMENT/DESIGN-FY 99	80	 	 	 	 	 	 	 	 	 	 	 	80	 
 	 	80	CT	 	 	 	 	 	 	 	 	 	 	80	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40H 	FIRE DEPARTMENT ROOF REPLACEMENTS-FY 01	13	 	 	 	 	 	 	 	 	 	 	 	13	 
 	 	13	CT	 	 	 	 	 	 	 	 	 	 	13	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
40I 	ROOF REPLACEMENTS-FY 00|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FIRE FACILITIES	7,975 	 	1,450 	 	1,850 	 	1,500 	 	1,500 	 	1,500 	 	15,775	 
 	 	650 	CN	1,450 	CN	1,850 	CN	800 	CN	800 	CN	800 	CN	6,350	CN
 	 	1,471 	CR	 	 	 	 	700 	CR	700 	CR	700 	CR	3,571	CR
 	 	3,104 	CT	 	 	 	 	 	 	 	 	 	 	3,104	CT
 	 	2,750 	FB	 	 	 	 	 	 	 	 	 	 	2,750	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
FIRE	 	7,975 	 	1,450 	 	1,850 	 	1,500 	 	1,500 	 	1,500 	 	15,775	 
 	 	650 	CN	1,450 	CN	1,850 	CN	800 	CN	800 	CN	800 	CN	6,350	CN
 	 	1,471 	CR	 	 	 	 	700 	CR	700 	CR	700 	CR	3,571	CR
 	 	3,104 	CT	 	 	 	 	 	 	 	 	 	 	3,104	CT
 	 	2,750 	FB	 	 	 	 	 	 	 	 	 	 	2,750	FB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FLEET MANAGEMENT	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41	FLEET MANAGEMENT FACILITIES	550 	 	330 	 	150 	 	150 	 	150 	 	150 	 	1,480	 
 	 	550 	CN	330 	CN	150 	CN	150 	CN	150 	CN	150 	CN	1,480	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41A 	FLEET MANAGEMENT FACILITIES-FY 04	23	 	 	 	 	 	 	 	 	 	 	 	23	 
 	 	23	CT	 	 	 	 	 	 	 	 	 	 	23	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41B 	RENOVATIONS - FLEET MANAGEMENT SHOPS-FY 01|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41C 	RENOVATIONS - FLEET MANAGEMENT SHOPS-FY 99|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41D 	FLEET MANAGEMENT FACILITIES IMPS-FY 98	39	 	 	 	 	 	 	 	 	 	 	 	39	 
 	 	39	CT	 	 	 	 	 	 	 	 	 	 	39	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
41E	FIRE BOAT REPLACEMENT-FY 01	203	 	 	 	 	 	 	 	 	 	 	 	203	 
 	 	203	CT	 	 	 	 	 	 	 	 	 	 	203	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
42	FUEL TANK REPLACEMENT	600 	 	600 	 	600 	 	600 	 	600 	 	600 	 	3,600	 
 	 	200 	CN	200 	CN	200 	CN	200 	CN	200 	CN	200 	CN	1,200	CN
 	 	400 	SB	400 	SB	400 	SB	400 	SB	400 	SB	400 	SB	2,400	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
42A 	FUEL TANK REPLACEMENT-FY 04	550	 	 	 	 	 	 	 	 	 	 	 	550	 
 	 	150	CT	 	 	 	 	 	 	 	 	 	 	150	CT
 	 	400	SB	 	 	 	 	 	 	 	 	 	 	400	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	1,978 	 	930 	 	750 	 	750 	 	750 	 	750 	 	5,908	 
 	 	750 	CN	530 	CN	350 	CN	350 	CN	350 	CN	350 	CN	2,680	CN
 	 	428 	CT	 	 	 	 	 	 	 	 	 	 	428	CT
 	 	800 	SB	400 	SB	400 	SB	400 	SB	400 	SB	400 	SB	2,800	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FLEET MANAGEMENT	1,978 	 	930 	 	750 	 	750 	 	750 	 	750 	 	5,908	 
 	 	750 	CN	530 	CN	350 	CN	350 	CN	350 	CN	350 	CN	2,680	CN
 	 	428 	CT	 	 	 	 	 	 	 	 	 	 	428	CT
 	 	800 	SB	400 	SB	400 	SB	400 	SB	400 	SB	400 	SB	2,800	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FREE LIBRARY	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
LIBRARY FACILITIES - CAPITAL 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43	BRANCH LIBRARIES - IMPROVEMENTS	900 	 	600 	 	550 	 	550 	 	450 	 	450 	 	3,500	 
 	 	900 	CN	600 	CN	550 	CN	550 	CN	450 	CN	450 	CN	3,500	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43A 	BRANCH LIBRARY IMPROVEMENTS-FY 04	411	 	 	 	 	 	 	 	 	 	 	 	411	 
 	 	411	CT	 	 	 	 	 	 	 	 	 	 	411	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43B 	BRANCH LIBRARIES - IMPROVEMENTS-FY 03	75	 	 	 	 	 	 	 	 	 	 	 	75	 
 	 	75	CT	 	 	 	 	 	 	 	 	 	 	75	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43C 	BRANCH LIBRARIES - IMPROVEMENTS-FY 02	26	 	 	 	 	 	 	 	 	 	 	 	26	 
 	 	26	CT	 	 	 	 	 	 	 	 	 	 	26	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43D 	BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 04	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43E 	BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 03	583	 	 	 	 	 	 	 	 	 	 	 	583	 
 	 	66	CT	 	 	 	 	 	 	 	 	 	 	66	CT
 	 	154	PB	 	 	 	 	 	 	 	 	 	 	154	PB
 	 	363	SB	 	 	 	 	 	 	 	 	 	 	363	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43F 	BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 02	692	 	 	 	 	 	 	 	 	 	 	 	692	 
 	 	692	CT	 	 	 	 	 	 	 	 	 	 	692	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43G 	BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 01	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43H 	BRANCH LIBRARY RENOVATIONS/IMPS-FY 00	119	 	 	 	 	 	 	 	 	 	 	 	119	 
 	 	119	CT	 	 	 	 	 	 	 	 	 	 	119	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
43I 	BRANCH REPLACEMENT AND RECONSTRUCTION-FY 04	301	 	 	 	 	 	 	 	 	 	 	 	301	 
 	 	301	CT	 	 	 	 	 	 	 	 	 	 	301	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43J 	BRANCH REPLACEMENT AND RECONSTRUCTION-FY 03	30	 	 	 	 	 	 	 	 	 	 	 	30	 
 	 	30	CT	 	 	 	 	 	 	 	 	 	 	30	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
43K 	BRANCH REPLACEMENT AND RECONSTRUCTION-FY 02	14	 	 	 	 	 	 	 	 	 	 	 	14	 
 	 	14	CT	 	 	 	 	 	 	 	 	 	 	14	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
44	CENTRAL LIBRARY RENOVATIONS	50 	 	200 	 	200 	 	200 	 	200 	 	200 	 	1,050	 
 	 	50 	CN	200 	CN	200 	CN	200 	CN	200 	CN	200 	CN	1,050	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
44A 	CENTRAL LIBRARY RENOVATIONS-FY 04	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
44B 	CENTRAL LIBRARY RENOVATIONS-FY 02	240	 	 	 	 	 	 	 	 	 	 	 	240	 
 	 	240	CT	 	 	 	 	 	 	 	 	 	 	240	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
44C 	AUTOMATION UPGRADES AND EXPANSION-FY 02	60	 	 	 	 	 	 	 	 	 	 	 	60	 
 	 	60	CT	 	 	 	 	 	 	 	 	 	 	60	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
44D 	PROP ACQUISITION - FREE LIBRARY PROJ-FY 01	91	 	 	 	 	 	 	 	 	 	 	 	91	 
 	 	91	CT	 	 	 	 	 	 	 	 	 	 	91	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
LIBRARY FACILITIES - CAPITAL	4,192 	 	800 	 	750 	 	750 	 	650 	 	650 	 	7,792	 
 	 	950 	CN	800 	CN	750 	CN	750 	CN	650 	CN	650 	CN	4,550	CN
 	 	2,725 	CT	 	 	 	 	 	 	 	 	 	 	2,725	CT
 	 	154 	PB	 	 	 	 	 	 	 	 	 	 	154	PB
 	 	363 	SB	 	 	 	 	 	 	 	 	 	 	363	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
FREE LIBRARY	4,192 	 	800 	 	750 	 	750 	 	650 	 	650 	 	7,792	 
 	 	950 	CN	800 	CN	750 	CN	750 	CN	650 	CN	650 	CN	4,550 CN
 	 	2,725 	CT	 	 	 	 	 	 	 	 	 	 	2,725 CT
 	 	154 	PB	 	 	 	 	 	 	 	 	 	 	154 PB
 	 	363 	SB	 	 	 	 	 	 	 	 	 	 	363 SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
HEALTH	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HEALTH FACILITIES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
45	HEALTH ADMINISTRATION BUILDING	200 	 	200 	 	 	 	 	 	 	 	 	 	400	 
 	 	200 	CN	200 	CN	 	 	 	 	 	 	 	 	400	CN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
45A 	HEALTH ADMINISTRATION BUILDING-FY 04	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
45B 	HEALTH ADMINISTRATION BUILDING-FY 03	80	 	 	 	 	 	 	 	 	 	 	 	80	 
 	 	80	CT	 	 	 	 	 	 	 	 	 	 	80	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
45C 	HEALTH ADMINISTRATION BUILDING-FY 99|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
46	HEALTH DEPARTMENT EQUIPMENT AND REPAIRS	1,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	1,000 	 	6,000 
 	 	1,000 	CR	1,000 	CR	1,000	CR	1,000	CR	1,000 	CR	1,000 	CR	6,000	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
46A 	HEALTH DEPARTMENT EQUIPMENT AND REPAIRS-FY 04	1,000	 	 	 	 	 	 	 	 	 	 	 	1,000	 
 	 	1,000	CR	 	 	 	 	 	 	 	 	 	 	1,000	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
47	HEALTH FACILITY RENOVATIONS	640 	 	480 	 	250 		250	 	250 	 	250 		2,120	 
 	 	640 	CN	480 	CN	250	CN	250	CN	250	CN	250	CN	2,120	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
47A 	HEALTH FACILITY RENOVATIONS-FY 04	790	 	 	 	 	 	 	 	 	 	 	 	790	 
 	 	790	CT	 	 	 	 	 	 	 	 	 	 	790	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
47B 	HEALTH FACILITY RENOVATIONS-FY 03	392	 	 	 	 	 	 	 	 	 	 	 	392	 
 	 	392	CT	 	 	 	 	 	 	 	 	 	 	392	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
47C 	HEALTH FACILITY RENOVATIONS-FY 02	27	 	 	 	 	 	 	 	 	 	 	 	27	 
 	 	27	CT	 	 	 	 	 	 	 	 	 	 	27	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
47D 	HEALTH FACILITY RENOVATIONS-FY 00	327	 	 	 	 	 	 	 	 	 	 	 	327	 
 	 	327	CT	 	 	 	 	 	 	 	 	 	 	327	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
48	MEDICAL EXAMINER'S OFFICE	3,300 	 	 	 	 	 	 	 	 	 	 	 	3,300	 	 	1,500 	CN	 	 	 	 	 	 	 	 	 	 	1,500	CN
 	 	1,800 	SB	 	 	 	 	 	 	 	 	 	 	1,800	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
48A 	MEDICAL EXAMINER'S OFFICE-FY 04	350	 	 	 	 	 	 	 	 	 	 	 	350	 
 	 	350	CT	 	 	 	 	 	 	 	 	 	 	350	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HEALTH FACILITIES	8,314 	 	1,680	 	1,250 		1,250 	 	1,250	 	1,250 		 14,994	 
 	 	2,340 	CN	680 	CN	250	CN	250 	CN	250 	CN	250 	CN	4,020	CN
 	 	2,000 	CR	1,000 	CR	1,000	CR	1,000 	CR	1,000 	CR	1,000 	CR	7,000	CR
 	 	2,174 	CT	 	 	 	 	 	 	 	 	 	 	2,174	CT
 	 	1,800 	SB	 	 	 	 	 	 	 	 	 	 	1,800	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
PHILADELPHIA NURSING HOME
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49	EQUIPMENT AND RENOVATIONS - PHILADELPHIA NURSING HOME	1,900 	 	1,900 	 	1,900 		1,900 	 	1,900 	 	1,900 		11,400	 
 	 	1,900 	CR	1,900 	CR	1,900	CR	1,900 	CR	1,900 	CR	1,900 	CR	11,400	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49A 	EQUIPMENT AND RENOVATIONS - PNH-FY 04	1,900	 	 	 	 	 	 	 	 	 	 	 	1,900	 
 	 	1,900	CR	 	 	 	 	 	 	 	 	 	 	1,900	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49B 	PNH EQUIPMENT AND RENOVATIONS-FY 03	1,900	 	 	 	 	 	 	 	 	 	 	 	1,900	 
 	 	1,900	CR	 	 	 	 	 	 	 	 	 	 	1,900	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49C 	PNH EQUIPMENT AND RENOVATIONS-FY 02	1,371	 	 	 	 	 	 	 	 	 	 	 	1,371	 
 	 	1,371	CR	 	 	 	 	 	 	 	 	 	 	1,371	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PHILADELPHIA NURSING HOME	7,071 	 	1,900 	 	1,900 		1,900 	 	1,900 	 	1,900 	 	16,571	 
 	 	7,071 	CR	1,900 	CR	1,900	CR	1,900 	CR	1,900 	CR	1,900 	CR	16,571	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HEALTH	15,385 	 	3,580 	 	3,150 		3,150 	 	3,150 	 	3,150 	 	31,565	 
 	 	2,340 	CN	680 	CN	250	CN	250 	CN	250 	CN	250 	CN	4,020	CN
 	 	9,071 	CR	2,900 	CR	2,900	CR	2,900 	CR	2,900 	CR	2,900 	CR	23,571	CR
 	 	2,174 	CT	 	 	 	 	 	 	 	 	 	 	2,174	CT
 	 	1,800 	SB	 	 	 	 	 	 	 	 	 	 	1,800	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
HOUSING	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HOUSING & COMMUNITY DEVEL - CAPITAL	 	 	 	 	 	 	 	 	 	 	 	 	 	 
	 	 	 	 	 	 	 	 	 	 	 	 	 
49X 	SITE IMPROVEMENTS-FY 03	1,200	 	 	 	 	 	 	 	 	 	 	 	1,200	 
 	 	1,200	CT	 	 	 	 	 	 	 	 	 	 	1,200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49Y 	SITE IMPROVEMENTS-FY 99	174	 	 	 	 	 	 	 	 	 	 	 	174	 
 	 	174	CT	 	 	 	 	 	 	 	 	 	 	174	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
49Z 	SITE IMPROVEMENTS-FY 97	248	 	 	 	 	 	 	 	 	 	 	 	248	 
 	 	248	CT	 	 	 	 	 	 	 	 	 	 	248	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HOUSING & COMMUNITY DEVEL - CAPITAL	1,622 	 	 	 	 	 	 	 	 	 	 	 	1,622	 
 	 	1,622 	CT	 	 	 	 	 	 	 	 	 	 	1,622	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HOUSING	1,622 	 	 	 	 	 	 	 	 	 	 	 	1,622	 
 	 	1,622 	CT	 	 	 	 	 	 	 	 	 	 	1,622	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
HUMAN SERVICES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
RIVERVIEW - CAPITAL	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50	RIVERVIEW HOME RENOVATIONS	875 	 	300 	 	225 		425 	 	425 	 	425 	 	2,675	 
 	 	875 	CN	300 	CN	225	CN	425 	CN	425 	CN	425 	CN	2,675	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50A 	RIVERVIEW HOME RENOVATIONS-FY 04	598	 	 	 	 	 	 	 	 	 	 	 	598	 
 	 	598	CT	 	 	 	 	 	 	 	 	 	 	598	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50B 	RIVERVIEW HOME RENOVATIONS-FY 03	50	 	 	 	 	 	 	 	 	 	 	 	50	 
 	 	50	CT	 	 	 	 	 	 	 	 	 	 	50	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50C 	RIVERVIEW HOME RENOVATIONS-FY 02	143	 	 	 	 	 	 	 	 	 	 	 	143	 
 	 	143	CT	 	 	 	 	 	 	 	 	 	 	143	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50D 	RIVERVIEW HOME RENOVATIONS-FY 01	137	 	 	 	 	 	 	 	 	 	 	 	137	 
 	 	137	CT	 	 	 	 	 	 	 	 	 	 	137	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50W 	NEW YOUTH STUDY CENTER-FY 04	18,000	 	 	 	 	 	 	 	 	 	 	 	18,000	 
 	 	18,000	TB	 	 	 	 	 	 	 	 	 	 	18,000	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50X 	NEW YOUTH STUDY CENTER-FY 98	33,211	 	 	 	 	 	 	 	 	 	 	 	33,211	 
 	 	7,154	CT	 	 	 	 	 	 	 	 	 	 	7,154	CT
 	 	26,057	TB	 	 	 	 	 	 	 	 	 	 	26,057	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50Y 	YOUTH STUDY CENTER-RENOVATIONS-FY 97	410	 	 	 	 	 	 	 	 	 	 	 	410	 
 	 	410	CT	 	 	 	 	 	 	 	 	 	 	410	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
50Z 	YOUTH STUDY CENTER-RENOVATIONS-FY 96	1,478	 	 	 	 	 	 	 	 	 	 	 	1,478	 
 	 	1,478	CT	 	 	 	 	 	 	 	 	 	 	1,478	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
RIVERVIEW - CAPITAL	54,902 	 	300 	 	225 		425 	 	425 	 	425 	 	56,702	 
 	 	875 	CN	300 	CN	             225 CN	425 	CN	425 	CN	425 	CN	2,675	CN
 	 	9,970 	CT	 	 	 	 	 	 	 	 	 	 	9,970	CT
 	 	44,057 	TB	 	 	 	 	 	 	 	 	 	 	44,057	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
HUMAN SERVICES	54,902 	 	300 	 	225 	 	425 	 	425 	 	425 	 	56,702	 
 	 	875 	CN	300 	CN	225	CN	425 	CN	425 	CN	425 	CN	2,675	CN
 	 	9,970 	CT	 	 	 	 	 	 	 	 	 	 	9,970	CT
 	 	44,057	TB	 										44,057	TB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
MANAGING DIRECTOR'S OFFICE	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS - VARIOUS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51	CITYWIDE FACILITIES	3,000 	 	2,225 	2,050 	 	2,000 	 	2,000 	 	2,000 	 	13,275	 
 	 	3,000 	CN	2,225	CN	2,050	CN	2,000 	CN	2,000 	CN	2,000 	CN	13,275	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51A 	CITYWIDE FACILITIES-FY 04	4,040	 	 	 	 	 	 	 	 	 	 	 	4,040	 
 	 	4,040	CT	 	 	 	 	 	 	 	 	 	 	4,040	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51B 	CITYWIDE FACILITIES-FY 03	3,211	 	 	 	 	 	 	 	 	 	 	 	3,211	 
 	 	3,211	CT	 	 	 	 	 	 	 	 	 	 	3,211	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51C 	CITYWIDE FACILITIES-FY 02	2,519	 	 	 	 	 	 	 	 	 	 	 	2,519	 
 	 	2,314	CT	 	 	 	 	 	 	 	 	 	 	2,314	CT
 	 	205	PB	 	 	 	 	 	 	 	 	 	 	205	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51D 	CITYWIDE FACILITIES-FY 01	1,920	 	 	 	 	 	 	 	 	 	 	 	1,920	 
 	 	1,624	CT	 	 	 	 	 	 	 	 	 	 	1,624	CT
 	 	296	PB	 	 	 	 	 	 	 	 	 	 	296	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51E 	CITYWIDE FACILITIES-FY 00	766	 	 	 	 	 	 	 	 	 	 	 	766	 
 	 	766	CT	 	 	 	 	 	 	 	 	 	 	766	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51F 	CITYWIDE FACILITIES-FY 99	580	 	 	 	 	 	 	 	 	 	 	 	580	 
 	 	580	CT	 	 	 	 	 	 	 	 	 	 	580	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51G 	FACILITIES IMPROVEMENTS-CITYWIDE-FY 98	602	 	 	 	 	 	 	 	 	 	 	 	602	 
 	 	602	CT	 	 	 	 	 	 	 	 	 	 	602	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51H 	FACILITIES IMPROVEMENTS-CITYWIDE-FY 97	309	 	 	 	 	 	 	 	 	 	 	 	309	 
 	 	309	CT	 	 	 	 	 	 	 	 	 	 	309	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	  	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
51I 	FACILITIES IMPROVEMENTS-CITYWIDE-FY 96	38	 	 	 	 	 	 	 	 	 	 	 	38	 
 	 	38	CT	 	 	 	 	 	 	 	 	 	 	38	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51J 	LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 01	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51K 	LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 00	909	 	 	 	 	 	 	 	 	 	 	 	909	 
 	 	109	CT	 	 	 	 	 	 	 	 	 	 	109	CT
 	 	800	SB	 	 	 	 	 	 	 	 	 	 	800	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
51L 	LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 95	3,164	 	 	 	 	 	 	 	 	 	 	 	3,164	 
 	 	3,164	FB	 	 	 	 	 	 	 	 	 	 	3,164	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52	ENERGY STAR BUILDING UPGRADES	250 	 	250 	250 		250 		250 		250		1,500	 
 	 	250 	CN	250	CN	250	CN	250	CN	250	CN	250	CN	1,500	CN
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52A 	ENERGY STAR BUILDING UPGRADES-FY 04	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52B 	ENERGY STAR BUILDING UPGRADES-FY 03	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52C 	ENERGY STAR BUILDING UPGRADES-FY 02	410	 	 	 	 	 	 	 	 	 	 	 	410	 
 	 	410	CT	 	 	 	 	 	 	 	 	 	 	410	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52D 	ENERGY STAR BUILDING UPGRADES-FY 01	112	 	 	 	 	 	 	 	 	 	 	 	112	 
 	 	112	CT	 	 	 	 	 	 	 	 	 	 	112	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52E 	ENERGY STAR BUILDING UPGRADES-FY 00	81	 	 	 	 	 	 	 	 	 	 	 	81	 
 	 	81	CT	 	 	 	 	 	 	 	 	 	 	81	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52F 	ENERGY COST REDUCTION PROGRAM-FY 99	31	 	 	 	 	 	 	 	 	 	 	 	31	 
 	 	31	CT	 	 	 	 	 	 	 	 	 	 	31	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
52G 	ENERGY COST REDUCTION PROGRAM-FY 98	244	 	 	 	 	 	 	 	 	 	 	 	244	 
 	 	244	CT	 	 	 	 	 	 	 	 	 	 	244	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
52H 	ENERGY COST REDUCTION PROGRAM-FY 97	158	 	 	 	 	 	 	 	 	 	 	 	158	 
 	 	158	CT	 	 	 	 	 	 	 	 	 	 	158	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53	GREEN LIGHTS LIGHTING UPGRADES	250 	 	250	 	250	 	250 	 	250		250 	 	1,500	 
 	 	250 	CN	250	CN	250	CN	250	CN	250	CN	250	CN	1,500	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53A 	GREEN LIGHTS LIGHTING UPGRADES-FY 04	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53B 	GREEN LIGHTS LIGHTING UPGRADES-FY 03	250	 	 	 	 	 	 	 	 	 	 	 	250	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53C 	GREEN LIGHTS LIGHTING UPGRADES-FY 02	211	 	 	 	 	 	 	 	 	 	 	 	211	 
 	 	211	CT	 	 	 	 	 	 	 	 	 	 	211	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53D 	GREEN LIGHTS LIGHTING UPGRADES-FY 01	323	 	 	 	 	 	 	 	 	 	 	 	323	 
 	 	323	CT	 	 	 	 	 	 	 	 	 	 	323	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
53E 	GREEN LIGHTS LIGHTING UPGRADES-FY 00	299	 	 	 	 	 	 	 	 	 	 	 	299	 
 	 	299	CT	 	 	 	 	 	 	 	 	 	 	299	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
54	INTEGRATED CASE MANAGEMENT SYSTEM	1,500 	 	1,500 	1,000	 	 	 	 	 	 	 	4,000	
 	 	1,500 	CN	1,500	CN	1,000	CN	 	 	 	 	 	 	4,000	CN
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CAPITAL PROJECTS - VARIOUS	26,127 		4,225		3,550		2,500		2,500		2,500		41,402			 	5,000 	CN	4,225	CN	3,550	CN	2,500	CN	2,500	CN	2,500	CN	20,275	CN
 	 	16,662 	CT	 	 	 	 	 	 	 	 	 	 	16,662	CT
 	 	3,164 	FB	 	 	 	 	 	 	 	 	 	 	3,164	FB
 	 	501 	PB	 	 	 	 	 	 	 	 	 	 	501	PB
 	 	800 	SB	 	 	 	 	 	 	 	 	 	 	800	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
MANAGING DIRECTOR'S OFFICE	26,127 	 	4,225	 	3,550 		2,500 	 	2,500 	 	2,500		41,402	 
 	 	5,000 	CN	4,225	CN	3,550	CN	2,500	CN	2,500	CN	2,500	CN	20,275	CN
 	 	16,662 	CT	 	 	 	 	 	 	 	 	 	 	16,662	CT
 	 	3,164 	FB	 	 	 	 	 	 	 	 	 	 	3,164	FB
 	 	501 	PB	 	 	 	 	 	 	 	 	 	 	501	PB
 	 	800 	SB	 	 	 	 	 	 	 	 	 	 	800	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
MOIS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
55	DIGITAL ORTHOPHOTOGRAPHY, PLANIMETRIC, AND TOPOGRAPHIC			540	 			540				540		1,620	 
 	DATA	 	 	540	CN			540	CN			540	CN	1,620	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
55A 	CITYWIDE GEOG INFO SYS (GIS) SERVER-FY 01	319	 	 	 	 	 	 	 	 	 	 	 	319	 
 	 	319	CT	 	 	 	 	 	 	 	 	 	 	319	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
55B 	CITYWIDE GEOG INFO SYS (GIS) SERVER-FY 00	23	 	 	 	 	 	 	 	 	 	 	 	23	 
 	 	23	CT	 	 	 	 	 	 	 	 	 	 	23	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
55C 	DIGITAL MAPPING DATA-FY 04	363	 	 	 	 	 	 	 	 	 	 	 	363	 
 	 	363	CT	 	 	 	 	 	 	 	 	 	 	363	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
56	BUSINESS AND INFORMATION CONTINUITY/RECOVERY PROJECT	500 	 	1,000 	 	 	 	 	 	 	 	 	1,500
 	 	500 	CN	1,000	CN	 	 	 	 	 	 	 	 	1,500	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
56A 	INTEGRATED LIBRARY SYSTEMS-FY 04	644	 	 	 	 	 	 	 	 	 	 	 	644	 
 	 	644	CT	 	 	 	 	 	 	 	 	 	 	644	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	1,849 	 	1,540	 			540				540		4,469				500	CN	1,540	CN			540	CN			540	CN	3,120	CN
 	 	1,349 	CT											1,349	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
MOIS	1,849		1,540	 			540				540 	 	4,469
 	 	500	CN	1,540	CN			540	CN			540	CN	3,120	CN
 	 	1,349 	CT	 	 	 	 	 	 	 	 	 	 	1,349	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
POLICE	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
POLICE FACILITIES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
57	COMPUTER AND COMMUNICATION SYSTEM IMPROVEMENTS	1,140 		1,000		1,000		1,000		1,000		1,000		6,140	 
 	 	1,140	CR	1,000	CR	1,000	CR	1,000	CR	1,000	CR	1,000	CR	6,140	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
57A 	COMPUTER AND COMMUNICATION SYSTEM IMPS-FY 04	2,200	 	 	 	 	 	 	 	 	 	 	 	2,200	 
 	 	2,200	CR	 	 	 	 	 	 	 	 	 	 	2,200	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
57B 	COMPUTER/COMMUNICATION SYSTEMS IMPS-FY 03	3,339	 	 	 	 	 	 	 	 	 	 	 	3,339	 
 	 	3,300	CR	 	 	 	 	 	 	 	 	 	 	3,300	CR
 	 	39	CT	 	 	 	 	 	 	 	 	 	 	39	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
57C 	POLICE COMPUTER/COMMUNICATION SYS IMP-FY 02	1,331	 	 	 	 	 	 	 	 	 	 	 	1,331	 
 	 	1,331	CR	 	 	 	 	 	 	 	 	 	 	1,331	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
58	POLICE DEPARTMENT INTERIOR AND EXTERIOR IMPROVEMENTS	640 	 	500 	400		400		400		400		2,740	 
 	 	640	CN	500	CN	400	CN	400	CN	400	CN	400	CN	2,740	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
58A 	POLICE DEPT INTERIOR AND EXTERIOR IMPS-FY 04	1,092	 	 	 	 	 	 	 	 	 	 	 	1,092	 
 	 	1,092	CT	 	 	 	 	 	 	 	 	 	 	 1,092	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
58B 	POLICE FACIL INTERIOR & EXTERIOR IMPS-FY 03	1,210	 	 	 	 	 	 	 	 	 	 	 	1,210	 
 	 	510	CT	 	 	 	 	 	 	 	 	 	 	510	CT
 	 	700	SB	 	 	 	 	 	 	 	 	 	 	700	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
58C 	POLICE DEPARTMENT - NEW FACILITIES-FY 01	270	 	 	 	 	 	 	 	 	 	 	 	270	 
 	 	270	CT	 	 	 	 	 	 	 	 	 	 	270	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
58D 	HVAC AND MECHANICAL IMPROVEMENTS-FY 00	67	 	 	 	 	 	 	 	 	 	 	 	67	 
 	 	67	CT	 	 	 	 	 	 	 	 	 	 	67	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
POLICE FACILITIES	11,289 	 	1,500 	1,400 		1,400 	 	1,400 	 	1,400 		18,389	 	 	640	CN	500	CN	400	CN	400	CN	400	CN	400	CN	2,740	CN
 	 	7,971 	CR	1,000	CR	1,000	 CR	1,000 	CR	1,000 	CR	1,000 	CR	12,971	CR
 	 	1,978 	CT	 	 	 	 	 	 	 	 	 	 	1,978	CT
 	 	700 	SB	 	 	 	 	 	 	 	 	 	 	700	SB
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
POLICE	11,289 	 	1,500 	1,400		1,400		1,400		1,400		18,389		 	640	CN	500	CN	400	CN	400	CN	400	CN	400	CN	2,740	CN
 	 	7,971	CR	1,000	CR	1,000	CR	1,000	CR	1,000	CR	1,000	CR	12,971	CR
 	 	1,978 	CT	 	 	 	 	 	 	 	 	 	 	1,978	CT
 	 	700 	SB	 	 	 	 	 	 	 	 	 	 	700	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
PRISONS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CORRECTIONAL INSTITUTIONS - CAPITAL	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59	PRISON SYSTEM - RENOVATIONS	1,575 		500	 	500	 	400	 	500	 	500	 	3,975	 	 	1,575	CN	500	CN	500	CN	400	CN	500	CN	500	CN	3,975	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59A 	PRISON SYSTEM - RENOVATIONS-FY 04	2,450	 	 	 	 	 	 	 	 	 	 	 	2,450	 
 	 	2,450	CT	 	 	 	 	 	 	 	 	 	 	2,450	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59B 	PRISON SYSTEM - RENOVATIONS-FY 03	1,834	 	 	 	 	 	 	 	 	 	 	 	1,834	 
 	 	1,559	CT	 	 	 	 	 	 	 	 	 	 	1,559	CT
 	 	275	SB	 	 	 	 	 	 	 	 	 	 	275	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59C 	PRISON SYSTEM - RENOVATIONS-FY 02	194	 	 	 	 	 	 	 	 	 	 	 	194	 
 	 	161	A	 	 	 	 	 	 	 	 	 	 	161	A
 	 	33	CT	 	 	 	 	 	 	 	 	 	 	33	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59D 	PRISON FACILITIES - RENOVATIONS-FY 01	4,233	 	 	 	 	 	 	 	 	 	 	 	4,233	 
 	 	4,233	CT	 	 	 	 	 	 	 	 	 	 	4,233	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59E 	PRISON FACILITIES - RENOVATIONS-FY 00	36	 	 	 	 	 	 	 	 	 	 	 	36	 
 	 	36	CT	 	 	 	 	 	 	 	 	 	 	36	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59F 	PRISON FACILITIES - RENOVATIONS-FY 99	17	 	 	 	 	 	 	 	 	 	 	 	17	 
 	 	17	CT	 	 	 	 	 	 	 	 	 	 	17	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59G 	PRISON FACILITIES - RENOVATIONS-FY 98	15	 	 	 	 	 	 	 	 	 	 	 	15	 
 	 	15	CT	 	 	 	 	 	 	 	 	 	 	15	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59H 	PRISON FACILITIES - IMPROVEMENTS-FY 97	18	 	 	 	 	 	 	 	 	 	 	 	18	 
 	 	18	CT	 	 	 	 	 	 	 	 	 	 	18	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
59I 	PICC - RENOVATIONS-FY 96	467	 	 	 	 	 	 	 	 	 	 	 	467	 
 	 	467	CT	 	 	 	 	 	 	 	 	 	 	467	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
59J 	WOMEN'S CORRECTIONAL FACILITY-FY 99	54	 	 	 	 	 	 	 	 	 	 	 	54	 
 	 	54	TB	 	 	 	 	 	 	 	 	 	 	54	TB
59K	HOLMESBURG PRISON  - DEACTIVATION-FY 96	272												272
		272	CT											272	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CORRECTIONAL INSTITUTIONS - CAPITAL	11,165 	 	500	 	500	 	400	 	500	 	500	 	13,565 
 	 	161	A		 		 		 		 		 	161	A
 	 	1,575	CN	500	CN	500	CN	400	CN	500	CN	500	CN	3,975	CN
 	 	9,100	CT	 	 	 	 	 	 	 	 	 	 	9,100	CT
 	 	275	SB	 	 	 	 	 	 	 	 	 	 	275	SB
 	 	54	TB	 	 	 	 	 	 	 	 	 	 	54	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PRISONS	11,165 		500	 	500	 	400	 	500	 	500	 	13,565 
 	 	161	A		 		 		 		 		 	161	A
 	 	1,575	CN	500	CN	500	CN	400	CN	500	CN	500	CN	3,975	CN
 	 	9,100	CT	  	 	  	 		 		 			9,100	CT
 	 	275	SB	 	 	 	 	 	 	 	 	 	 	275	SB
 	 	54	TB	 	 	 	 	 	 	 	 	 	 	54	TB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
PUBLIC PROPERTY	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
BUILDINGS AND FACILITIES - OTHER	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60	BUILDINGS AND FACILITIES IMPROVEMENTS	665	  	 			 		 					665	 
 	 	665 	CN	 	 	 	 	 	 	 	 	 	 	665	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60A 	BUILDINGS AND FACILITIES IMPROVEMENTS-FY 04	25	 	 	 	 	 	 	 	 	 	 	 	25	 
 	 	25	CT	 	 	 	 	 	 	 	 	 	 	25	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60B 	CHINATOWN GATE RESTORATION-FY 01	31	 	 	 	 	 	 	 	 	 	 	 	31	 
 	 	31	CT	 	 	 	 	 	 	 	 	 	 	31	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60C 	EASTERN STATE PENITENTIARY RENOV-FY 99	4,100	 	 	 	 	 	 	 	 	 	 	 	4,100	 
 	 	644	CT	 	 	 	 	 	 	 	 	 	 	644	CT
 	 	3,456	PB	 	 	 	 	 	 	 	 	 	 	3,456	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60D 	LOCUST STREET CONCOURSE IMPROVEMENTS-FY 00	140	 	 	 	 	 	 	 	 	 	 	 	140	 
 	 	140	CT	 	 	 	 	 	 	 	 	 	 	140	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60E 	MARKET STREET EAST CONCOURSE IMPS-FY 96	96	 	 	 	 	 	 	 	 	 	 	 	96	 
 	 	96	CT	 	 	 	 	 	 	 	 	 	 	96	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60F 	MUNICIPAL BUILDINGS SECURITY-FY 03	6,223	 	 	 	 	 	 	 	 	 	 	 	6,223	 
 	 	6,223	CR	 	 	 	 	 	 	 	 	 	 	6,223	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60G 	PUBLIC CONCOURSE IMPROVEMENTS-FY 99	55	 	 	 	 	 	 	 	 	 	 	 	55	 
 	 	55	CT	 	 	 	 	 	 	 	 	 	 	55	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60H 	PUBLIC CONCOURSE/UNDERGROUND TUNNEL-FY 98	29	 	 	 	 	 	 	 	 	 	 	 	29	 
 	 	29	CT	 	 	 	 	 	 	 	 	 	 	29	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60I 	TRANSIT FACILITIES IMPROVEMENTS-FY 04	4,276	 	 	 	 	 	 	 	 	 	 	 	4,276	 
 	 	1,593	CT	 	 	 	 	 	 	 	 	 	 	1,593	CT
 	 	2,220	FB	 	 	 	 	 	 	 	 	 	 	2,220	FB
 	 	463	SB	 	 	 	 	 	 	 	 	 	 	463	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60J 	TRANSIT FACILITIES IMPROVEMENTS-FY 03	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
60K 	TRANSIT FACILITIES IMPROVEMENTS-FY 02	881	 	 	 	 	 	 	 	 	 	 	 	881	 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	722	FB	 	 	 	 	 	 	 	 	 	 	722	FB
 	 	151	SB	 	 	 	 	 	 	 	 	 	 	151	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
61	FAMILY COURT	1,000 	 	1,000 	300 		300 	 	300 		300	 	3,200	 
 	 	1,000	CN	1,000	CN	300	CN	300	CN	300	CN	300	CN	3,200	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
61A 	FAMILY COURT-FY 04	1,500 												1,500	 
 	 	1,500	CT	 	 	 	 	 	 	 	 	 	 	1,500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
61B 	FAMILY COURT-FY 03	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	2,000	CT	 	 	 	 	 	 	 	 	 	 	2,000	CT
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
61C 	FAMILY COURT RENOVATIONS-FY 01	389	 	 	 	 	 	 	 	 	 	 	 	389	 
 	 	389	CT	 	 	 	 	 	 	 	 	 	 	389	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
62	TRIPLEX FACILITY IMPROVEMENTS	200 	 	200 	200 		200 	 	200	 	200 		1,200	 
 	 	200	CN	200	CN	200	CN	200	CN	200	CN	200	CN	1,200	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
62A 	TRIPLEX FACILITY IMPROVEMENTS-FY 04	525		 	 	 	 	 	 	 	 	 	 	525	 
 	 	525	CT	 	 	 	 	 	 	 	 	 	 	525	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
62B 	TRIPLEX FACILITY IMPROVEMENTS-FY 03	170	 	 	 	 	 	 	 	 	 	 	 	170	 
 	 	170	CT	 	 	 	 	 	 	 	 	 	 	170	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
62C 	TRIPLEX FACILITY IMPROVEMENTS-FY 02|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
62D 	MUNICIPAL SERVICES BUILDING-FY 99	103	 	 	 	 	 	 	 	 	 	 	 	103	 
 	 	103	TB	 	 	 	 	 	 	 	 	 	 	103	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
BUILDINGS AND FACILITIES - OTHER	22,711 	 	1,200 	500	 	500 	 	500 	 	500 	 	25,911	 
 	 	1,865 	CN	1,200	CN	500	CN	500	CN	500	CN	500	CN	5,065	CN
 	 	6,223	CR	 	 	 	 	 	 	 	 	 	 	6,223	CR
 	 	7,508 	CT	 	 	 	 	 	 	 	 	 	 	7,508	CT
 	 	2,942 	FB	 	 	 	 	 	 	 	 	 	 	2,942	FB
 	 	3,456 	PB	 	 	 	 	 	 	 	 	 	 	3,456	PB
 	 	614 	SB	 	 	 	 	 	 	 	 	 	 	614	SB
		103	TB											103	TB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CITY HALL COMPLEX
	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 		 	 	 	 	 	 	 	 	 	 	 	 	 	 
63	CITY HALL	5,000 	 	5,000 	4,000 		4,000 	 	4,000 		4,000		26,000		 	5,000 	CN	5,000	CN	4,000	CN	4,000	CN	4,000	CN	4,000	CN	26,000	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
63A 	CITY HALL-FY 04	5,000	 	 	 	 	 	 	 	 	 	 	 	5,000	 
 	 	5,000	CT	 	 	 	 	 	 	 	 	 	 	5,000	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
63B 	CITY HALL-FY 03	3,207	 	 	 	 	 	 	 	 	 	 	 	3,207	 
 	 	3,207	CT	 	 	 	 	 	 	 	 	 	 	3,207	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
63C 	CITY HALL RENOVATIONS-FY 01	59	 	 	 	 	 	 	 	 	 	 	 	59	 
 	 	59	CT	 	 	 	 	 	 	 	 	 	 	59	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
63D 	CITY HALL RENOVATIONS-FY 00	138	 	 	 	 	 	 	 	 	 	 	 	138	 
 	 	138	CT	 	 	 	 	 	 	 	 	 	 	138	CT
63E 	CITY HALL RESTORATION-FY 95	1,860	 	 	 	 	 	 	 	 	 	 	 	1,860	 
 	 	1,860	A	 	 	 	 	 	 	 	 	 	 	1,860	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
63F 	CITY HALL RESTORATION-FY 94	406	 	 	 	 	 	 	 	 	 	 	 	406	 
 	 	406	A	 	 	 	 	 	 	 	 	 	 	406	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CITY HALL COMPLEX	15,670 	 	5,000 	4,000 	 	4,000 		4,000 		4,000 	 	36,670		 	2,266 	A	 	 	 	 	 	 	 	 	 	 	2,266	A
 	 	5,000 	CN	5,000	CN	4,000	CN	4,000	CN	4,000	CN	4,000	CN	26,000	CN
 	 	8,404	CT		 	  	 						 	8,404	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
COMMUNICATIONS PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64	COMMUNICATIONS SYSTEMS IMPROVEMENTS	5,500 	 	 	 	 	 	 	 	 	 	 	 	5,500	 
 	 	200 	CN	 	 	 	 	 	 	 	 	 	 	200	CN
 	 	5,300 	CR	 	 	 	 	 	 	 	 	 	 	5,300	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64A 	COMMUNICATIONS IMPROVEMENTS-FY 04	2,800	 	 	 	 	 	 	 	 	 	 	 	2,800	 
 	 	2,800	CT	 	 	 	 	 	 	 	 	 	 	2,800	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64B 	COMMUNICATIONS-FY 03	117	 	 	 	 	 	 	 	 	 	 	 	117	 
 	 	67	CR	 	 	 	 	 	 	 	 	 	 	67	CR
 	 	50	CT	 	 	 	 	 	 	 	 	 	 	50	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64C 	TELECOMMUNICATION INFRASTRUCTURE UPGR-FY 02	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64D 	TELECOMMUNICATION/INFRASTRUCTURE UPGR-FY 01	207	 	 	 	 	 	 	 	 	 	 	 	207	 
 	 	207	CT	 	 	 	 	 	 	 	 	 	 	207	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64E	NEW CITYWIDE RADIO SYSTEM - 800 MHZ-FY 96	111	 	 	 	 	 	 	 	 	 	 	 	111	 
 	 	111	CT	 	 	 	 	 	 	 	 	 	 	111	CT
COMMUNICATIONS PROJECTS	9,035 	 	 	 	 	 	 	 	 	 	 	 	9,035	 
 	 	200 	CN	 	 	 	 	 	 	 	 	 	 	200	CN
 	 	5,367 	CR	 	 	 	 	 	 	 	 	 	 	5,367	CR
 	 	3,468 	CT	 	 	 	 	 	 	 	 	 	 	3,468	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
PUBLIC PROPERTY	47,416 	 	6,200 		4,500		4,500 		4,500	 	4,500 		71,616	 
 	 	2,266	A	 	 	 	 	 	 	 	 	 	 	2,266	A
 	 	7,065	CN	6,200	CN	4,500	CN	4,500	CN	4,500	CN	4,500	CN	31,265	CN
 	 	11,590	CR		 		 		 	 	 	 	 	11,590	CR
 	 	19,380	CT		 		 	 	 	 	 	 	 	19,380	CT
 	 	2,942	FB		 		 	 	 	 	 	 	 	2,942	FB
 	 	3,456	PB		 		 	 	 	 	 	 	 	3,456	PB
 	 	614	SB		 		 	 	 	 	 	 	 	614	SB
		103	TB											103	TB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
RECORDS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	 	 	 	 	 	 	 	 	 	 	 	 	 
	  	 	 	 	 	 	 	 	 	 	 	 	 	 
64X 	LAN INFRASTRUCTURE-FY 00	47	 	 	 	 	 	 	 	 	 	 	 	47	 
 	 	47	CT	 	 	 	 	 	 	 	 	 	 	47	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64Y 	NETWORK INFRASTRUCT (CITY NET) DEVEL-FY 99	13	 	 	 	 	 	 	 	 	 	 	 	13	 
 	 	13	CT	 	 	 	 	 	 	 	 	 	 	13	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
64Z 	ORTHOPHOTOGRAPHY MAPPING PROJECT-FY 00	115	 	 	 	 	 	 	 	 	 	 	 	115	 
 	 	115	CT	 	 	 	 	 	 	 	 	 	 	115	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CAPITAL PROJECTS	175 	 	 	 	 	 	 	 	 	 	 	 	175	 
 	 	175 	CT	 	 	 	 	 	 	 	 	 	 	175	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 
	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
RECORDS	175 	 	 	 	 	 	 	 	 	 	 	 	175	 
 	 	175 	CT	 	 	 	 	 	 	 	 	 	 	175	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
RECREATION	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CULTURAL FACILITIES
	 	 	 	 	 	 	 	 	 	 	 	 	 
65	CULTURAL FACILITY IMPROVEMENTS	 	 	150 	 	 	 	 	 	 	 	 	 	150	 
 	 	 	 	150 	CN	 	 	 	 	 	 	 	 	150	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65A 	CULTURAL FACILITY IMPROVEMENTS-FY 04	1,540	 	 	 	 	 	 	 	 	 	 	 	1,540
 	 	540	CT	 	 	 	 	 	 	 	 	 	 	540	CT
 	 	1,000	PB	 	 	 	 	 	 	 	 	 	 	1,000	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65B 	CULTURAL FACILITIES-FY 03	600	 	 	 	 	 	 	 	 	 	 	 	600	 
 	 	600	CT	 	 	 	 	 	 	 	 	 	 	600	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65C 	CULTURAL FACILITIES-FY 02	86	 	 	 	 	 	 	 	 	 	 	 	86	 
 	 	86	CT	 	 	 	 	 	 	 	 	 	 	86	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65D 	CULTURAL FACILITIES-FY 01	162	 	 	 	 	 	 	 	 	 	 	 	162	 
 	 	162	CT	 	 	 	 	 	 	 	 	 	 	162	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65E 	CULTURAL FACILITIES-FY 00	190	 	 	 	 	 	 	 	 	 	 	 	190	 
 	 	190	CT	 	 	 	 	 	 	 	 	 	 	190	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65F 	CULTURAL FACILITIES-FY 99	2,034	 	 	 	 	 	 	 	 	 	 	 	2,034	 
 	 	1,034	CT	 	 	 	 	 	 	 	 	 	 	1,034	CT
 	 	1,000	PB	 	 	 	 	 	 	 	 	 	 	1,000	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65G 	CULTURAL FACILITIES-FY 98	108	 	 	 	 	 	 	 	 	 	 	 	108	 
 	 	108	CT	 	 	 	 	 	 	 	 	 	 	108	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
65H 	ATWATER KENT MUSEUM - RENOVATIONS-FY 94	58	 	 	 	 	 	 	 	 	 	 	 	58	 
 	 	58	A	 	 	 	 	 	 	 	 	 	 	58	A
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
CULTURAL FACILITIES	4,778 	 	150 	 	 	 	 	 	 	 	 	 	4,928	 
 	 	58 	A	 	 	 	 	 	 	 	 	 	 	58	A
 	 	 	 	150 	CN	 	 	 	 	 	 	 	 	150	CN
 	 	2,720 	CT	 	 	 	 	 	 	 	 	 	 	2,720	CT
 	 	2,000 	PB											2,000	PB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
ITEF - VARIOUS FACILITIES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
66	GRANT FUNDED RECREATION IMPROVEMENTS	2,000 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	2,000 	 	12,000	 
 	 	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	1,000 	CN	6,000	CN
 	 	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	6,000	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
66A 	GRANT FUNDED RECREATION IMPROVEMENTS-FY 04	2,000	 	 	 	 	 	 	 	 	 	 	 	2,000	 
 	 	1,000	CT	 	 	 	 	 	 	 	 	 	 	1,000	CT
 	 	1,000	SB	 	 	 	 	 	 	 	 	 	 	1,000	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
66B 	STATE GRANT FUNDED RECREATION IMPS-FY 03	535	 	 	 	 	 	 	 	 	 	 	 	535	 
 	 	535	SB	 	 	 	 	 	 	 	 	 	 	535	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
66C 	STATE GRANT FUNDED RECREATION IMPS-FY 02	3,030	 	 	 	 	 	 	 	 	 	 	 	3,030	 
 	 	65	CT	 	 	 	 	 	 	 	 	 	 	65	CT
 	 	890	FB	 	 	 	 	 	 	 	 	 	 	890	FB
 	 	2,075	SB	 	 	 	 	 	 	 	 	 	 	2,075	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
66D 	STATE RECREATION GRANT - VARIOUS SITE-FY 96	50	 	 	 	 	 	 	 	 	 	 	 	50	 
 	 	50	SB	 	 	 	 	 	 	 	 	 	 	50	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67	IMPROVEMENTS TO EXISTING RECREATION FACILITIES	11,000 	 	4,000 	 	4,000 	 	4,000 	 	4,000 	 	4,000 	 	31,000	 
 	 	11,000 	CN	4,000 	CN	4,000 	CN	4,000 	CN	4,000 	CN	4,000 	CN	31,000	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67A 	IMPROVEMENTS TO EXISTING REC FACILITIES-FY 04	11,187	 	 	 	 	 	 	 	 	 	 	 	11,187
 	 	11,187	CT	 	 	 	 	 	 	 	 	 	 	11,187	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67B 	IMPRS TO EXISTING REC FACILITIES-FY 03	8,263	 	 	 	 	 	 	 	 	 	 	 	8,263	 
 	 	8,263	CT	 	 	 	 	 	 	 	 	 	 	8,263	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67C 	IMPROVEMENTS TO EXISTING REC FACIL-FY 02	7,017	 	 	 	 	 	 	 	 	 	 	 	7,017	 
 	 	7,017	CT	 	 	 	 	 	 	 	 	 	 	7,017	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67D 	IMPS TO EXISTING REC FACILITIES-FY 01	4,401	 	 	 	 	 	 	 	 	 	 	 	4,401	 
 	 	4,401	CT	 	 	 	 	 	 	 	 	 	 	4,401	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67E 	ITEF - SITE IMPROVEMENTS-FY 00	4,694	 	 	 	 	 	 	 	 	 	 	 	4,694	 
 	 	4,694	CT	 	 	 	 	 	 	 	 	 	 	4,694	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67F 	IMPROVEMENTS TO EXISTING FACILITIES-FY 99	3,241	 	 	 	 	 	 	 	 	 	 	 	3,241	 
 	 	3,241	CT	 	 	 	 	 	 	 	 	 	 	3,241	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67G 	IMPROVEMENTS TO EXISTING FACILITIES-FY 98	1,384	 	 	 	 	 	 	 	 	 	 	 	1,384	 
 	 	1,384	CT	 	 	 	 	 	 	 	 	 	 	1,384	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67H 	IMPROVEMENTS TO EXISTING FACILITIES-FY 97	140	 	 	 	 	 	 	 	 	 	 	 	140	 
 	 	140	CT	 	 	 	 	 	 	 	 	 	 	140	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67I 	IMPROVEMENTS TO EXISTING FACILITIES-FY 96	211	 	 	 	 	 	 	 	 	 	 	 	211	 
 	 	211	CT	 	 	 	 	 	 	 	 	 	 	211	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67J 	IMPROVEMENTS TO EXISTING FACILITIES-FY 95	708	 	 	 	 	 	 	 	 	 	 	 	708	 
 	 	708	CT	 	 	 	 	 	 	 	 	 	 	708	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67K 	IMPROVEMENTS TO EXISTING FACILITIES-FY 94	108	 	 	 	 	 	 	 	 	 	 	 	108	 
 	 	108	A	 	 	 	 	 	 	 	 	 	 	108	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67L 	CIONE PG - REMEDIATION & IMPROVEMENTS-FY 01	368	 	 	 	 	 	 	 	 	 	 	 	368	 
 	 	368	PB	 	 	 	 	 	 	 	 	 	 	368	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67M 	NEW NORTHEAST COMMUNITY CENTER-FY 00	2,219	 	 	 	 	 	 	 	 	 	 	 	2,219	 
 	 	1,219	CT	 	 	 	 	 	 	 	 	 	 	1,219	CT
 	 	1,000	SB	 	 	 	 	 	 	 	 	 	 	1,000	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
67N 	LONNIE YOUNG RECREATION CENTER-FY 99	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	SB	 	 	 	 	 	 	 	 	 	 	500	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68 IMPROVEMENTS TO EXISTING RECREATION FACILITIES -
	INFRASTRUCTURE	150 	 	150 	 	100 	 	100 	 	100 	 	100 	 	700	 
 		150 	CN	150 	CN	100 	CN	100 	CN	100 	CN	100 	CN	700	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68A 	IMPS TO EXISTING FACIL - INFRASTRUCTURE-FY 04	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68B 	ITEF - INFRASTRUCTURE-FY 03	144	 	 	 	 	 	 	 	 	 	 	 	144	 
 	 	144	CT	 	 	 	 	 	 	 	 	 	 	144	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68C 	ITEF - INFRASTRUCTURE-FY 02	44	 	 	 	 	 	 	 	 	 	 	 	44	 
 	 	44	CT	 	 	 	 	 	 	 	 	 	 	44	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68D 	ITEF - BUILDING RENOVATIONS-FY 95	30	 	 	 	 	 	 	 	 	 	 	 	30	 
 	 	30	A	 	 	 	 	 	 	 	 	 	 	30	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68E 	ITEF - OUTDOOR LIGHTING-FY 95|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68F 	ITEF - SITE RENOVATIONS-FY 95	115	 	 	 	 	 	 	 	 	 	 	 	115	 
 	 	65	A	 	 	 	 	 	 	 	 	 	 	65	A
 	 	50	CT	 	 	 	 	 	 	 	 	 	 	50	CT
 	 	 	 	 	 	 	 	 	 
	 	 	 	 	 	
 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
68G 	ITEF - SITE RENOVATIONS-FY 94	105	 	 	 	 	 	 	 	 	 	 	 	105	 
 	 	105	A	 	 	 	 	 	 	 	 	 	 	105	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68H 	ADMIN, DESIGN & ENGINEERING - REC-FY 02	320	 	 	 	 	 	 	 	 	 	 	 	320	 
 	 	270	CT	 	 	 	 	 	 	 	 	 	 	270	CT
 	 	50	PB	 	 	 	 	 	 	 	 	 	 	50	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68I 	ADMIN, DESIGN & ENGINEERING - REC-FY 01	775	 	 	 	 	 	 	 	 	 	 	 	775	 
 	 	775	CT	 	 	 	 	 	 	 	 	 	 	775	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68J 	ADMIN, DESIGN & ENGINEERING - REC-FY 00	304	 	 	 	 	 	 	 	 	 	 	 	304	 
 	 	304	CT	 	 	 	 	 	 	 	 	 	 	304	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
68K 	ADMINISTRATION, DESIGN & ENGINEERING-FY 99	394	 	 	 	 	 	 	 	 	 	 	 	394	 
 	 	394	CT	 	 	 	 	 	 	 	 	 	 	394	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
69	IMPROVEMENTS TO EXISTING RECREATION FACILITIES - 
	SWIMMING POOLS	500 	 	500 	 	500 	 	500 	 	500 	 	500 	 	3,000	 
 	  	500 	CN	500 	CN	500 	CN	500 	CN	500 	CN	500 	CN	3,000	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
69A 	IMPS TO EXISTING REC FACIL - POOLS-FY 04	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
69B 	IMP TO EXISTING REC FACIL - POOLS-FY 03	50	 	 	 	 	 	 	 	 	 	 	 	50	 
 	 	50	CT	 	 	 	 	 	 	 	 	 	 	50	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
69C 	ITEF - SWIMMING POOLS-FY 02	900	 	 	 	 	 	 	 	 	 	 	 	900	 
 	 	900	CT	 	 	 	 	 	 	 	 	 	 	900	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
69D 	ITEF-SWIMMING POOL RENOVATIONS-FY 95	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	A	 	 	 	 	 	 	 	 	 	 	100	A
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
69E 	ITEF-SWIMMING POOL RENOVATIONS-FY 94	56	 	 	 	 	 	 	 	 	 	 	 	56	 
 	 	56	A	 	 	 	 	 	 	 	 	 	 	56	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
70	IMPROVEMENTS TO EXISTING RECREATION FACILITIES - 
LIFE SAFETY SYSTEMS	300 	 	300 	 	300 	 	300 	 	300 	 	300 	 	1,800	 
 	 	300 	CN	300 	CN	300 	CN	300 	CN	300 	CN	300 	CN	1,800	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
70A 	IMPS TO EXISTING FACIL - LIFE SAFETY SYS-FY 04	400	 	 	 	 	 	 	 	 	 	 	 	400	 
 	 	400	CT	 	 	 	 	 	 	 	 	 	 	400	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
70B 	ITEF - LIFE SAFETY SYSTEMS-FY 03	399	 	 	 	 	 	 	 	 	 	 	 	399	 
 	 	399	CT	 	 	 	 	 	 	 	 	 	 	399	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
70C 	ITEF-FIRE SAFETY SECURITY SYSTEMS-FY 95|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|A	 	 	 	 	 	 	 	 	 	 |99|A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
70D 	ITEF-FIRE SAFETY SECURITY SYSTEMS-FY 94	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	A	 	 	 	 	 	 	 	 	 	 	300	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
71	ICE RINK RENOVATIONS	600 	 	 	 	 	 	 	 	 	 	 	 	600	 
 	 	600 	CN	 	 	 	 	 	 	 	 	 	 	600	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
71A 	ICE RINK RENOVATIONS-FY 04	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
71B 	ICE RINK RENOVATIONS-FY 02	500	 	 	 	 	 	 	 	 	 	 	 	500	 
 	 	500	CT	 	 	 	 	 	 	 	 	 	 	500	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
71C 	ICE RINK RENOVATIONS-FY 01	550	 	 	 	 	 	 	 	 	 	 	 	550	 
 	 	550	CT	 	 	 	 	 	 	 	 	 	 	550	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
ITEF - VARIOUS FACILITIES	71,302 	 	6,950 	 	6,900 	 	6,900 	 	6,900 	 	6,900 	 	105,852	 
 	 	770 	A	 	 	 	 	 	 	 	 	 	 	770	A
 	 	13,550 	CN	5,950 	CN	5,900 	CN	5,900 	CN	5,900 	CN	5,900 	CN	43,100	CN
 	 	49,514 	CT	 	 	 	 	 	 	 	 	 	 	49,514	CT
 	 	890 	FB	 	 	 	 	 	 	 	 	 	 	890	FB
 	 	418 	PB	 	 	 	 	 	 	 	 	 	 	418	PB
 	 	6,160 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	11,160	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
RECREATION	76,080 	 	7,100 	 	6,900 	 	6,900 	 	6,900 	 	6,900 	 	110,780	 
 	 	828 	A	 	 	 	 	 	 	 	 	 	 	828	A
 	 	13,550 	CN	6,100 	CN	5,900 	CN	5,900 	CN	5,900 	CN	5,900 	CN	43,250	CN
 	 	52,234 	CT	 	 	 	 	 	 	 	 	 	 	52,234	CT
 	 	890 	FB	 	 	 	 	 	 	 	 	 	 	890	FB
 	 	2,418 	PB	 	 	 	 	 	 	 	 	 	 	2,418	PB
 	 	6,160 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	1,000 	SB	11,160	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
STREETS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
BRIDGES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72	BRIDGE RECONSTRUCTION & IMPROVEMENTS	6,142 	 	29,530 	 	45,900 	 	4,100 	 	9,200 	 	10,200 	 	105,072	 
 	 	602 	CN	3,126 	CN	4,540 	CN	360 	CN	870 	CN	970 	CN	10,468 	CN
 	 	4,676 	FB	22,628 	FB	34,924 	FB	3,156 	FB	7,032 	FB	7,792 	FB	80,208 	FB
 	 	864 	SB	3,776 	SB	6,436 	SB	584 	SB	1,298 	SB	1,438 	SB	14,396 	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72A 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 04	4,350	 	 	 	 	 	 	 	 	 	 	 	4,350	 
 	 	385	CT	 	 	 	 	 	 	 	 	 	 	385	CT
 	 	3,346	FB	 	 	 	 	 	 	 	 	 	 	3,346	FB
 	 	619	SB	 	 	 	 	 	 	 	 	 	 	619	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72B 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 03	5,792	 	 	 	 	 	 	 	 	 	 	 	5,792	 
 	 	1,088	CT	 	 	 	 	 	 	 	 	 	 	1,088	CT
 	 	3,969	FB	 	 	 	 	 	 	 	 	 	 	3,969	FB
 	 	735	SB	 	 	 	 	 	 	 	 	 	 	735	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72C 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 02	7,912	 	 	 	 	 	 	 	 	 	 	 	7,912	 
 	 	744	CT	 	 	 	 	 	 	 	 	 	 	744	CT
 	 	5,821	FB	 	 	 	 	 	 	 	 	 	 	5,821	FB
 	 	172	PB	 	 	 	 	 	 	 	 	 	 	172	PB
 	 	1,175	SB	 	 	 	 	 	 	 	 	 	 	1,175	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72D 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 01	1,725	 	 	 	 	 	 	 	 	 	 	 	1,725	 
 	 	1,407	FB	 	 	 	 	 	 	 	 	 	 	1,407	FB
 	 	66	PB	 	 	 	 	 	 	 	 	 	 	66	PB
 	 	252	SB	 	 	 	 	 	 	 	 	 	 	252	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72E 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 00	5,382	 	 	 	 	 	 	 	 	 	 	 	5,382	 
 	 	4,372	FB	 	 	 	 	 	 	 	 	 	 	4,372	FB
 	 	225	PB	 	 	 	 	 	 	 	 	 	 	225	PB
 	 	785	SB	 	 	 	 	 	 	 	 	 	 	785	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
72F 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 99	924	 	 	 	 	 	 	 	 	 	 	 	924	 
 	 	787	FB	 	 	 	 	 	 	 	 	 	 	787	FB
 	 |99|PB	 	 	 	 	 	 	 	 	 	 |99|PB
 	 	131	SB	 	 	 	 	 	 	 	 	 	 	131	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72G 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 98	602	 	 	 	 	 	 	 	 	 	 	 	602	 
 	 	64	CT	 	 	 	 	 	 	 	 	 	 	64	CT
 	 	469	FB	 	 	 	 	 	 	 	 	 	 	469	FB
 	 	69	SB	 	 	 	 	 	 	 	 	 	 	69	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72H 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 97	260	 	 	 	 	 	 	 	 	 	 	 	260	 
 	 	130	PB	 	 	 	 	 	 	 	 	 	 	130	PB
 	 	130	SB	 	 	 	 	 	 	 	 	 	 	130	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72I 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 96	99	 	 	 	 	 	 	 	 	 	 	 	99	 
 	 	83	FB	 	 	 	 	 	 	 	 	 	 	83	FB
 	 	16	SB	 	 	 	 	 	 	 	 	 	 	16	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72J 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 95	480	 	 	 	 	 	 	 	 	 	 	 	480	 
 	 	12	A	 	 	 	 	 	 	 	 	 	 	12	A
 	 	303	FB	 	 	 	 	 	 	 	 	 	 	303	FB
 	 	112	PB	 	 	 	 	 	 	 	 	 	 	112	PB
 	 	53	SB	 	 	 	 	 	 	 	 	 	 	53	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
72K 	BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 94	4,017	 	 	 	 	 	 	 	 	 	 	 	4,017	 
 	 	29	A	 	 	 	 	 	 	 	 	 	 	29	A
 	 	2,928	FB	 	 	 	 	 	 	 	 	 	 	2,928	FB
 	 	1,060	SB	 	 	 	 	 	 	 	 	 	 	1,060	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
BRIDGES	37,685 	 	29,530 	 	45,900 	 	4,100 	 	9,200 	 	10,200 	 	136,615	 
 	 	41 	A	 	 	 	 	 	 	 	 	 	 	41 	A
 	 	602 	CN	3,126 	CN	4,540 	CN	360 	CN	870 	CN	970 	CN	10,468 	CN
 	 	2,281 	CT	 	 	 	 	 	 	 	 	 	 	2,281 	CT
 	 	28,161 	FB	22,628 	FB	34,924 	FB	3,156 	FB	7,032 	FB	7,792 	FB	103,693 	FB
 	 	711 	PB	 	 	 	 	 	 	 	 	 	 	711 	PB
 	 	5,889 	SB	3,776 	SB	6,436 	SB	584 	SB	1,298 	SB	1,438 	SB	19,421 	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
GRADING & PAVING	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73	RECONSTRUCTION/RESURFACING OF STREETS	11,000 	 	10,000 	 	8,000 	 	8,000 	 	8,000 	 	8,000 	 	53,000	 
 	 	11,000 	CN	10,000 	CN	8,000 	CN	8,000 	CN	8,000 	CN	8,000 	CN	53,000 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73A 	RECONSTRUCTION/RESURFACING OF STREETS-FY 04	7,452	 	 	 	 	 	 	 	 	 	 	 	7,452	 
 	 	7,452	CT	 	 	 	 	 	 	 	 	 	 	7,452	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73B 	RECONSTRUCTION/RESURFACING OF STREETS-FY 03	3,412	 	 	 	 	 	 	 	 	 	 	 	3,412	 
 	 	3,412	CT	 	 	 	 	 	 	 	 	 	 	3,412	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73C 	RECONSTRUCTION/RESURFACING OF STREETS-FY 02	1,020	 	 	 	 	 	 	 	 	 	 	 	1,020	 
 	 	1,020	CT	 	 	 	 	 	 	 	 	 	 	1,020	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73D 	RECONSTRUCTION/RESURFACING OF STREETS-FY 01	669	 	 	 	 	 	 	 	 	 	 	 	669	 
 	 	669	CT	 	 	 	 	 	 	 	 	 	 	669	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73E 	RECONSTRUCTION/RESURFACING OF STREETS-FY 00	200	 	 	 	 	 	 	 	 	 	 	 	200	 
 	 	200	CT	 	 	 	 	 	 	 	 	 	 	200	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73F 	RECONSTRUCTION/RESURF OF STREETS-FY 99	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
73G 	STADIUM COMPLEX - ROADWAY IMPS-FY 03	1,111	 	 	 	 	 	 	 	 	 	 	 	1,111	 
 	 	826	A	 	 	 	 	 	 	 	 	 	 	826	A
 	 	285	PB	 	 	 	 	 	 	 	 	 	 	285	PB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
74	HISTORIC STREETS	200 	 	200 	 	200 	 	200 	 	200 	 	200 	 	1,200	 
 	 	200 	CN	200 	CN	200 	CN	200 	CN	200 	CN	200 	CN	1,200 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
GRADING & PAVING	25,164 	 	10,200 	 	8,200 	 	8,200 	 	8,200 	 	8,200 	 	68,164
 	 	826 	A	 	 	 	 	 	 	 	 	 	 	826 	A
 	 	11,200 	CN	10,200 	CN	8,200 	CN	8,200 	CN	8,200 	CN	8,200 	CN	54,200 	CN
 	 	12,853 	CT	 	 	 	 	 	 	 	 	 	 	12,853 	CT
 	 	285 	PB	 	 	 	 	 	 	 	 	 	 	285 	PB
IMPROVEMENTS TO CITY HIGHWAYS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
75	CENTER CITY TRAFFIC SIGNALS - PHASE 2	3,510 	 	3,510 	 	 	 	 	 	 	 	 	 	7,020	 
 	 	10 	CN	10 	CN	 	 	 	 	 	 	 	 	20 	CN
 	 	3,500 	FB	3,500 	FB	 	 	 	 	 	 	 	 	7,000 	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
75A 	CENTER CITY TRAFFIC SIGNALS - PHASE 2-FY 04	3,200	 	 	 	 	 	 	 	 	 	 	 	3,200	 
 	 	3,200	FB	 	 	 	 	 	 	 	 	 	 	3,200	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
75B 	CENTER CITY TRAFFIC SIGNALS - PHASE 2-FY 02	5,150	 	 	 	 	 	 	 	 	 	 	 	5,150	 
 	 	350	CT	 	 	 	 	 	 	 	 	 	 	350	CT
 	 	4,800	FB	 	 	 	 	 	 	 	 	 	 	4,800	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
75C 	CENTER CITY SIGNAL IMPROVEMENTS-FY 96	170	 	 	 	 	 	 	 	 	 	 	 	170	 
 	 	170	CT	 	 	 	 	 	 	 	 	 	 	170	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
76	"FOREVER GREEN" PROGRAM	40 	 	40 	 	40 	 	40 	 	40 	 	40 	 	240	 
 	 	40 	CN	40 	CN	40 	CN	40 	CN	40 	CN	40 	CN	240 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77	FEDERAL AID HIGHWAY PROGRAM	14,810 	 	8,910 	 	8,805 	 	8,880 	 	7,500 	 	7,700 	 	56,605	 
 	 	3,710 	CN	2,310 	CN	2,305 	CN	2,380 	CN	1,200 	CN	1,200 	CN	13,105 	CN
 	 	10,700 	FB	6,100 	FB	6,000 	FB	6,000 	FB	5,800 	FB	6,000 	FB	40,600 	FB
 	 	400 	SB	500 	SB	500 	SB	500 	SB	500 	SB	500 	SB	2,900 	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
77A 	FEDERAL AID HIGHWAY PROGRAM-FY 04	8,750	 	 	 	 	 	 	 	 	 	 	 	8,750	 
 	 	1,910	CT	 	 	 	 	 	 	 	 	 	 	1,910	CT
 	 	6,440	FB	 	 	 	 	 	 	 	 	 	 	6,440	FB
 	 	400	SB	 	 	 	 	 	 	 	 	 	 	400	SB
77B 	FEDERAL AID HIGHWAY PROGRAM-FY 03	7,433	 	 	 	 	 	 	 	 	 	 	 	7,433	 
 	 	1,433	CT	 	 	 	 	 	 	 	 	 	 	1,433	CT
 	 	5,750	FB	 	 	 	 	 	 	 	 	 	 	5,750	FB
 	 	250	SB	 	 	 	 	 	 	 	 	 	 	250	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77C 	FEDERAL AID HIGHWAY PROGRAM-FY 02	10,004	 	 	 	 	 	 	 	 	 	 	 	10,004	 
 	 	1,499	CT	 	 	 	 	 	 	 	 	 	 	1,499	CT
 	 	8,505	FB	 	 	 	 	 	 	 	 	 	 	8,505	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77D 	FEDERAL AID HIGHWAY PROGRAM-FY 01	7,217	 	 	 	 	 	 	 	 	 	 	 	7,217	 
 	 	585	CT	 	 	 	 	 	 	 	 	 	 	585	CT
 	 	6,632	FB	 	 	 	 	 	 	 	 	 	 	6,632	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77E 	FEDERAL AID HIGHWAY PROGRAM-FY 99	851	 	 	 	 	 	 	 	 	 	 	 	851	 
 	 	53	CT	 	 	 	 	 	 	 	 	 	 	53	CT
 	 	798	FB	 	 	 	 	 	 	 	 	 	 	798	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77F 	FEDERAL AID HIGHWAY PROGRAM-FY 98	738	 	 	 	 	 	 	 	 	 	 	 	738	 
 	 	738	FB	 	 	 	 	 	 	 	 	 	 	738	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77G 	FEDERAL AID HIGHWAY PROGRAM-FY 97	1,798	 	 	 	 	 	 	 	 	 	 	 	1,798	 
 	 	1,422	FB	 	 	 	 	 	 	 	 	 	 	1,422	FB
 	 	376	SB	 	 	 	 	 	 	 	 	 	 	376	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77H 	FEDERAL AID HIGHWAY PROGRAM-FY 96	2,068	 	 	 	 	 	 	 	 	 	 	 	2,068	 
 	 	162	CT	 	 	 	 	 	 	 	 	 	 	162	CT
 	 	1,906	FB	 	 	 	 	 	 	 	 	 	 	1,906	FB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
77I 	FEDERAL AID HIGHWAY PROGRAM-FY 95	3,821	 	 	 	 	 	 	 	 	 	 	 	3,821	 
 	 	155	A	 	 	 	 	 	 	 	 	 	 	155	A
 	 	1,092	FB	 	 	 	 	 	 	 	 	 	 	1,092	FB
 	 	2,574	SB	 	 	 	 	 	 	 	 	 	 	2,574	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77J 	26TH STREET GATEWAY IMPROVEMENTS-FY 94	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	A	 	 	 	 	 	 	 	 	 	 	100	A
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77K 	AVENUE OF THE ARTS - N. BROAD STREET-FY 03	3,500	 	 	 	 	 	 	 	 	 	 	 	3,500	 
 	 	3,500	FB	 	 	 	 	 	 	 	 	 	 	3,500	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77L 	BICYCLE NETWORK PLAN-FY 01	312	 	 	 	 	 	 	 	 	 	 	 	312	 
 	 	11	CT	 	 	 	 	 	 	 	 	 	 	11	CT
 	 	301	FB	 	 	 	 	 	 	 	 	 	 	301	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77M 	BROAD & ERIE SUBWAY - INTERMODAL IMPS-FY 02	3,300	 	 	 	 	 	 	 	 	 	 	 	3,300	 
 	 	420	CT	 	 	 	 	 	 	 	 	 	 	420	CT
 	 	2,880	FB	 	 	 	 	 	 	 	 	 	 	2,880	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77N 	BROAD & ERIE SUBWAY - INTERMODAL IMPS-FY 00	1,649	 	 	 	 	 	 	 	 	 	 	 	1,649	 
 	 	29	CT	 	 	 	 	 	 	 	 	 	 	29	CT
 	 	1,440	FB	 	 	 	 	 	 	 	 	 	 	1,440	FB
 	 	180	SB	 	 	 	 	 	 	 	 	 	 	180	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77O 	ERIE SUBWAY STATION - INTERMODAL IMP-FY 94	147	 	 	 	 	 	 	 	 	 	 	 	147	 
 	 	91	FB	 	 	 	 	 	 	 	 	 	 	91	FB
 	 	56	SB	 	 	 	 	 	 	 	 	 	 	56	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77P 	DELAWARE AVE EXTENSION - BRIDESBURG-FY 00	4,858	 	 	 	 	 	 	 	 	 	 	 	4,858	 
 	 	478	CT	 	 	 	 	 	 	 	 	 	 	478	CT
 	 	3,892	FB	 	 	 	 	 	 	 	 	 	 	3,892	FB
 	 	488	SB	 	 	 	 	 	 	 	 	 	 	488	SB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
77Q 	INDEPENDENCE MALL GATEWAY-FY 03	3,108	 	 	 	 	 	 	 	 	 	 	 	3,108	 
 	 	3,108	FB	 	 	 	 	 	 	 	 	 	 	3,108	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77R 	INDEPENDENCE MALL GATEWAY-FY 02	2,197	 	 	 	 	 	 	 	 	 	 	 	2,197	 
 	 	2,197	FB	 	 	 	 	 	 	 	 	 	 	2,197	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77S 	INDEPENDENCE MALL GATEWAY-FY 01	1,836	 	 	 	 	 	 	 	 	 	 	 	1,836	 
 	 	204	CT	 	 	 	 	 	 	 	 	 	 	204	CT
 	 	1,332	FB	 	 	 	 	 	 	 	 	 	 	1,332	FB
 	 	300	TB	 	 	 	 	 	 	 	 	 	 	300	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77T 	MAIN ST/RIDGE AVE - INTERSECTION IMPS-FY 01	564	 	 	 	 	 	 	 	 	 	 	 	564	 
 	 	564	CT	 	 	 	 	 	 	 	 	 	 	564	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77U 	MAIN STREET/RIDGE AVENUE-FY 98	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77V 	PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 03	927	 	 	 	 	 	 	 	 	 	 	 	927	 
 	 	927	PB	 	 	 	 	 	 	 	 	 	 	927	PB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77W 	PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 02	1,300	 	 	 	 	 	 	 	 	 	 	 	1,300	 
 	 	1,300	CT	 	 	 	 	 	 	 	 	 	 	1,300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77X 	SCHUYLKILL RIVER PARK-FY 98	51	 	 	 	 	 	 	 	 	 	 	 	51	 
 	 	40	CT	 	 	 	 	 	 	 	 	 	 	40	CT
 	 	11	FB	 	 	 	 	 	 	 	 	 	 	11	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
77Y 	WESTBANK GREENWAY-FY 02	2,300	 	 	 	 	 	 	 	 	 	 	 	2,300	 
 	 	460	CT	 	 	 	 	 	 	 	 	 	 	460	CT
 	 	1,840	FB	 	 	 	 	 	 	 	 	 	 	1,840	FB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
77Z 	WESTBANK GREENWAY-FY 00	662	 	 	 	 	 	 	 	 	 	 	 	662	 
 	 	108	CT	 	 	 	 	 	 	 	 	 	 	108	CT
 	 	554	FB	 	 	 	 	 	 	 	 	 	 	554	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
IMPROVEMENTS TO CITY HIGHWAYS	96,471 	 	12,460 	 	8,845 	 	8,920 	 	7,540 	 	7,740 	 	141,976	 
 	 	255 	A	 	 	 	 	 	 	 	 	 	 	255 	A
 	 	3,760 	CN	2,360 	CN	2,345 	CN	2,420 	CN	1,240 	CN	1,240 	CN	13,365 	CN
 	 	9,876 	CT	 	 	 	 	 	 	 	 	 	 	9,876 	CT
 	 	76,629 	FB	9,600 	FB	6,000 	FB	6,000 	FB	5,800 	FB	6,000 	FB	110,029 	FB
 	 	927 	PB	 	 	 	 	 	 	 	 	 	 	927 	PB
 	 	4,724 	SB	500 	SB	500 	SB	500 	SB	500 	SB	500 	SB	7,224 	SB
 	 	300 	TB	 	 	 	 	 	 	 	 	 	 	300 	TB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
SANITATION	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78	MODERNIZATION OF SANITATION FACILITIES	980 	 	795 	 	140 	 	160 	 	 	 	480 	 	2,555	 
 	 	980 	CN	795 	CN	140 	CN	160 	CN	 	 	480 	CN	2,555 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78A 	MODERNIZATION OF SANITATION FAC-FY 04	377	 	 	 	 	 	 	 	 	 	 	 	377	 
 	 	377	CT	 	 	 	 	 	 	 	 	 	 	377	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78B 	MODERNIZATION OF SANITATION FAC-FY 03	51	 	 	 	 	 	 	 	 	 	 	 	51	 
 	 	51	CT	 	 	 	 	 	 	 	 	 	 	51	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78C 	SANITATION FACILITIES - MODERNIZATION-FY 02|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78D 	SANITATION FACILITIES-FY 99	60	 	 	 	 	 	 	 	 	 	 	 	60	 
 	 	60	CT	 	 	 	 	 	 	 	 	 	 	60	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
78E 	SANITATION FACILITIES-IMPROVEMENTS-FY 98|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
SANITATION	1,477 	 	795 	 	140 	 	160 	 	 	 	480 	 	3,052	 
 	 	980 	CN	795 	CN	140 	CN	160 	CN	 	 	480 	CN	2,555 	CN
 	 	497 	CT	 	 	 	 	 	 	 	 	 	 	497 	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
STREET LIGHTING	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 
79	STREET LIGHTING IMPROVEMENTS	1,250 	 	1,250 	 	1,250 	 	1,250 	 	1,250 	 	1,250 	 	7,500	 
 	 	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	1,500 	CN
 	 	1,000 	FB	1,000 	FB	1,000 	FB	1,000 	FB	1,000 	FB	1,000 	FB	6,000 	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
79A 	STREET LIGHTING IMPROVEMENTS-FY 03	850	 	 	 	 	 	 	 	 	 	 	 	850	 
 	 	250	CT	 	 	 	 	 	 	 	 	 	 	250	CT
 	 	600	SB	 	 	 	 	 	 	 	 	 	 	600	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
79B 	STREET LIGHTING-FY 02	641	 	 	 	 	 	 	 	 	 	 	 	641	 
 	 	641	CT	 	 	 	 	 	 	 	 	 	 	641	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
79C 	STREET LIGHTING-FY 97	100	 	 	 	 	 	 	 	 	 	 	 	100	 
 	 	100	CT	 	 	 	 	 	 	 	 	 	 	100	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
79D 	KELLY DRIVE STREET LIGHT MODERNIZ-FY 98	111	 	 	 	 	 	 	 	 	 	 	 	111	 
 	 	96	FB	 	 	 	 	 	 	 	 	 	 	96	FB
 	 	15	SB	 	 	 	 	 	 	 	 	 	 	15	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
STREET LIGHTING	2,952 	 	1,250 	 	1,250 	 	1,250 	 	1,250 	 	1,250 	 	9,202	 
 	 	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	250 	CN	1,500 	CN
 	 	991 	CT	 	 	 	 	 	 	 	 	 	 	991 	CT
 	 	1,096 	FB	1,000 	FB	1,000 	FB	1,000 	FB	1,000 	FB	1,000 	FB	6,096 	FB
 	 	615 	SB	 	 	 	 	 	 	 	 	 	 	615 	SB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
STREETS DEPARTMENT FACILITIES	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80	STREETS DEPARTMENT SUPPORT FACILITIES	185 	 	185 	 	50 	 	50 	 	50 	 	50 	 	570	 
 	 	185 	CN	185 	CN	50 	CN	50 	CN	50 	CN	50 	CN	570 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80A 	STREETS DEPARTMENT SUPPORT FACILITIES-FY 04	390	 	 	 	 	 	 	 	 	 	 	 	390	 
 	 	390	CT	 	 	 	 	 	 	 	 	 	 	390	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80B 	STREETS DEPARTMENT SUPPORT FACILITIES-FY 03	410	 	 	 	 	 	 	 	 	 	 	 	410	 
 	 	410	CT	 	 	 	 	 	 	 	 	 	 	410	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80C 	STREETS DEPARTMENT SUPPORT FACILITIES-FY 02	16	 	 	 	 	 	 	 	 	 	 	 	16	 
 	 	16	CT	 	 	 	 	 	 	 	 	 	 	16	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80D 	STREETS DEPT SUPPORT FACIL - RENOV-FY 00	67	 	 	 	 	 	 	 	 	 	 	 	67	 
 	 	67	CT	 	 	 	 	 	 	 	 	 	 	67	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
80E 	STREETS DEPT SUPPORT FACIL - RENOV-FY 99	10	 	 	 	 	 	 	 	 	 	 	 	10	 
 	 	10	CT	 	 	 	 	 	 	 	 	 	 	10	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
STREETS DEPARTMENT FACILITIES	1,078 	 	185 	 	50 	 	50 	 	50 	 	50 	 	1,463	 
 	 	185 	CN	185 	CN	50 	CN	50 	CN	50 	CN	50 	CN	570 	CN
 	 	893 	CT	 	 	 	 	 	 	 	 	 	 	893 	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
TRAFFIC ENGINEERING IMPS	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
81	SCHOOL/PEDESTRIAN CROSSING SIGNS AND SIGNALS	200 	 	200 	 	60 	 	60 	 	60 	 	60 	 	640	 
 	 	200 	CN	200 	CN	60 	CN	60 	CN	60 	CN	60 	CN	640 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
81A 	SCHOOL/PEDESTRIAN CROSSING SIGNS/SIGNALS-FY 04	300	 	 	 	 	 	 	 	 	 	 	 	300	 
 	 	300	CT	 	 	 	 	 	 	 	 	 	 	300	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82	TRAFFIC CONTROL	1,050 	 	1,000 	 	950 	 	950 	 	950 	 	950 	 	5,850	 
 	 	1,050 	CN	1,000 	CN	950 	CN	950 	CN	950 	CN	950 	CN	5,850 	CN
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82A 	TRAFFIC CONTROL-FY 04	827	 	 	 	 	 	 	 	 	 	 	 	827	 
 	 	827	CT	 	 	 	 	 	 	 	 	 	 	827	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82B 	TRAFFIC CONTROL-FY 03	38	 	 	 	 	 	 	 	 	 	 	 	38	 
 	 	38	CT	 	 	 	 	 	 	 	 	 	 	38	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82C 	TRAFFIC CONTROL-FY 02	45	 	 	 	 	 	 	 	 	 	 	 	45	 
 	 	45	CT	 	 	 	 	 	 	 	 	 	 	45	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82D 	TRAFFIC CONTROL-FY 01|99| 	 	 	 	 	 	 	 	 	 	 |99| 
 	 |99|CT	 	 	 	 	 	 	 	 	 	 |99|CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82E 	TRAFFIC CONTROL-FY 97	611	 	 	 	 	 	 	 	 	 	 	 	611	 
 	 	148	CT	 	 	 	 	 	 	 	 	 	 	148	CT
 	 	463	FB	 	 	 	 	 	 	 	 	 	 	463	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82F 	CONVERTING TO LED SIGNAL INDICATIONS-FY 04	750	 	 	 	 	 	 	 	 	 	 	 	750	 
 	 	225	CR	 	 	 	 	 	 	 	 	 	 	225	CR
 	 	525	FB	 	 	 	 	 	 	 	 	 	 	525	FB
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82G 	REPLACING LED SIGNAL INDICATIONS-FY 04	375	 	 	 	 	 	 	 	 	 	 	 	375	 
 	 	375	CR	 	 	 	 	 	 	 	 	 	 	375	CR
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
82H 	FLRSCNT YELLOW-GREEN SCHOOL/PED SIGNS-FY 03	43	 	 	 	 	 	 	 	 	 	 	 	43	 
 	 	43	CT	 	 	 	 	 	 	 	 	 	 	43	CT
 	 	 	 	 	 	 	 	 	 	 	 	 	 	 	 
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
TRAFFIC ENGINEERING IMPS	4,241 	 	1,200 	 	1,010 	 	1,010 	 	1,010 	 	1,010 	 	9,481	 
 	 	1,250 	CN	1,200 	CN	1,010 	CN	1,010 	CN	1,010 	CN	1,010 	CN	6,490 	CN
 	 	600 	CR	 	 	 	 	 	 	 	 	 	 	600 	CR
 	 	1,403 	CT	 	 	 	 	 	 	 	 	 	 	1,403 	CT
 	 	988 	FB	 	 	 	 	 	 	 	 	 	 	988 	FB
STREETS	169,068	 	55,620	 	65,395 	 	23,690	 	27,250 	 	28,930 	 	369,953	 
 	 	1,122	A	  		 	 	  	 	 	 	 		1,122 	A
 	 	18,227	CN	18,116 	CN	16,535	CN	12,450	CN	11,620 	CN	12,200 	CN	89,148 	CN
 	 	600	CR	 	 	 	 		 	 	 	 	 	600 	CR
 	 	28,794	CT	 	 	 	 	  	 	 	 	 		28,794 	CT
 	 	106,874	FB	33,228 	FB	41,924	FB	10,156	FB	13,832 	FB	14,792 	FB	220,806 	FB
 	 	1,923	PB	 	 	 	 	  	 	 	 	 		1,923 	PB
 	 	11,228	SB	4,276 	SB	6,936	SB	1,084	SB	1,798 	SB	1,938 	SB	27,260 	SB
 	 	300	TB	 	 	 	 	 	 	 	 	 	 	300 	TB
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
TRANSIT															
															
															
TRANSIT IMPROVEMENTS - SEPTA															
															
83	SEPTA BRIDGE, TRACK, SIGNAL, AND INFRASTRUCTURE
 IMPROVEMENTS	133,916 		135,667 		95,539 		89,270 		161,949 		127,031 		743,372	
		3,948 	CN	3,934 	CN	3,082 	CN	2,927 	CN	4,615 	CN	3,104 	CN	21,610	CN
		91,760 	FO	90,134 	FO	70,191 	FO	66,790 	FO	103,988 	FO	68,052 	FO	490,915	FO
		37,702 	SO	40,977 	SO	22,150 	SO	19,505 	SO	52,562 	SO	54,743 	SO	227,639	SO
		506 	TO	622 	TO	116 	TO	48 	TO	784 	TO	1,132 	TO	3,208	TO
															
83A 	SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 04	4,209												4,209	
		4,209	CT											4,209	CT
															
83B 	SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 03	387												387	
		387	CT											387	CT
															
83C 	SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 02|99|										|99|
	|99|CT										|99|CT
															
83D 	SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 01	26												26	
		26	CT											26	CT
															
83E 	SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 00	10												10	
		10	CT											10	CT
															
83F 	SEPTA INFRASTRUCTURE IMPROVEMENTS-FY 98	269												269	
		269	CT											269	CT
															
83G 	SEPTA INFRASTRUCTURE IMPROVEMENTS -FY 97	698												698	
		698	CT											698	CT
															
83H 	SEPTA SUPPORT FACILITIES IMPS-FY 98	56												56	
		56	CT											56	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
83I 	SEPTA SUPPORT FACILITIES IMPS-FY 96	56												56	
		56	CT											56	CT
															
84	SEPTA STATION AND PARKING IMPROVEMENTS	41,257 		40,918 		13,624 		23,400 		30,113 		31,733 		181,045	
		1,266 	CN	1,235 	CN	400 	CN	780 	CN	1,003 	CN	1,059 	CN	5,743	CN
		33,006 	FO	32,734 	FO	10,899 	FO	18,720 	FO	24,091 	FO	25,386 	FO	144,836	FO
		6,875 	SO	6,819 	SO	2,272 	SO	3,900 	SO	5,019 	SO	5,288 	SO	30,173	SO
		110 	TO	130 	TO	53 	TO							293	TO
															
84A 	SEPTA STATION & PARKING IMPROVEMENTS-FY 04	789												789	
		789	CT											789	CT
															
84B 	SEPTA STATION & PARKING IMPROVEMENTS-FY 03	208												208	
		208	CT											208	CT
															
84C 	SEPTA STATION & PARKING IMPROVEMENTS-FY 00	17												17	
		17	CT											17	CT
															
84D 	SEPTA STATION & PARKING IMPROVEMENTS-FY 97	12												12	
		12	CT											12	CT
															
85	SEPTA VEHICLE/EQUIPMENT ACQUISITION AND
 IMPROVEMENT PROGRAM	19,782 		73,126 		116,146 		109,885 		22,504 		22,470 		363,913	
		509 	CN	1,749 	CN	2,847 	CN	2,714 	CN	560 	CN	659 	CN	9,038	CN
		12,017 	FO	54,901 	FO	90,117 	FO	85,108 	FO	15,203 	FO	15,176 	FO	272,522	FO
		7,106 	SO	15,790 	SO	22,161 	SO	21,117 	SO	6,551 	SO	6,545 	SO	79,270	SO
		150 	TO	686 	TO	1,021 	TO	946 	TO	190 	TO	90 	TO	3,083	TO
															
85A 	SEPTA VEHICLE/EQUIP ACQUISITION/IMP PROG-FY 04	388												388	
		388	CT											388	CT
															
85B 	SEPTA BUS/RAIL VEH/EQUIP ACQ/OVRHL PR-FY 02	17												17	
		17	CT											17	CT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
85C 	SEPTA BUS/RAIL VEHICLE/EQUIP ACQ PROG-FY 01|99|										|99|
	|99|CT										|99|CT
															
85D 	SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 99	25												25	
		25	CT											25	CT
															
85E 	SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 98	1,762												1,762	
		1,762	CT											1,762	CT
															
85F 	SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 97	23												23	
		23	CT											23	CT
															
86	SEPTA PASSENGER INFORMATION, COMMUNICATIONS, AND
 SYSTEM CONTROLS	3,000 		7,856 		3,834 								14,690	
		57 	CN	155 	CN	98 	CN							310	CN
		2,400 	FO	6,028 	FO	2,810 	FO							11,238	FO
		500 	SO	1,566 	SO	896 	SO							2,962	SO
		43 	TO	107 	TO	30 	TO							180	TO
															
86A 	SEPTA PASSEN INFO/COMMUN/SYS CON IMPS-FY 03	95												95	
		95	CT											95	CT
															
															
86B 	SEPTA PASSEN INFO/COMMUN/SYS CON IMPS-FY 01	36												36	
		36	CT											36	CT
															
															
TRANSIT IMPROVEMENTS - SEPTA	207,040 		257,567 		229,143 		222,555 		214,566 		181,234 		1,312,105	
		5,780 	CN	7,073 	CN	6,427 	CN	6,421 	CN	6,178 	CN	4,822 	CN	36,701	CN
		9,085 	CT											9,085	CT
		139,183 	FO	183,797 	FO	174,017 	FO	170,618 	FO	143,282 	FO	108,614 	FO	919,511	FO
		52,183 	SO	65,152 	SO	47,479 	SO	44,522 	SO	64,132 	SO	66,576 	SO	340,044	SO
		809 	TO	1,545 	TO	1,220 	TO	994 	TO	974 	TO	1,222 	TO	6,764	TO
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
TRANSIT	207,040 		257,567 		229,143 		222,555 		214,566 		181,234 		1,312,105	
		5,780 	CN	7,073 	CN	6,427 	CN	6,421 	CN	6,178 	CN	4,822 	CN	36,701	CN
		9,085 	CT											9,085	CT
		139,183 	FO	183,797 	FO	174,017 	FO	170,618 	FO	143,282 	FO	108,614 	FO	919,511	FO
		52,183 	SO	65,152 	SO	47,479 	SO	44,522 	SO	64,132 	SO	66,576 	SO	340,044	SO
		809 	TO	1,545 	TO	1,220 	TO	994 	TO	974 	TO	1,222 	TO	6,764	TO
															
															
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
WATER															
															
															
COLLECTOR SYSTEMS - CAPITAL															
															
87	IMPROVEMENTS TO COLLECTOR SYSTEM	24,510 		22,660 		22,660 		22,660 		22,660 		22,660 		137,810	
		10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	60	PB
		24,000 	XN	22,150 	XN	22,150 	XN	22,150 	XN	22,150 	XN	22,150 	XN	134,750	XN
		500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	3,000	XR
															
87A 	COLLECTOR SYSTEM-FY 04	24,000												24,000	
		500	XR											500	XR
		23,500	XT											23,500	XT
															
87B 	COLLECTOR SYSTEM-FY 03	8,738												8,738	
		500	XR											500	XR
		8,238	XT											8,238	XT
															
87C 	COLLECTOR SYSTEM-FY 02	91												91	
		91	XT											91	XT
															
87D 	RECONSTRUCTION OF COLLECTOR SYSTEM-FY 01	222												222	
		222	XT											222	XT
															
87E 	RECONSTRUCTION OF COLLECTOR SYSTEM-FY 00	41												41	
		41	XT											41	XT
															
88	STORM FLOOD RELIEF / COMBINED SEWER OVERFLOW	4,000 		4,000 		4,000 		4,000 		4,000 		4,000 		24,000	
		4,000 	XN	4,000 	XN	4,000 	XN	4,000 	XN	4,000 	XN	4,000 	XN	24,000	XN
															
88A 	STORM FLOOD RELIEF/COMB SEWER OVRFLO-FY 04	4,000												4,000	
		4,000	XT											4,000	XT
															
88B 	STORM FLOOD RELIEF/COMB SEWER OVRFLO-FY 03	4,000												4,000	
		4,000	XT											4,000	XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
88C 	STORM FLOOD RELIEF-FY 02	6,000												6,000	
		6,000	XT											6,000	XT
															
88D 	STORM FLOOD RELIEF-FY 01	2,764												2,764	
		2,764	XT											2,764	XT
															
88E 	STORM FLOOD RELIEF-FY 00	5,829												5,829	
		5,829	XT											5,829	XT
															
88F 	STORM FLOOD RELIEF-FY 99	8,589												8,589	
		8,589	XT											8,589	XT
															
88G 	STORM FLOOD RELIEF-FY 98	5,046												5,046	
		5,046	XT											5,046	XT
															
COLLECTOR SYSTEMS - CAPITAL	97,830 		26,660 		26,660 		26,660 		26,660 		26,660 		231,130	
		10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	60	PB
		28,000 	XN	26,150 	XN	26,150 	XN	26,150 	XN	26,150 	XN	26,150 	XN	158,750	XN
		1,500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	4,000	XR
		68,320 	XT											68,320	XT
															
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CONVEYANCE SYSTEMS - CAPITAL															
															
89	IMPROVEMENTS TO CONVEYANCE SYSTEM	21,930 		21,930 		21,930 		21,930 		21,930 		21,930 		131,580	
		10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	60	PB
		21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	128,520	XN
		500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	3,000	XR
															
89A 	CONVEYANCE SYSTEM-FY 04	21,620												21,620	
		500	XR											500	XR
		21,120	XT											21,120	XT
															
89B 	CONVEYANCE SYSTEM-FY 03	7,449												7,449	
		500	XR											500	XR
		6,949	XT											6,949	XT
															
89C 	CONVEYANCE SYSTEM-FY 02	1,103												1,103	
		1,103	XT											1,103	XT
															
89D 	RECONSTRUCTION OF CONVEYANCE SYSTEM-FY 01	778												778	
		778	XT											778	XT
															
89E 	RECONSTRUCTION OF CONVEYANCE SYSTEM-FY 00	16												16	
		16	XT											16	XT
															
89F 	EXPANSION OF CONVEYANCE SYSTEM-FY 00	51												51	
		51	XT											51	XT
															
89G 	LARGE METER REPLACEMENT-FY 04	13												13	
		13	XT											13	XT
															
89H 	LARGE METER REPLACEMENT-FY 03	300												300	
		300	XT											300	XT
															
89I 	LARGE METER REPLACEMENT-FY 02	35												35	
		35	XT											35	XT
															
89J 	LARGE METER REPLACEMENT-FY 01|99|										|99|
	|99|XT										|99|XT
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
CONVEYANCE SYSTEMS - CAPITAL	53,301 		21,930 		21,930 		21,930 		21,930 		21,930 		162,951	
		10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	10 	PB	60	PB
		21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	21,420 	XN	128,520	XN
		1,500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	500 	XR	4,000	XR
		30,371 	XT											30,371	XT
															
															
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
GENERAL - CAPITAL															
															
90	ENGINEERING AND ADMINISTRATION	18,604 		19,270 		19,899 		20,496 		21,111 		21,745 		121,125	
		17,122 	XN	17,744 	XN	18,276 	XN	18,824 	XN	19,389 	XN	19,971 	XN	111,326	XN
		1,482 	XR	1,526 	XR	1,623 	XR	1,672 	XR	1,722 	XR	1,774 	XR	9,799	XR
															
90A 	GIS-FY 99	2,415												2,415	
		2,415	XT											2,415	XT
															
91	VEHICLES	4,000 		4,000 		4,000 		4,000 		4,000 		4,000 		24,000	
		4,000 	XR	4,000 	XR	4,000 	XR	4,000 	XR	4,000 	XR	4,000 	XR	24,000	XR
															
91A 	VEHICLES-FY 04	1,464												1,464	
		1,464	XR											1,464	XR
															
91B 	VEHICLES-FY 03	3,698												3,698	
		3,698	XR											3,698	XR
															
91C 	VEHICLES-FY 02	268												268	
		268	XR											268	XR
															
GENERAL - CAPITAL	30,449 		23,270 		23,899 		24,496 		25,111 		25,745 		152,970	
		17,122 	XN	17,744 	XN	18,276 	XN	18,824 	XN	19,389 	XN	19,971 	XN	111,326	XN
		10,912 	XR	5,526 	XR	5,623 	XR	5,672 	XR	5,722 	XR	5,774 	XR	39,229	XR
		2,415 	XT											2,415	XT
															
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
TREATMENT FACILITIES - CAPITAL															
															
92	IMPROVEMENTS TO TREATMENT FACILITIES	46,000 		42,000 		42,000 		42,000 		42,000 		42,000 		256,000	
		36,153 	XN	31,978 	XN	31,875 	XN	31,724 	XN	31,574 	XN	31,426 	XN	194,730	XN
		9,847 	XR	10,022 	XR	10,125 	XR	10,276 	XR	10,426 	XR	10,574 	XR	61,270	XR
															
92A 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 04	48,440												48,440	
		9,645	XR											9,645	XR
		38,795	XT											38,795	XT
															
92B 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 03	14,182												14,182	
		362	XR											362	XR
		13,820	XT											13,820	XT
															
92C 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 02	539												539	
		48	XR											48	XR
		491	XT											491	XT
															
92D 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 01	350												350	
		250	XR											250	XR
		100	XT											100	XT
															
92E 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 00	2,440												2,440	
		2,440	XT											2,440	XT
															
92F 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 99	323												323	
		323	XT											323	XT
															
92G 	IMPROVEMENTS TO TREATMENT FACILITIES-FY 97|99|										|99|
	|99|XT										|99|XT
															
															
TREATMENT FACILITIES - CAPITAL	112,280 		42,000 		42,000 		42,000 		42,000 		42,000 		322,280	
		36,153 	XN	31,978 	XN	31,875 	XN	31,724 	XN	31,574 	XN	31,426 	XN	194,730	XN
		20,152 	XR	10,022 	XR	10,125 	XR	10,276 	XR	10,426 	XR	10,574 	XR	71,575	XR
		55,975 	XT											55,975	XT
															
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
															
WATER	293,860 		113,860 		114,489 		115,086 		115,701 		116,335 		869,331	
		20 	PB	20 	PB	20 	PB	20 	PB	20 	PB	20 	PB	120	PB
		102,695 	XN	97,292 	XN	97,721 	XN	98,118 	XN	98,533 	XN	98,967 	XN	593,326	XN
		34,064 	XR	16,548 	XR	16,748 	XR	16,948 	XR	17,148 	XR	17,348 	XR	118,804	XR
		157,081 	XT											157,081	XT
														
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
ZOOLOGICAL GARDENS															
															
															
PHILADELPHIA ZOO - CAPITAL															
92U 	PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 04	11,555												11,555	
		1,560	CT											1,560	CT
		9,995	PB											9,995	PB
															
92V 	PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 03	3,778												3,778	
		1,268	CT											1,268	CT
		2,510	PB											2,510	PB
															
92W 	PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 02	1,078												1,078	
		1,048	CT											1,048	CT
		30	PB											30	PB
															
															
92X 	PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 01	268												268	
		268	CT											268	CT
															
															
92Y 	PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 00	31												31	
		31	CT											31	CT
															
92Z 	PHILA ZOO FACILITIES/UTILITIES- IMPS-FY 99|99|										|99|
	|99|CT										|99|CT
															
PHILADELPHIA ZOO - CAPITAL	16,714 												16,714	
		4,179 	CT											4,179	CT
		12,535 	PB											12,535	PB
															
																																								
 	 	2005	2006	2007	2008	2009 	2010	2005 - 2010 
	 	 	 	 	 	 	 	 	 	 	 	 
 	 	$x000	 $x000	$x000 	$x000 	$x000 	$x000	$x000
ZOOLOGICAL GARDENS	16,714 												16,714	
		4,179 	CT											4,179	CT
		12,535 	PB											12,535	PB
End
Philadelphia City Planning Commission
Prior Year 
1998
1999
2000
2001
2002
2003
1998-2003
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000
$ x 000